General Meeting Presentation
Released
Released
Announcement PDF
General Meeting Presentation
Delivering Australia’s Vanadium
Electrolyte Supply Chain
12 August 2026
( 2 )
Important Notice & Disclaimer
This presentation(Presentation) is dated 12 August 2026 andhas beenpreparedby CriticalMinerals GroupLimitedACN 652 994 726 (CMG or
theCompany). This presentationis of a summaryformonlyandtherefore containsgeneralbackground informationwhichmaynot be
complete. It shouldbe readinconjunction with, andfullreview made of, CMG’s most recent financial report andother periodic disclosures
andreleases lodgedwiththe AustralianSecurities Exchange (ASX) andavailable at www.asx.com.au.
Securities Disclaimer
This Presentationdoes not constitute an offer ofanysecuritiesinthe Company, in any jurisdiction, nor aninvitationtoapply for such
securities, inanyjurisdiction,andwill not formpart of anycontract for the acquisition of securities inthe Company. This Presentationdoesnot
constitute anoffer tosell, or a solicitationof an offer to buy, securities inthe United States. This Presentationmaynot be released toUSwire
services or distributed inthe United States.
This Presentationisofa general nature,does not take into considerationthe investment objectives, financialsituation or particular needs of
anyparticular investor and doesnot provide investment advice or financial product advice.You shouldobtainprofessional advice andcarry
out your own independent investigationsandassessment ofthe information inthis Presentation(including anyassumptions) before acting.
Informationin this Presentationwhichis attributedto a third-partysource hasnot beenchecked or verifiedby the Company.
Reliance on Presentation
Content presentedinthis presentationis providedas at the time of thispresentation(unlessotherwise stated). Reliance shouldnot be placed
on informationor opinions containedin this presentationand, subject only toany legal obligationto doso, CMG accepts no responsibilityto
update anypersonregardinganyinaccuracy, omissionor change ininformation inthis presentationor anyother informationmadeavailable to
a person, nor anyobligationto furnishthe person withanyfurther information. Tothe maximumextent permittedby law, none of CMG, its
directors, employees, agents,advisersor any other personaccepts anyliability,including (without limitation)anyliabilityarisingfromfault or
negligence onthe part of any of themor anyother person, for any loss arising fromthe use ofthe Presentationor its contents.
Mineral Resources The informationinthis Presentationrelating toMineralResources is extractedfrom the Company’s ASXannouncement
titled‘Significant Increase toMineral Resource Estimate’dated 10 May2024 which is available toview at www.asx.com.au. The Company
confirmsthat it is not aware of anynew information or data that materiallyaffectsthe information includedin the original market
announcement andthat allmaterialassumptions andtechnicalparameters underpinningthe estimatesinthe market announcement
continue toapplyandhave not materiallychanged. The Company confirms that the formand context in whichthe Competent Person’s
findings are presentedhave not beenmateriallymodifiedfrom the originalmarket announcement.
It isa requirement of the ASX Listing Rulesthat the reporting of Mineral Resources inAustralia complywith the JORCCode. Investors outside
Australia should note that while Mineral Resource Estimatesof the Companyin this Presentationcomplywiththe JORCCode,they maynot
complywith the relevant guidelinesinother countries.Informationcontained inthis Presentationdescribingmineraldeposits maynot be
comparable tosimilar informationmade public by companiessubject tothe reportinganddisclosure requirementsofother countries.You
should not assume that quantitiesreported as“resources”inthis Presentationwillbe convertedtoreserves under the JORC Code or any
other reporting regime or that the Companywill be able tolegallyandeconomicallyextract them.
Production Targets and Forecast Financial Information The information in this Presentation that relates to Production Targets and forecast
financialinformationderived fromProductionTargetsis extractedfromthe Company’s ASX announcement dated20 July2026 (“Technicaland
FinancialPre-Feasibility Study”) available to view at www.asx.com.au(PFS Announcement).The Company’s MineralResources include,and
the Company’s ProductionTarget is based on, 94%indicatedresourcesand6% inferred resources asreportedinthe PFS Announcement.
There isa low levelof geologicalconfidence associatedwith Inferred Mineral Resources andthere isnocertaintythat further explorationwork
willresult inthe determinationof IndicatedMineral Resourcesor that the ProductionTarget itself willbe realised. CMG confirmsthat all
material assumptionsunderpinning the ProductionTarget set out in the PFSAnnouncement continue toapplyandhave not materially
changed.
