Presentation - Critical Minerals & Energy Investment Conf
Released
Released
Announcement PDF
Presentation to the Critical Minerals &
Energy Investment Conference
Presenter:
Scott Winter, Managing Director
4 March 2024
ASX:CMG
Important Information
Critical Minerals Group Limited ACN 652 994 726 (CMG or the company) is the issuer of this presentation.
Securities Disclaimer
This presentation is for informational purposes only and does not constitute an offer to sell, or solicit to purchase, any securities.
Reliance on Presentation
A recipient of this presentation must make their own assessment of the matters contained herein and rely on their own investigations and judgment in making an investment in CMG. This presentation does not purport to contain all of the
information a recipient of this presentation may require to make an informed decision whether to invest in CMG. Specifically, this presentation does not purport to contain all the information that investors and their professional advisers would
reasonably require to make an informed assessment of CMG’s assets and liabilities, financial position and performance, profits, losses and prospects.
No Recommendation
The information in this presentation is not a recommendation to acquire shares and does not constitute financial advice. Any person who intends to acquire shares must conduct their own investigations, assessment and analysis of CMG and its
operations and prospects and must base their investment decision solely on those investigations and that assessment and analysis. Prospective investors should consult their own legal, accounting, tax and financial advisers about an investment
in CMG.
JORC Statement
The information in this presentation relating to Mineral Resources is extracted from the company’s ASX announcement titled ‘Lindfield Vanadium Project Delivers Improved Mineral Resources Estimate with Grade and Tonnage to World Class
Scale’ dated 16 May 2023 which is available to view on www.asx.com.au. The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that
all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcement.
Production targets and forecast financial information
The information in this presentation that relates to production targets and forecast financial information derived from a production target is extracted from the company’s ASX announcement dated 9 November 2023 (“Revised release of
Scoping Study results”) available to view at www.asx.com.au (Scoping Study Announcement). The company confirms that all material assumptions underpinning the production targets and forecast financial information derived from
production targets set out in the Scoping Study Announcement continue to apply and have not materially changed.
Scoping Study cautionary statement
The Scoping Study referred to in this presentation is based on the Scoping Study released by the company to ASX in the Scoping Study Announcement.
The company advised that the Scoping Study has been undertaken to consider the development of the Lindfield Vanadium Project. It is a preliminary technical and economic study of the potential viability of the Lindfield Vanadium project. It is
based on low-level technical and economic assessments that are not sufficient to support the estimation of ore reserves. Further evaluation work and appropriate studies are required before the company will be in a position to estimate any
ore reserves or to provide an assurance of an economic development case. There is a low level of geological confidence associated with any Inferred Mineral Resources, and there is no certainty that further exploration work will result in the
determination of Measured or further Indicated Mineral Resources or that the Production Schedule or preliminary economic assessment will be realised.
The Scoping Study is based on the material assumptions outlined in the Scoping Study Announcement. These include assumptions about the availability of funding. While the company considers all of the material assumptions to be based on
reasonable grounds, there is no certainty that they will prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved.
22
Important Information
To achieve the range of outcomes indicated in the Scoping Study, additional funding will be required. The company has a supportive shareholder base and has successfully raised capital to progress the project in the past. However, investors
should note that there is no certainty that the company will be able to raise the amount of funding required to develop the project when needed. It is also possible that such funding may only be available on terms that may be dilutive or
otherwise affect the value of the company’s existing shares. It is also possible that the company could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the Lindfield Vanadium project. If it does, this could
materially reduce the company’s proportionate ownership of the project.
The Scoping Study results contained in this presentation relate solely to the Lindfield Vanadium project and do not include Exploration Targets or Mineral Resources defined elsewhere. The company has concluded it has a reasonable basis for
providing the forward-looking statements included in this presentation.
Given the uncertainties involved, investors should not make any investment decisions based solely on the results of the Scoping Study.
