Page 1
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
CONTENTS
Corporate Directory
ii
Chairman’s Letter
1
Managing Director’s Letter
2
Directors’ Report
3
Auditor's Independence Declaration
26
Consolidated Statement of Profit or Loss and Other Comprehensive Income
27
Consolidated Statement of Financial Position
28
Consolidated Statement of Changes in Equity
29
Consolidated Statement of Cash Flows
30
Notes to the Financial Statements
31
Directors' Declaration
47
Independent Auditor's Report
48
Additional Information (ASX Listing Rules)
52
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
CORPORATE DIRECTORY
Directors
Alan Broome (Non-Executive Chair)
William Scott Winter (Managing Director)
Art Malone (Non-Executive Director)
Steven Kovac (Non-Executive Director)
Stuart McClure (Non-Executive Director)
Company secretary
Adam Gallagher
Registered office
Critical Minerals Group Limited
Level 4, Gold Tower
10 Eagle Street, Brisbane QLD 4000
Principal place of business
Critical Minerals Group Limited
Level 4, Gold Tower
10 Eagle Street, Brisbane QLD 4000
Share registry
Automic Group Pty Ltd
Level 5, 126 Philip St
Sydney NSW 2000
Auditor
PKF Brisbane Audit
Level 6, 10 Eagle Street
Brisbane QLD 4000
Website
https://www.criticalmineralsgroup.com.au/
ASX ticker
CMG
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
CHAIRMAN'S LETTER
Dear Shareholders,
Welcome to the Annual Report for the year ended 30 June 2023 for Critical Minerals Group Limited
(Company).
The 2023 financial year has been a period of significant change and progress for the Company.
Following the Company’s successful listing on the ASX, where $5,000,000 was raised to advance the
exploration across our projects, we have achieved several project milestones.
The Company is building its position in the vanadium market, holding a tenement in north-west
Queensland near the town of Julia Creek, which is its flagship project known as the Lindfield Project.
This year also saw the granting of the tenements for the Figtree Creek Project and Lorena Surrounds
Project, both exciting greenfield copper-gold projects that support the Company’s focus on critical
mineral opportunities. We also applied for three tenements within close proximity to the Lindfield
Project, forming its Whinmoor Project (which has been granted), Lara Downs Project (still subject to
application) and Lindfield North Project (still subject to application).
During the financial year, the Company completed the maiden drilling program at our Lindfield Project,
resulting in a resource upgrade, which further increased the viability of the project. The Company
released results on 16 May 2023, which reported a significant upgrade in the Mineral Resources
Estimate at the Lindfield Project. The new Mineral Resource Estimate of 363mt @ 0.43% V2O5 and
4.8% Al2O3 includes an Indicated Resource of 254mt @ 0.44% V2O5, representing an increase in both
grade (up 10%) and in tonnage (up 73%).
In the year to come, we will continue to advance the flagship Lindfield Project through the completion
of the scoping study, conduct of further metallurgy test work, pilot plant test work and further feasibility
studies. We will also look to progress exploration of our other projects to further strengthen the
Company’s opportunities in critical minerals.
As we look to the 2024 financial year, I would also like to recognise the progress made by Scott
Drelincourt and welcome our new Managing Director and Chief Executive Officer, Scott Winter, to the
Company. Mr Winter is an experienced mining engineer with almost 30 years working across mining
exploration, development, engineering, financing and operations. Mr Winter’s experience gives the
board confidence that we can continue the development and growth of the Company’s projects.
I would like to thank shareholders for their support to date and look forward with excitement to continuing
to advance the Company’s projects during the year.
Yours sincerely,
Alan Broome AM
Chair
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
MANAGING DIRECTORS LETTER
Dear Shareholders,
Welcome to the Annual Report for the year ended 30 June 2023 for Critical Minerals Group Limited
(Company).