This Presentationcontains forecast financialinformation(including forecast financial informationderivedfromthe Company’s Production
Target). This financial informationisbasedon the materialassumptions set out inthe PFS Announcement,whichcontinue to applyandwhich
have not materially changed. The Companybelievesit has a reasonable basisfor making the forward-lookingstatements in this Presentation
(including with respect to forecast financialinformation).
FinancialDataand Non-IFRS Financial Information
All monetaryvaluesexpressedas"$" or "A$" inthis Presentationare inAustralian dollars, unless statedotherwise.Allmonetary values
expressedas "US$"inthisPresentation are in US dollars,unlessstated otherwise. The assumed exchange rate toconvert Australian dollars to
USdollars (as applicable)is0.67,unlessexpressly shownotherwise inthe footnote tothe slide or in the relevant appendix. The Company
supplementsitsfinancialinformationreporting determinedunder International FinancialReporting Standards (“IFRS”) withcertain non‐IFRS
financialmeasures constituting "non-IFRSfinancialinformation"under ASIC Regulatory Guide 230 "Disclosingnon-IFRSfinancial
information"publishedbyASIC,including measuressuchas cashoperatingcosts, All‐InSustaining Cost,EBITDA, NPV, IRR and project
payback. Investorsshouldbe aware that this Presentationcontains such“non-IFRSfinancialinformation”. The non-IFRSfinancial measures
do not have standardisedmeaningsprescribedbyAustralianAccountingStandardsand, therefore, maynot be comparable tosimilarlytitled
measures presentedbyother entities, nor should they be construedas analternative toother financial measuresdeterminedinaccordance
with AustralianAccountingStandards. Although the Companybelievesthat these measuresprovide additionalmeaningful informationto
assist management, investorsandanalysts in understanding the financial results andassessing the Company’s prospects,readers are
cautionednot toplace undue reliance onanynon-IFRSfinancialinformation(or non-IFRSfinancialmeasures).
ForwardLooking Statements
This Presentationcontains certainstatements which mayconstitute forward-lookingstatements. These forward-lookingstatements may
include, among other things, statements withrespect topre-feasibilityanddefinitive feasibilitystudies,the Company’sbusinessstrategy,
plans, development, objectives,performance,outlook, growth, cashflow,projections, targets andexpectations,Mineral Reserves and
Resources,results of explorationandrelated expenses. Generally, this forward-lookinginformationcanbe identifiedby the use of forward-
lookingterminologysuch as‘outlook’,‘anticipate’,‘project’,‘target’, ‘potential’,‘likely’,‘believe’,‘estimate’, ‘expect’,‘intend’,‘may’,‘would’,
‘could’,‘should’,‘scheduled’, ‘will’,‘plan’,‘forecast’, ‘evolve’andsimilar expressions.Suchstatementsare onlyexpectationsor beliefs andare
subject toinherent risks and uncertainties whichcould cause actualvalues,resultsor performance achievementsto differ materiallyfrom
those expressed or implied inthis Presentation. Norepresentation or warranty, express or implied, is made byCMGthat anyforward-looking
statement containedinthisPresentation will occur, be achievedor prove tobe correct. Youare cautioned against relying upon anyforward-
lookingstatement.
Authorisation
This Presentationhasbeen authorised for release bythe Boardof CriticalMinerals GroupLimited.
Investment thesis
CMG is building the upstream and midstream supply chain for vanadium flow batteries — from mine to electrolyte.
Anchor metric
Pre-Tax IRR: 26.6% | Pre-Tax NPV: A$821M | 7-Year Payback | 3 Mtpa Preferred Case
Mine
Upstream
V₂O₅
Pentoxide
Electrolyte
Midstream
The story is mine-to-electrolyte:
upstream resource scale plus
midstream electrolyte capability.
CMG's strategy captures value across the full vanadium supply chain, from mine extraction through to battery-grade electrolyte manufacture, positioning CMG
as a vertically integrated supplier to the rapidly growing Vanadium Flow Battery market.
The investment thesis
( 4 )
01 Advancing asset
PFS complete at ±25% accuracy. 26.6%
pre-tax IRR and A$821M pre-tax NPV
confirmed at 3 Mtpa. 713 Mt JORC
resource* ~31-year mine life.