Forward Looking Statements
This presentation contains ‘forward-looking statements’ that are based on the company’s expectations, estimates and projections as of the date on which the statements were made. These forward-looking statements may include, among
other things, statements with respect to prefeasibility and definitive feasibility studies, the company’s business strategy, plans, development, objectives, performance, outlook, growth, cash flow, projections, targets and expectations, mineral
reserves and resources, results of exploration and related expenses. Generally, this forward-looking information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’,
‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons reading this presentation are cautioned that such statements are only predictions, and that the
company’s actual future results or performance may be materially different. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the company’s actual results, level of activity,
performance or achievements to be materially different from those expressed or implied by such forward-looking information. Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors
set out herein. The forward-looking statements included in this presentation speak only as of the date of this presentation. Except where required by law or the ASX Listing Rules, the company does not intend to update or revise the forwardlooking statements in this presentation in the future.
Limited Responsibility for Information
CMG makes no representation about the likelihood of a matter, about which a forward looking statement is made, occurring. CMG and its directors, employees, agents, advisers and consultants give no representation or warranty to a recipient
of this presentation as to the accuracy or completeness of the statements contained in this presentation or in relation to any other matter; and to the full extent permitted by law, disclaim responsibility for and have no liability to a recipient of
this presentation for any error or omission in or for any statement in this presentation.
Competent Person Statements
The information above that relates to Mineral Resource estimates is based on, and fairly represents, information compiled by Adrian Buck, a Competent Person, who is a Member of the Australasian Institute of Mining and Metallurgy
(AusIMM). Adrian Buck is the Principal Geologist – Australia for John T Boyd Company. Adrian Buck has sufficient experience with the style of mineralisation and type of deposit under consideration, and to the activities undertaken to qualify as
a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves’. Adrian Buck consents to the inclusion of the matters based on their
information in the form and context in which it appears. The information above that relates to metallurgy and metallurgical test work is based on, and fairly represents, information compiled by Nicola Semler, a Competent Person, who is a
Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Nicola Semler is the Metallurgist and Chief Technical Officer – CMG. Nicola Semler has sufficient experience with the style of mineralisation and type of deposit under
consideration, and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves’. Nicola
Semler consents to the inclusion of the matters based on their information in the form and context in which it appears. The information above that relates to mining engineering and mine planning is based on, and fairly represents, information
compiled by Gary Benson. Mr Benson BE is a Mining Engineer with 40 years of experience and is a Fellow of the Australasian Institute of Mining and Metallurgy (FAusIMM). Mr Benson has sufficient experience, which is relevant to the style of
mineralisation, geology and type of deposit under consideration and to the activity being undertaken to qualify as a competent person under the 2012 edition of the Australasian Code for Reporting Exploration Results, Mineral Resources and
Ore Reserves (the JORC Code, 2012); Mr Benson is an Associate of Measured, is independent of CMG; and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to the exploration results, exploration targets and mineral resources for the Company’s Lindfield Vanadium Project was first reported by the Company in the Company’s prospectus dated 25
May 2022 and ASX announcements dated 22 February 2023, 13 March 2023 and 16 May 2023. The Company confirms that it is not aware of any new information or data that materially affects the exploration results, exploration targets and
mineral resources, and that all material assumptions and technical parameters underpinning these continue to apply and have not materially changed. Where the Company refers to exploration results or mineral resources in this
announcement (referencing previous releases made to the ASX), it confirms that it is not aware of any new information or data that materially affects the information included in that announcement and all material assumptions and technical
parameters underpinning the exploration results or mineral resources estimate in that announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Persons
findings are presented have not materially changed from the original announcement.
33
About CMG
Purpose
To support global communities
through an energy transition
that will deliver a more
sustainable and responsible
future.
Vision
To be a leading high-quality
manufacturer of vanadium
battery products for the energy
storage market and deliver
responsible and robust returns.
4
About CMG
Critical Minerals Group Process
MINING
SCRUBBING
SCREENING
FLOTATION
ROASTING
LEACHING
SOLVENT
EXTRACTION
AMMONIUM
METAVANADATE
PRECIPITATION
DEAMMONIATION
VANADIUM
PENTOXIDE
VANADIUM
ELECTROLYTE
5
About CMG
Critical Minerals Group Process
Battery Manufacture Process
End to End Vanadium Redox Flow Battery Process
6
Renewable intermittent unstable energy that needs
Battery storage to stabilise
7
Renewable intermittent unstable energy that needs
Battery storage to stabilise
Battery Storage potential
8
Annual Installed VRFB Utility-Scale and Commercial and Industrial
Deployment Revenue by Region
Government investment in the Path to Net Zero 2050
CMG is seeking to leverage the significant grants and incentives put in place to develop domestic production of vanadium,
particularly for use in Vanadium Batteries as a grid-scale energy solution
CopperString 2032 Transmission Line
Project
$5.0bn project
to run from a substation
on the Ross to Strathmore transmission line located
south of Townsville to a substation near Cloncurry and
then onwards to Mount Isa.