It’s a pleasure to be able to join and lead a company that has had such a significant and successful year
in FY2023. With a successful listing on the ASX in September 2022, raising $5,000,000, the Company
is in good standing through applying the funds to consolidating and upgrading its JORC resource and
commencing the scoping study into the flagship Lindfield Project.
The resource upgrade announced on 16 May 2023 validated an increase in the Mineral Resource
Estimate to 363 mt @ 0.43% V2O5 and 4.8% Al2O3 with an indicated resource of 254 mt
@0.44%V2O5. This places the Company in a strong position to evaluate optimal solutions in the scoping
study and metallurgical testing of the vanadium and alumina.
The scoping study works commenced late in the 2023 financial year and are expected to complete early
in the new financial year. Similarly, metallurgical testing commenced with encouraging results in each
of the seams and is expected to be a major focus over the coming months.
The year ahead is expected to be an exciting one with a significant focus on the flagship Lindfield Project
with the continuation of metallurgical testing on bench and pilot scale, completion of the scoping study,
commencement of environmental studies and further project feasibility studies.
I would like to thank the shareholders for a warm welcome to the Company and their support throughout
the year as we look ahead at what is an exciting time for Critical Minerals Group.
Yours sincerely,
Scott Winter
Managing Director & Chief Executive Officer
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
Your directors present their report on Critical Minerals Group Limited ( the Company) and its
controlled entities (“the Group”), for the financial year ended 30 June 2023 (FY23).
We acknowledge the Turrbal and Jagera people, who speak Yuggera, of the Meanjin land on which we
work and pay our respects to Indigenous Elders past, present and emerging.
DIRECTORS AND COMPANY SECRETARY
The names of the directors in office at any time during, or since the end of, FY23 are:
Alan Broome
William Scott Winter
appointed: 10 July 2023
Scott Drelincourt
Resigned 10 July 2023
Art Malone
Steven Kovac
appointed: 24 November 2022
Stuart McClure
appointed: 7 December 2022
Directors continue or were in office from the start of FY23 to the date of this report unless otherwise
stated.
The Company Secretary for FY23 was Toni Myers, appointed on 20 August 2021. Subsequent to the
end of FY23, Toni Myers resigned on 31 August 2023. Adam Gallagher was appointed Company
Secretary with effect from 31 August 2023.
REGISTERED OFFICE
The Company’s registered office and principal place of business is:
Level 4, Gold Tower
10 Eagle Street Brisbane QLD 4000
The Company’s phone number and email address is:
Phone: (07) 5555 5055
Email: info@criticalmineralsgroup.com.au
REVIEW OF OPERATIONS AND PRINCIPAL ACTIVITIES
During FY23, the Company commenced operations in mining exploration. This Directors’ Report
contains a review of the Group’s operations, including information on exploration activity and results,
financial position, strategies and projects of the Group for FY23.
During FY23, the Company successfully completed an initial public offering (“IPO”) in September 2022
(raising $5,000,000) and commenced quotation on the ASX on 27 September 2022. As part of the
IPO, the Company issued a further 6,250,000 options at an exercise price of $0.25 which are
exercisable from listing.
A new wholly owned subsidiary of the Company, CMG 3 Pty Ltd ACN 662 757 780, was incorporated
on 28 September 2022.
1
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
The Group’s financial position, financial performance and use of funds information for FY23 is provided
in the financial statements that follows this Directors’ Report.
The Group incurred a loss of $1,436,264 for FY23, resulting mainly from administration expenses,
professional and consulting fees and employee costs.
The Company, as an exploration entity, has no operating revenue or earnings. The performance of
the Group, in the directors’ opinion, is predominantly based on the success of the exploration activities
and the acquisition of mining interests by the Group.
The Company is pleased to provide an update on exploration activities completed during FY23.
The Company is an exploration company focussed on developing critical minerals projects. The Group
was formed to identify, secure, acquire and develop critical mineral resource tenements in proven
regions in Australia.
The Group is building its position in the vanadium market, holding a tenement in north-west
Queensland near the town of Julia Creek, which is its flagship project known as the Lindfield Project.