02 Commercial demand
VFB manufacturers and data centre
operators are actively seeking Western
vanadium electrolyte supply. CMG has
specification requirements from 4 major
international VFB manufacturers.
03 Focused strategy
Securing VE offtake to support AI data
centre energy requirements. Capital and
execution focused by building VE plant
and using 3rd party V₂O₅ to generate early
cashflow ahead of CMG mine production
* 31 Mar2026 Quarterly report (30 April 2026), 2024.05.10 CMG - Mineral Resource Estimate Update - FINAL RELEASE
CMG is focusing on upstream and midstream supply to support energy storage demand from data centres
and the energy transition.
The focus is a clear, asset-backed supply chain proposition to generate early cash.
Strategy reset: why upstream and midstream
( 5 )
CMG focus
Upstream and midstream supply chain
• Early cash flow anticipating VE facility first product 2028*
• Advancing discussions with identified Offtake partners for VE
• Significant USA VFB demand driven by AI data centre growth
• Proprietary 713 Mt JORC resource base at Lindfield
• Focused on securing high margin battery grade vanadium
electrolyte product
• Leverages CMG's mineralogy and hydromet expertise
• Clearer role in supporting VFB growth
New focus
CMG scope
Upstream Midstream Out of scope
Mine Processing facility Electrolyte production Battery assembly Grid integration
Invinity/FlexBase **
(announced May 2026): world's
first GWh-scale VFB for an AI
data centre campus —
Laufenburg, Switzerland.
Initial 1.5 GWh (expandable to 2.1
GWh) requires ~14,800–20,800
tonnes of V₂O₅ for a single
project at a single campus.
To meet data centre demand
* Dependant on secured Offtake (Australia, USA, EU)
** Flex base 21 May 2026 – Invinity Energy Systems has emerged as the strategic for the worlds largest flow battery
storage facility in Laufenberg, Switzerland.
Market opportunity
( 7 )
AI data centres — an unexpected vanadium demand
catalyst *
The storage problem lithium-ion cannot solve
945 TWh
Global data centre
power demand by 2030
606 TWh
US data centre
demand by 2030
300 GWh
AI data centre battery
storage by 2030
The 10% scenario
If VFBs capture just 10% of the projected 300 GWh AI data centre storage market by 2030, the vanadium required — 240,000–297,000 tonnes of V₂O₅ —
would be 2.4 to 3× the entire current global annual vanadium supply, and 24–30× the vanadium currently available outside the steel industry. This is
before accounting for grid-scale renewable storage, China deployment, or existing industrial demand.
Invinity/FlexBase (announced May 2026): world's first GWh-scale VFB for an AI data centre campus — Laufenburg, Switzerland. Initial 1.5 GWh (expandable
to 2.1 GWh) requires ~14,800–20,800 tonnes of V₂O₅ for a single project at a single campus.
VFB levelised cost of storage (LCOS) is significantly lower than LIB for high-cycle applications due to unlimited cycle life and no electrolyte degradation.
The economic argument strengthens as AI workload intensity and cycle frequency increases.
* IEA – Energy and AI report April 2025, Goldman Sachs Research “Ai is posied to drive 160% increase in data centre power demand May 2024, IEA – Electricity 2024 Jan 2024
( 8 )
The duty cycle lithium cannot survive
AI training loads favour vanadium flow — and every VFB deployed is demand for CMG's product
Lithium-ion (LFP)
• Narrow SOC window — typically restricted to 10–90% state
of charge to preserve lifespan
• Degrades under jitter — high-frequency partial cycling
accelerates capacity fade and internal resistance
• Oversized and derated — surviving the duty cycle means
bigger footprint, higher capex, more thermal stress
• Flammability — operators and insurers see on-site lithium as
heightened risk beside GPU capital
Vanadium flow (VFB)
• Unlimited cycling — deep cycling hundreds of times a day
with no capacity loss over 30+ years
• Full-range usability — full power output across the entire
state-of-charge range
• Non-flammable — liquid-phase chemistry eliminates thermal
runaway risk in high-density facilities
• Built for the load — matches the seconds-to-minutes
variability of AI training iterations
What it means for CMG
The battery is the enabler; electrolyte is the product. Every GWh of data centre VFB capacity is direct demand for qualified vanadium
electrolyte , CMG's mine-to-electrolyte proposition, with leading VFB manufacturers already in CMG's pipeline discussions.