Vanadium Demonstration Plant
$70m Fully funded
(QLD Gov) to build plant in Townsville, EPC
awarded to Sedgman.
Battery Manufacturing Queensland
$100m
National Battery Testing Centre (NBTC)
$50m project and $15m
funded
(QLD Gov). NBTC will look at Vanadium flow
battery development & standards.
https://statements.qld.gov.au/statements/99762
Federal government commitment to develop
battery manufacturing in QLD
Vanadium Processing Pilot Plant
$1.265m grant
(Federal Gov) awarded to Brisbane Met Labs
Global Demand
Vanadium
Batteries
Globally there are currently
today, 7.4GWh
of vanadium batteries planned
or under construction,
requiring approximately
65,000t
of vanadium pentoxide.
“There is potentially $500 billion
dollars of critical minerals in the
North West Minerals Province and
vanadium is one of the commodities
Queensland can supply to the
world."
- Resources Minister and Townsville
MP Scott Stewart
10
Global Vanadium Reserves
Russia
19.6%
Est. Global Vanadium Metal
Reserves
China
63m
tons
37.2%
South Africa
13.7%
Source: U.S. Geological Survey, mineral commodity summaries. January 2022
Australia
28.9%
11
Local Vanadium Deposits
China
37.2%
Australia
28.9%
Russia
19.6%
South Africa
13.7%
Queensland
48.9%*
• With 28.9% of total global Vanadium contained in
Australia, Queensland holds 48.9%* of the total
Australian deposit
• Queensland has a vast and economic source of
vanadium and a new secure, safe and accessible
supply chains to provide vanadium electrolyte for
vanadium batteries.
*Sourced from publicly available data on the web from companies with declared mineral resource estimates containing vanadium pentoxide February 2024
12
Successful Scoping Study 9 Nov 2023
Harnessing High-Grade, Low Strip Ratio,
Long-Life Vanadium Assets to assist in
Queensland’s commitment to a Sustainable
Future
Townsville
Julia Creek
Queensland
Brisbane
Refer ASX Release – “Revised Release of Scoping Study Results” - 9 November 2023
13
The Lindfield Vanadium Project Highlights
Vanadium and High-Purity Alumina (HPA)
Positive
Scoping Study2
Vanadium Electrolyte for
Batteries
Large Scale Resource1
Vanadium Project has both the practical
and financial attributes to potentially
develop a successful 4 million tonne per
annum ROM vanadium mine producing
vanadium pentoxide.
Strategy is to manufacture electrolyte for
vanadium batteries and processing results
to date indicate we are on the pathway
to electrolyte production.
Ideal Location
Regulatory
HPA Secondary Product
Located in rich vanadium mineral zone,
close to infrastructure, services, and other
advanced mines. Located close to Julia
Creek, main highway and rail, power and
water.
State and federal governments engaged in
Approvals pathways.
Potential for HPA production as
part of the vanadium processing
operations. Used for Lithium battery
separator, LED’s, Sapphire glass.
Lindfield Resources of 363 Mt @0.43%
V2O5, includes Indicated Resource of 104
Mt @ 0.48% V2O5 in oxidised zone which is
showing good recoveries. Large-scale
operational opportunity.
1 - Refer ASX Release – “Resource Upgrade” –16 May 2023
2 - Refer ASX Release – “Revised Release of Scoping Study Results” - 9 November 2023
14
Lindfield Vanadium Project in numbers
4 Million Tonnes
$400m Capital Cost
$510m NPV
The Project has the practical and financial
attributes to potentially develop a
successful 4 million tonne per annum ROM
vanadium mine.
Estimated direct capital costs (excluding indirect
costs, EPCM, owners’ costs and contingency).