In addition, the Group holds a tenement for the Whinmoor Project and has applied for tenements for
the Lara Downs Project and Lindfield North Project all within close proximity to the Lindfield Project.
The Group further holds tenements for the Figtree Creek Project and Lorena Surrounds Project,
both exciting greenfield copper-gold projects near the Queensland town of Cloncurry that support the
Group’s focus on critical mineral opportunities.
Project
Name
Tenement
Status
Date
Granted
Expires
Area
Location
Target
minerals
Interest
Lindfield
Project
EPM 27872
Granted
07/12/21
06/12/26
92 subblocks
30km
Northeast of
Julia Creek
Vanadium
100%
Figtree
Creek
Project
EPM 27998
Granted
27/10/22
26/10/27
22 subblocks
10km SouthSoutheast of
Cloncurry
Copper
100%
Lorena
Surrounds
Project
EPM 27999
Granted
27/10/22
26/10/27
16 subblocks
15km East
of Cloncurry
Copper
100%
Whinmoor
Project
EPM 28631
Granted
23/01/23
22/01/28
100 subblocks
60km North
of
Julia
Creek
Vanadium
100%
Lara Downs
Project
EPM 28635
(application)
Application
-
-
118 subblocks
60km
Northwest of
Julia Creek
Vanadium
100%
Lindfield
North
Project
EPM 28636
(application)
Application
-
-
36 subblocks
65km North
of
Julia
Creek
Vanadium
100%
2
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
Group Projects
Image 1: Map of the Group’s projects.
Source: Queensland Government, GeoResGlobe, Available at: https://georesglobe.information.qld.gov.au/
Lindfield Project (EPM 27872)
The Lindfield Project comprises Queensland exploration permit for mining (EPM) 27872 and consists
of 92 sub-blocks covering 295km². The Lindfield Project is located approximately 30km northeast of
the township of Julia Creek. The project area lies close to main infrastructure facilities and is
intersected by the Flinders Highway and the Great Northern Railway Line at the southern end of the
tenement.
The Lindfield Project is considered highly prospective for Vanadium and High Purity Alumina (HPA).
The Lindfield Project area is characterised by the presence of the Toolebuc Formation, Allaru
Mudstone and quaternary sediments.
A work programme had been established for the drilling and development of the Lindfield Project (see
the Company’s prospectus dated 25 May 2022 (Prospectus) for further details).
On 12 October 2022, the Company announced the commencement of its maiden drilling programme
at the Lindfield Project. The drilling program aimed to increase geological confidence of the deposit,
with the intention of upgrading the resource.
On the 22 November 2022, the Company announced that it had completed the drilling programme at
the Lindfield Project, including 23 aircore holes, 1 open hole and 3 water monitoring holes.
3
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
On 22 February 2023 and 13 March 2023, the Company announced the assay results received for the
Lindfield Project, with all holes having intersected the mineralised zone and with results exceeding
expectations. Standout higher grade V2O5 assays include hole LIND011 15.89m – 16.22m @ 0.70%
V2O5, LIND016 6.50m – 6.90m @ 0.62% V2O5 and 6.90m - 7.05m @ 0.65% V2O5. The final assay
results indicated a potential for a dual commodity deposit at the Lindfield Project, with promising results
for Alumina (potential HPA feedstock) results as well as Vanadium – including LIND019 1.0 m thick,
grading at 18.9% Al2O3 from 1.8 m depth.
Image 2: Drill hole program completed at the Lindfield Project as reported in the Company’s ASX announcement dated
13 March 2023.
4
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
Image 3: Cross section of the Lindfield Project as reported in the Company’s ASX announcement dated 13 March 2023.