Source: VFB manufacturer industry analysis, June 2026. CMG electrolyte pipeline per CMG Investor Presentation, June 2026.
( 9 )
“Bring your own power” — the second demand pathway
Regulation is forcing the issue: Ireland now requires new data centres to hold on-site generation or storage equal to full
import capacity; four US mid-Atlantic states have proposed “bring your own generation” mandates.
The constraint: Developers are increasingly required to supply their own power to secure a grid connection or avoid curtailment. Co-located solar
and wind are clean and low-cost, but intermittent. Storage is what makes them firm.
One asset, two duty cycles
Shift — store daytime solar and variable wind, releasing firm power
to the load around the clock and avoiding curtailment.
Smooth — simultaneously absorb the high-frequency swings of AI
training loads.
Lithium is built for short-duration backup and roughly once-daily
cycling; this combined duty needs continuous high-throughput
cycling over decades — the VFB’s core strength.
What the developer gets
Firm power from on-site renewables, without curtailment
losses
Faster permitting — non-flammable chemistry removes fire risk
Improved power quality and support for grid stability
Critical backup through grid outages
What it means for CMG
Firming is the electrolyte-heavy application. A VFB’s energy capacity is set by its electrolyte volume, so 4–8+ hour renewable-firming systems
require far more electrolyte per MW than short-duration buffering, compounding demand for CMG’s product.
Source: VFB manufacturer industry analysis, June 2026. Duration suitability per CMG Investor Presentation, June 2026.
( 10 )
Compute uplift: the data centre case for vanadium flow
Storage converts a constrained grid connection into more revenue-generating compute
4:1 – 9:1
Peak-to-average power ratio
of AI training clusters
10% → 90%
Load swing within milliseconds
as GPUs cycle in lockstep
100s / day
Multi-megawatt power swings
during a training run
The mechanism
1
Grid connections must be sized to instantaneous peak demand, so most AI
campuses carry large unused headroom.
2
A battery between the connection and the GPU load discharges into
computation peaks and recharges in the lulls, flattening the profile.
3
The connection can then be sized to average load, cutting time-to-power,
connection cost and grid risk.
Worked example — UK AI campus
120 MW peak | 20 MW average load
With a VFB buffer, the full cluster runs on a 60 MW grid
connection
2× compute uplift
double the compute on the same connection, without joining
the interconnection queue.
Source: VFB manufacturer industry analysis, June 2026; Microsoft Azure AI training load data.
Market opportunity highlights
Structural vanadium
deficit incoming
Global supply is ~100,000 tpa
with 90% captive to steel. VFB
deployment alone could require
155,000t* of new vanadium annually
by 2030 — 1.5× total current global
supply. The deficit is building. The
price has not yet moved.
( 11 )
AI data centres —
an unexpected demand
catalyst**
If VFBs capture just 10% of the 300
GWh AI data centre storage market
by 2030, vanadium demand from
this single application alone would
be 2.4–3× the entire current global
annual supply.
US national security
backstop — Project Vault
February 2026: Trump launches $12B
strategic critical minerals reserve.
Vanadium is on the USGS Critical
Minerals List. CMG, from an allied
nation, is precisely what Project Vault
is designed to support.
* IEA – Energy and AI report April 2025
** VFB characteristics suit data centre needs due to safety (no thermal runaway), multi cycle ability, long duration storage, long asset life, and low LCOS (Flex base 21 May 2026 –
Invinity Energy Systems has emerged as the strategic for the worlds largest flow battery storage facility in Laufenberg, Switzerland.)
The vanadium flow battery moment
Long-duration storage is moving from policy need to procurement reality, with VFBs suited to 4–8+ hour applications.
US$2.2B
Global VFB market 2025
(projected >US$10B by 2033)
>100 ktpa
Vanadium demand required
by early 2030s (Guidehouse)
TRL 9/9
CSIRO VFB maturity rating —
most commercially mature LDES
47%
Australia's share of global
vanadium resources
( 12 )
Names customer pipeline
CMG has battery manufacturer specification requirements and
is discussing offtake/supply arrangements with:
Australia's only two VE producers total ~3 ML/pa. CMG's Phase 1 Parkes facility targets 24 ML/pa — an 8× step-change — with a clear first-mover window.