Assuming USD$9.50 / lb 98.5% V₂O₅,
USD$57.5 / kg 99% MoO3 , FX of $0.68 and
Royalty Rate 2.5%).
17% IRR
Long Mine Life
Additional HPA
Potential after-tax IRR of approximately
17%, from the vanadium pentoxide and
molybdenum trioxide products streams.
With the opportunity to expand LOM
with potential upside in Resource subject
to further evaluation.
Has also been confirmed as a potential
product providing future upside for the
project subject to further evaluation and
modelling.
See ASX Release – “Resource Upgrade” –16 May 2023
See ASX Release – “Revised Release of Scoping Study Results” - 9 November 2023
15
62MWh
Vanadium
Battery
~250,000
tonnes
Vanadium
pentoxide ore
8,600
620 tonnes
V2O5
West End
Homes
~6,800
tonnes
electrolyte
Brisbane
16
Vanadium Batteries – Proven technology powering cities
Why are they favoured?
17
Vanadium Batteries – Proven technology powering cities
Why are they favoured?
Safe and non-flammable
18
Vanadium Batteries – Proven technology powering cities
Why are they favoured?
Safe and non-flammable
Vanadium electrolyte is 100% recyclable and reusable
19
Vanadium Batteries – Proven technology powering cities
Why are they favoured?
Safe and non-flammable
Vanadium electrolyte is 100% recyclable and reusable
30 year plus lifespan with complete discharge and minimal
deterioration
20
Vanadium Batteries – Proven technology powering cities
Why are they favoured?
Safe and non-flammable
Vanadium electrolyte is 100% recyclable and reusable
30 year plus lifespan with complete discharge and minimal
deterioration
Scale-able with unlimited capacity
21
Vanadium Batteries – Proven technology powering cities
Why are they favoured?
Safe and non-flammable
Vanadium electrolyte is 100% recyclable and reusable
30 year plus lifespan with complete discharge and minimal
deterioration
Scale-able with unlimited capacity
Medium to long term storage 3-10 hours with rapid response (millisecs)
22
ESG Vision
Aiming to meet the growing demand
for minerals to achieve a
Carbon Neutral Future.
23
ESG Focus
CMG Environmental, Social and Governance Policy is centred around four key principles
01
Ethics and Accountability
• Ethical values
• Trust
• Stakeholder Respect
and Engagement
24
ESG Focus
CMG Environmental, Social and Governance Policy is centred around four key principles
01
Ethics and Accountability
• Ethical values
• Trust
• Stakeholder Respect
and Engagement
02
Mineral Traceability
• Supply Chain
• Chain of Custody
25
ESG Focus
CMG Environmental, Social and Governance Policy is centred around four key principles
01
Ethics and Accountability
03
Community and People
• Ethical values
• Trust
• Stakeholder Respect
and Engagement
02
Mineral Traceability
• Supply Chain
• Chain of Custody
• Local community
• Traditional Owners
26
ESG Focus
CMG Environmental, Social and Governance Policy is centred around four key principles
01
Ethics and Accountability
03
Community and People
• Ethical values
• Trust
• Stakeholder Respect
and Engagement
• Local community
• Traditional Owners
02
Mineral Traceability
04
Environmental Management
• Resource Optimisation
and Site rehabilitation
• Water Management
• Energy Efficiency
• Supply Chain
• Chain of Custody
27
Milestones Achieved to Date
In Advancing Towards Production
2023
✓ Commencement of metallurgical
testwork
✓ Complete initial metallurgical testwork
✓ Complete scoping study
✓ Drilling – bulk sample collection
Q1
Q3
Q2
Q4
✓ Commencement of scoping study
✓ Pilot Plant preparatory test work and planning
✓ Approvals Strategy
✓ Feasibility Study review
✓ Technology license with Lava Blue
✓ Scoping Study results
✓ Reviewing partners for next phase of feasibility study
✓ Commencement of environmental study works
✓ Commenced engagement with Director General’s Office
Strategic
Milestones
Direction
Achieved to Date
Strong
In Advancing
Developments
Towards
Going
Production
Forward
2024 Targets
Ø Vanadium Electrolyte manufacturing strategy
Ø Commence Queensland Critical Minerals and Battery
Technology Fund grant application
Ø Completion of pre-feasibility study – Lindfield Project
Ø Continue environmental study works