The Company released results on 16 May 2023, which reported a significant upgrade in the Mineral
Resources Estimate at the Lindfield Project. The Lindfield Project Mineral Resources Estimate was
upgraded by John T. Boyd Mining and Geological Consultants of Brisbane. The new Mineral
Resources Estimate of 363mt @ 0.43% V2O5 and 4.8% Al2O3 includes an Indicated Resource of
254mt @ 0.44% V2O5 representing an increase in both grade (up 10%) and in tonnage (up 73%).
Table 1. New Lindfield Project Vanadium and HPA Mineral Resource Summary announced 16 May 2023
Resource Category
Indicated
Inferred
Total
Domain
Mass (Mt) V₂O₅ wt% Al₂O₃
Weathered
104
0.48
4.4
Fresh
150
0.41
5.1
Weathered
25
0.49
5.4
Fresh
84
0.39
4.8
363
0.43
4.8
Table 2. New Lindfield Project In Situ Mineral Resources Estimate Categories announced 16 May 2023
Horizon
TLBA
In Situ Mineral Resource (Mt at V2O5 wt%)
Indicated
Inferred
Total
-
TLBB
167 at 0.49%
72 at 0.45%
238 at 0.48%
TLBD
87 at 0.34%
37 at 0.35%
125 at 0.34%
TLBE
-
-
-
Total
254 at 0.44%
109 at 0.42%
363 at 0.43%
5
-
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
Table 3. In Situ Mineral Resource – Overburden Depth announced 16 May 2023
In Situ Mineral Resource (Mt at V2O5 wt%)
Overburden Depth
Indicated
Inferred
Total
0 m - 10 m
114 at 0.46%
24 at 0.47%
138 at 0.46%
10 m - 20 m
106 at 0.42%
27 at 0.41%
133 at 0.42%
20 m - 30 m
34 at 0.41%
57 at 0.40%
92 at 0.40%
30 m - 40 m
-
-
-
Total
254 at 0.44%
109 at 0.42%
363 at 0.43%
Following the Mineral Resources Estimate upgrade, the Company announced the commencement of
the scoping study on 31 May 2023, which is anticipated to be completed by the end of Q3 of the 2023
calendar year. Metallurgical test work on oxidised core is ongoing, supporting the flowsheet
development for vanadium extraction and the potential for HPA production from the mineralised zone,
with the continuation of both metallurgical programs results feeding into the scoping study.
The Group will continue to advance the Lindfield Project through the completion of the scoping study,
conduct of further metallurgy test work and pilot plant test work.
Figtree Creek Project (EPM 27998)
During FY23, EPM 27998 was granted to the Group which forms the Figtree Creek Project. The Figtree
Creek Project consists of 22 sub-blocks covering 70km². The Figtree Creek Project is located
approximately 10 km southeast of the township of Cloncurry and is 5km from the main infrastructure
corridor of the Flinders Highway and the Great Northern Railway line.
The Figtree Creek Project is considered prospective for iron oxide copper and gold mineralisation
based on historical surface sampling, local structural geology with similar rock types and structures
present in the Figtree Creek Project area to that of the Great Australian Mine style of copper-gold
mineralisation (which is just 3km north of the project) and electromagnetic anomalies identified.
The project area has several rock chip samples, soil samples and stream sediment samples showing
anomalous copper and gold assays.
The Company has completed sufficient work to establish a work programme to systematically explore
the tenement and identify potential mineralisation and drill targets (see the Prospectus for further
details).
As the focus of the Company has been on the Lindfield Project during the 2023 financial year, no
substantive exploration activities and no field work has been undertaken at the Figtree Creek Project.
The Group will continue a desktop review of the tenement to incorporate historical data to design the
exploration program for MMI field sampling and mapping.
6
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
Lorena Surrounds Project (EPM 27999)
During FY23, EPM 27999 was granted to the Group which forms the Lorena Surrounds Project. The
Lorena Surrounds Project consists of 16 sub-blocks covering 51km². The Lorena Surrounds Project
is located 15km east of Cloncurry and intersects main infrastructure of the Flinders Highway and Great
Northern Rail Line at the southern end of the tenement.