Why VFBs are winning
25+ year electrolyte life — reusable and recyclable, lowest whole-of-life cost
100% depth of discharge without capacity loss — full utilisation guaranteed
Power and energy independently scalable for any storage duration
Data centre ready: 4–8+ hour backup where safety matters more than footprint
Data centre operators (multiple)
VFB battery manufacturer (#1 name withheld)
VFB battery manufacturer (#2 name withheld)
VFB battery manufacturer (#3 name withheld)
Guidehouseinsights.com
CMG studying Phase 1 - 24 ML/pa VE plant in Parkes (Phase 2 is growth to 72 ML/pa dependant on demand)
CMG assessing site selection in USA and UK to locate the modular 24 ML/ pa VE plant
Vanadium electrolyte: the product that matters
Electrolyte is the supply-critical commercial product inside a vanadium flow battery.
Tank A
charged
electrolyte
CMG produced V₂O₅ US$5.91-8.7/lb V₂O₅ and anticipated VE offtake price of A$6.50/litre — a compelling unit margin.1
Electrolyte moves between storage tanks and the cell stack to charge and discharge
energy without degradation over 25+ years of operation.
Priced per litre, carrying a conversion premium
above raw V₂O₅. Anticipating Vanadium Electrolyte
sales revenue approx. A$6.50/litre.
Western supply is negligible. China controls
65–70% of global vanadium output. CMG
is building a sovereign Western alternative.
Electrolyte retains value over its 25+ year life,
enabling reuse, leasing and recycling
revenue streams.
CMG evaluating electrolyte ownership retention
with service fees — recurring revenue attractive
to data centre opex buyers.
Commercial
product
Supply gap
Residual value
Leasing model
Tank B
discharged
electrolyte
Cell stack
(conversion)
( 13 )
1Refer ASX announcement titled “Technical and Pre-Feasibility Study” released on 20 July 2026
Asset and project quality
The asset: resource and geology
Lindfield provides the scale to support CMG's upstream supply ambition and midstream product strategy.
713 Mt
JORC Resource
(Indicated & Inferred)
0.32%
Average V₂O₅ grade
(0.50% in mine-schedule ore)
~25 years
Mine life at 3 Mtpa
(45+ yrs at 1 Mtpa)
2.8:1
Strip ratio
(3 Mtpa case average)
130 ppm
Molybdenum (Mo)
by-product revenue stream
Geological advantages
• Toolebuc Formation — laterally continuous Cretaceous marine sequence;
sub-horizontal, shallow (0–30 m depth)
• Free-digging ore, no drilling or blasting; contractor fleet eliminates CMG equipment
capex
• ~80% of waste placed in-pit , minimal external footprint and rehabilitation liability
• Flinders Highway and Townsville–Mt Isa rail on southern boundary;
1 km rail siding directly opposite mine access
• CMG holds 3 additional tenements in close proximity to Lindfield.
Mine method
Processing hub
By-products
Water & power
( 15 )
Opencut, freedig. Contractor-operated
mobile fleet, no CMG capital exposure to
mining equipment.
Mine and processing plant at Lindfield. V₂O₅
transported 1,864 km by AB Triple road train to
Parkes Vanadium Electrolyte (VE) plant (central to
Australia’s VFB demand).
Molybdenum (Mo) co product.
HPA upside in MRE, 4N produced in bench scale
testing, not in base case financials.
GAB artesian bores 250–500 m depth; hybrid
solar/wind/VFB/diesel under PPA, no CMG power
capex.
Integrated asset: mine, processing, electrolyte
Vertical integration is the core advantage: ore to V₂O₅ to electrolyte with direct control over quality and margin capture.
Mine Lindfield
Julia Creek, QLD
Beneficiation & Leaching
On-site processing
V2O5 production
≥99.5% purity
VE Manufacturing
Parkes SAP, NSW
Customer Delivery
VFB OEMs & data centres
No third-party margins
Vertical integration eliminates processor
mark-up, direct margin capture from mine
gate to customer
Product quality control
End-to-end quality management
enables Tier 1 VFB customer specifications
to be consistently met
Supply security
Domestic feedstock eliminates China
supply dependency, valued premium
for Western procurement teams
Staged capital path
VE facility funded and operational before
mine construction, de-risks the full capital
programme
23-35% cost advantage
US$5.91-8.7/lb V₂O₅ produced (25 yr
range) vs. quoted import supply price
US$7.75–8.50(2 yr range)/lb , validated at
PFS level
Parkes SAP speed
30-day development consent under NSW
Special Activation Precinct, first product
2028**
( 16 )
* Inbound demand enquiries occurring in USA would place this facility in Texas / Sth Carolina as a priority to NSW
** Offtake dependant
PFS milestone: what it means for investors
A Pre-Feasibility Study is the first independently validated confirmation that a project is technically and financially viable.