Ø Explore additional grant and R&D support opportunities
Ø Exploring potential collaboration and partnership agreements on
development infrastructure
Ø Completion of Pilot Plant construction and
commencement of processing test work
Ø Upgrading JORC Mineral Resource Estimate
with the addition of TLB-A mineralisation
Milestones Achieved to Date
Strategic Direction
2023
2024 Targets
In Advancing Towards Production
Strong Developments Going Forward
Q1
✓ Commencement of metallurgical testwork
Ø Vanadium Electrolyte manufacturing strategy
Q2
✓ Commencement of scoping study
Ø Commence Queensland Critical Minerals and Battery
Technology Fund grant application
Q3
✓ Complete initial metallurgical testwork
✓ Complete scoping study
✓ Drilling – bulk sample collection
Ø Completion of pre-feasibility study – Lindfield Project
Ø Continue environmental study works
Ø Explore additional grant and R&D support opportunities
Q4
✓ Pilot Plant preparatory test work and planning
✓ Approvals Strategy
✓ Feasibility Study review
✓ Technology license with Lava Blue
✓ Scoping Study results
✓ Reviewing partners for next phase of feasibility study
✓ Commencement of environmental study works
✓ Commenced engagement with Director General’s Office
Ø Exploring potential collaboration and partnership agreements on
development infrastructure
Ø Completion of Pilot Plant construction and
commencement of processing test work
Ø Upgrading JORC Mineral Resource Estimate
with the addition of TLB-A mineralisation
Board of Directors & Executive Leadership Team
Scott Winter
Alan Broome. AM
Managing Director
Chairman
•
•
•
•
•
•
Extensive Mining & Board experience
Emeritus Chairman of Austmine
Chairman of Strategic Minerals Plc
(AIM:SML.L)
Advisory Council to the CSIRO's
Mineral Resources Sector
Chairman of New Age Exploration
(ASX:NAE)
Awarded the Order of Australia (AM)
for services to mining
•
•
•
30 years of experience working
across large scall projects in the
resource sector.
Bachelor of Engineering - Mining
(Honours), a Graduate Diploma
Applied Finance and an MBA from
Melbourne Business School.
Previous roles include Chief
operation officer for Mineral
Resources Ltd (ASX:MIN)
•
•
•
Art Malone
Steve Kovac
Non-Exec Director
Non-Exec Director
Senior Energy and Resources
Executive.
15 years managing large scale
projects in the resource sector.
Managing Director of Graphinex
•
•
•
⁃
⁃
⁃
•
More than 20 years of experience in the
mining sector, with 15 years in senior
management and executive level roles
A degree qualified mining engineer (BE
(Mining) Hons) who also holds an MBA (Exec)
from the Australian Graduate School of
Management
CEO of Idemitsu Australia Pty Ltd, with
Directorships in the following organisations:
Delta Lithium Ltd
Vecco Group Pty Ltd
Low Emissions Technology Australia Ltd
A graduate of the Australian Institute of
Company Directors, a Fellow of the
Australian Institute of Mining and Metallurgy
and a member of the Mine Managers
Association of Australia
Stuart McClure
Non-Exec Director
•
•
•
•
•
•
Senior finance executive with 17
years experience.
Corporate adviser to public and
unlisted companies.
CEO Vested Equities
Executive Chairman of CopperX Ltd
an unlisted Copper exploration
project
Executive Chairman Charged Minerals
Bachelor of Business
31
Investment Highlights
Solid Investor Group
Government Support
Significant Upside
Significant institutional ownership and
tightly held register across founders and
directors.
Federal and State governments supporting
CMG and adjacent companies as key
participants in Target Net Zero by 2050.
opportunity in the mid stream Vanadium
Electrolyte manufacturing for Vanadium
batteries which is currently being
investigated.
Vast Opportunity
World Class Asset
Additional tenements providing the
potential for short term financial gain with
longer term upside opportunities.
World class vanadium asset with upside in
resource and additional mineral value –
HPA, other valuable by-products.
Experienced Board &
Management
Technical, construction and operations
supported by complementing board skills,
motivated to drive strategy.
32
Get in touch
33
Share your feedback
Discover