The Lorena Surrounds Project is considered prospective for iron oxide copper and gold mineralisation
based on historical drilling, local structural geology and electromagnetic anomalies identified.
It is anticipated that the Company will focus on areas of the tenement where magnetic anomalies are
similar to geochemical and geophysical anomalies present in adjacent historical and operating mines.
The Company has completed sufficient work to establish a work programme to systematically explore
the tenement and identify potential mineralisation and drill targets (see the Prospectus for further
details).
As the focus of the Company has been on the Lindfield Project, no substantive exploration activities
and no field work have been undertaken at the Lorena Surrounds Project.
The Group will continue a desktop review of the tenement to incorporate historical data to design the
exploration program for MMI field sampling and mapping.
Whinmoor Project (EPM 28631)
During FY23, the Group applied for and was granted EPM 28631, which forms the Whinmoor Project.
The Whinmoor Project consists of 100 sub-blocks covering 320 km². The Whinmoor Project is located
60km north of Julia Creek.
The Whinmoor Project intends to extend exploration by previous explorers and known extensions to
Vanadium mineralisation in the Company’s Lindfield Project.
As the focus of the Company has been on the Lindfield Project, no substantive exploration activities
and no field work have been undertaken at the Whinmoor Project.
The Group will continue a desktop review of all historical drilling and geological data within the
tenement.
Lara Downs Project (EPM 28635)
During FY23, the Group applied for EPM 28635 in relation to the Lara Downs Project. As at the end
of FY23, this application was still in progress and had not yet been granted.
The Lara Downs Project consists of 118 sub-blocks covering 378 km². The Lara Downs Project is
located 60km northwest of Julia Creek.
The Lara Downs Project intends to extend exploration by previous explorers and known extensions to
Vanadium mineralisation in the Company’s Lindfield Project.
As the Lara Downs Project tenement is only at the application stage, the Company has not yet
performed significant and detailed geological analysis, interpretation and exploration targeting.
No substantive exploration activities were undertaken, and no field work has been undertaken as the
Lara Downs Project is still in the application phase.
The Group will continue to progress the tenement application.
Lindfield North Project (EPM 28636)
During FY23, the Group applied for EPM 28636 in relation to the Lindfield North Project. As at the end
of FY23, this application was still in progress and not yet granted.
The Lindfield North Project consists of 36 sub-blocks covering 115 km². The Lindfield North Project is
located 65km north of Julia Creek.
7
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
The Lindfield North Project intends to extend exploration by previous explorers and known extensions
to Vanadium mineralisation in the Company’s Lindfield Project.
As the Lindfield North Project tenement is only at the application stage, the Company has not yet
performed significant and detailed geological analysis, interpretation and exploration targeting.
No substantive exploration activities were undertaken, and no field work has been undertaken as the
Lindfield North Project is still in the application phase.
The Group will continue to progress the tenement application.
Competent Person Statements
The information in this report that relates to the exploration results, exploration targets and mineral
resources was first reported by the Company in the Company’s Prospectus dated 25 May 2022 and
ASX announcements dated 22 February 2023, 13 March 2023, 16 May 2023. The Company confirms
that it is not aware of any new information or data that materially affects the exploration results,
exploration targets and mineral resources and that all material assumptions and technical parameters
underpinning these continue to apply and have not materially changed.
8
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
ENVIRONMENT, SOCIAL AND GOVERNANCE
Critical Minerals Group (CMG) is committed to purposefully including Environmental, Social, and
Governance (ESG) in our operations, positioning and ongoing strategy. To demonstrate our alignment
with ESG, the following report has been prepared to define how we plan to integrate ESG, involve our
stakeholders during the process, and communicate and report our progress to both internal and
external stakeholders.
During FY23 CMG produced a 3-year strategic plan which presents a consistent theme of ESG
considerations with three primary components:
• Efficient manufacturing: employ operational techniques, partnerships and intentional product
process ownership methods to achieve sector leading efficiency and reliability in production.