Exploration Scoping study PFS July 2026 Feasibility study Permitting & FID Construction Production
Resource classification
713 Mt JORC (Indicated & Inferred)
underpins 3 Mtpa production schedule
and ~31-year mine life
Process design
Hydrometallurgical flowsheet proven at
lab scale; 68–69% V recovery confirmed
for TLBB priority mineralized material
Capital cost accuracy
±25% PFS accuracy, A$981M total
integrated capital for 3 Mtpa including
onsite acid plant and vanadium
electrolyte plant in Parkes NSW
Financial returns
26.6% pre-tax IRR and A$821M pre-tax NPV
at 9% discount rate , materially above cost
of capital
Commercial logic
US$5.91-8.7/lb V₂O₅ produced (25 yr
range) vs. quoted import supply price
US$7.75–8.50(2 yr range)/lb —
23–35% advantage confirmed
Development pathway
VE facility cash from 2028,
24 months ahead of mine production,
staged capital de-risking
What the PFS confirms for investors:
( 17 )
* Dependant on input V₂O₅ cost.
Commercial strategy
Commercial strategy: electrolyte sales
( 19 )
The revenue model centres on qualified vanadium electrolyte supply for VFB manufacturers, integrators
and large energy users.
01 VFB manufacturers & integrators
Direct supply agreements for qualified
electrolyte, supported by testing
provenance and reliability of supply.
Pipeline in discussion include: 3 major
international VFB manufacturers. Pricing to
be negotiated (eg via V₂O₅ benchmark
linkage or fixed-rate term)
02 Data centres & energy partners
Long-duration backup and resilience
where safety, operating life and
whole-of-life value matter. AI data centre
infrastructure growth is pulling VFBs into
near-term data centre capex plans
globally. Pipeline in discussion include:
Data centre developer*
03 Industrial & grid customers
Indirect channel via VFB project developers
delivering LDES to mining, industrial and grid
applications. AEMO's ISP requires 8–12+ hour
LDES to firm overnight renewables and
replace retiring coal.
Pricing can be structured as:
A$6.50/litre
PFS base-case
anticipated VE revenue
V2O5
benchmark link
Captures upside
in price recovery
Fixed-price
supply
Bankable for
project finance
Electrolyte
leasing
Recurring revenue;
reduces customer capex
* Name withheld for confidentiality.
Why CMG wins: competitive positioning
CMG's edge is an integrated Queensland asset base with the earliest path to market among Western VE producers.
Criteria CMG (ASX: CMG) Imported Supply Other Western Projects
Resource base 713 Mt JORC; own-mine feedstock from ~2030 Dependent on offshore feedstock
Project-specific; many still
exploration
Integration Mine + Processing + VE manufacturing Separated; multiple margin layers
No at scale production >2 mil
litres pa.
Jurisdiction Queensland + NSW ,investment-grade China — strategic/geopolitical risk US/EU/AUS — mixed timelines
Speed to market First VE product 2028 (30-day SAP consent) Available but sovereign risk Still feasibility/permitting
Production cost US$5.91-8.7 /lb , 23–35% below import price
3rd party supplier: US$7.75–8.50/lb
CIF Newcastle
No at scale production >2 mil
litres pa.
Supply chain provenance and domestic content credentials are increasingly decisive criteria for Western VFB customers and infrastructure lenders.
( 20 )
Financials and PFS
PFS financial highlights
Headline financial metrics — 3 Mtpa preferred case. Constant AUD March 2026 | 9% discount rate | ±25% PFS accuracy.
26.6%
Pre-tax IRR
A$821M
Pre-tax NPV
18%
Post-tax IRR
A$458M
Post-tax NPV
7 years
Payback period
Mine + processing
Preferred option : 3 Mtpa ROM
mine producing ~10-11,000t
V₂O₅ pa and ~ 300t MoO₃.
Margin indicator
US$5.91-8.7/lb V₂O₅
produced (25 yr range) vs.
quoted import supply price
US$7.75–8.50(2 yr range)/lb ,
validated at PFS level
VE option value
Revenue from internal VE
manufacture. Production
cost using Lindfield
feedstock: ~US$2.91/litre
vs A$6.50/litre sales.
Capital structure
Phase 1 VE facility: A$47.5M.(24
mil litres) Phase 2 integrated
mine& 72 mil litre VE: ~A$981M.
Power via PPA
and mining fleet
contractor-supplied.
( 22 )
Capital and operating cost — 3 Mtpa case
Capital-efficient structure via contractor model and PPA . OPEX dominated by reagents — the primary optimisation target.
218
40
27
5
0 50 100 150 200 250
Reagents (incl. H2SO4)
Maintenance & Sustaining
Power
Water & Consumables
Sulphuric acid = ~50% of reagent spend (driven by ore's high calcium content). Onsite
acid plant (3 and 4 Mtpa cases) materially reduces unit cost, the highest-priority
Definitive Feasibility Study optimisation target.
Component A$ (Indicative)
Processing plant (hydromet circuit) A$665M
Non-process infrastructure ~A$57M
Onsite sulphuric acid plant ~A$192–240M
VE facility — 72 ML/pa (Parkes) ~A$172M
TOTAL integrated project ~A$981M
Capital cost breakdown
VE Facility Phase 1 (24 ML/pa): A$47.5M using third-party* V₂O₅.
Power via PPA ~A$0.15/kWh; mining fleet fully contractor-supplied.
OPEX structure — 3 Mtpa (A$M/year)
V₂O₅ delivered production cost: US$5.91 – 8.7 /lb vs. 3rd party* import price US$7.75–8.50/lb = 23–35% structural cost advantage
( 23 )
* Third Party name withheld for confidentiality.
Sensitivity and scenario analysis — 3 Mtpa
Project is robust across realistic ranges. Primary risk is commercial and metallurgical, not construction.
NPV sensitivity to ±20% input variation (Base case: A$821M pre-tax NPV)
0 200 400 600 800 1000 1200 1400 1600 1800
VE Price
Ore Grade
Met Recovery
Reagent Costs
Capital Cost
Discount Rate
Upside (+20%) Downside (−20%)
Key risk/upside ranking:
Critical
VE Price, Ore Grade,
Metallurgical Recovery
Significant
Total Reagent Costs
Moderate
Capital Cost
Low
Discount rate
( 24 )
A 20% metallurgical recovery improvement alone = ~A$450M in pre-tax NPV, the single highest value Definitive Feasibility Study workstream.
Key risks
Risk area Description Key mitigant Rating
Product quality Failure to consistently achieve ≥99.5% V₂O₅ purity
Pilot plant programme; closed-loop
impurity study in DFS
HIGH
Reagent costs
High acid consumption drives OPEX above incentive
levels at current V₂O₅ spot prices
Beneficiation optimisation; on-site acid
plant (3–4 Mtpa)
HIGH
Funding
Inability to raise sufficient capital from DFS to FID and
construction
Early government funding engagement;
VE facility provides lower-capital entry
point
HIGH
Offtake & revenue
Delays in securing binding offtake or unfavourable
pricing affecting financing bankability
Advance product qualification; early VFB
developer engagement; third party
(quoted and confirmed) feedstock from
2027
HIGH
Permitting
EIS delays or conditions requiring design changes,
postponing FID
Early regulator engagement;
Coordinated Project application;
conservative schedule contingency
HIGH
Exchange rate AUD/USD volatility affects revenue (USD) vs costs (AUD)
FX sensitivity modelled; natural AUD
hedge from labour/infrastructure;
offtake floor pricing
HIGH
Resources &
reserves
Tenure or regulatory constraints on mineralised
material could reduce the resource base by up to ~20%,
affecting the production schedule
Engagement with the Queensland
Department of Natural Resources, Mines,
Manufacturing and Regional and Rural
Development (DNRMMRRD)
HIGH
Risks are as disclosed in the ASX announcement released 20 July 2026 and are not exhaustive. This slide should be read with the Important Notice & Disclaimer. ( 25 )
Path forward
Development timeline and mile