• Sustainable delivery: Embedding ESG into all components of delivery, from committing to
transitioning to net-zero by 2050, aligning and reporting to a designated ESG framework and
facilitating the creation of efficient, industry leading low degradation and lowest life-cycle
environmental footprint batteries.
• Product leader: Drive robust profits by leveraging the growing global demand for critical
minerals required to facilitate the decarbonisation with the efficient production of a high grade,
globally scarce mineral asset located in a rich zone, backed by defined and growing
governmental promoted support.
We have embedded ESG into our journey to date through the following actions:
• Appointing a CEO and CTO, Scott Winter and Nicola Semler respectively, who both have
extensive experience in building diversity and inclusion internally and establishing local
community and traditional owners support through positive cultural engagements.
• Transitioning to net zero by 2050.
• Establishing an ESG Policy focused on four principles: Ethics and Accountability, Mineral
traceability, Community and People, and Environmental management.
Our corporate and operational strategy has been further strengthened by conducting a Materiality
Assessment involving both our internal and external stakeholders. This assessment has been used
as a foundational engagement to establish which risks across ESG factors are deemed material for
CMG and will form the basis for establishing which ESG reporting framework CMG will align to and
consequently which metrics will be recorded and reported against (see Materiality Topics).
Our Material topics for FY23 (3-year strategy aligned)
FY23 saw the initial Materiality assessment conducted with the assistance of a leading ESG advisory
and climate services consultant group. Through engaging with key internal and external stakeholders
the materiality assessment defined the ‘topics CMG needs to prioritise to support its goals and manage
its most important/critical risks and opportunities’, and as a result, the following were identified:
-
GHG Emissions & Energy Efficiency - Environmental
Environmental Management (Biodiversity and Water) - Environmental
Health, Safety and Wellbeing - Social
Local communities - Social
Ethics, Integrity and Transparency - Governance
Risk Management - Governance
CMG reserves the right to assess when to conduct successive materiality assessments with its
stakeholders dependent upon when significant changes in the business or operating landscape occur
such as key milestones in the future, revised and/or new strategy adoption or other significant events
e.g., merger/acquisition, critical supplier/competitor/market development etc.
9
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
CMG is already embracing the principles and commitment to be an ESG leader.
Environmental
GHG Emissions & Energy Efficiency
CMG strives for energy efficiency and use of renewable energy in operations, both contributing to
reducing emissions associated with operations and production.
Development of a battery storage site will relieve reliance upon unsustainable fuel sources and allow
modulation of energy use, leading to decreasing costs of energy and increased renewable sources
utilised.
We have included in our strategy developments which will both increase energy efficiency, reduce the
need for fossil fuel usage and reduce the emissions associated with both our site operations and
potentially those from the local community. These include establishing a renewable energy source to
assist on-site power generation.
Additionally, our core business is empowering the global community to lower their emissions and assist
in their decarbonisation journey by facilitating the ability for energy providers to stabilise energy
demands with efficient energy storage, therefore lessening the dependency on unsustainable fuel
resources.
Vanadium extraction and refinement will contribute to efficient, low degradation and lowest life-cycle
environmental impact battery production and usage, increasing the capacity to store energy generated
from renewable sources and therefore reducing emissions.
Our commitment to achieving net Zero by 2050 firmly demonstrates our values alignment in the
decarbonisation of our own operations, whilst assisting others in achieving their commitments by
developing and producing the critical mineral supplies needed for efficient battery production. By
producing high purity Vanadium in a reliable and efficient manner, we are laying down a marker which
fosters confidence in investing in critical mineral extraction, its supply chain and the positive difference a
low environmental footprint product can produce.
Environmental Management (Biodiversity and Water)
The nature of mineral extraction impacts the biosphere of local flora and fauna communities, in line with
rehabilitation commitments and required approvals, CMG responsibly operates in an efficient manner
which minimises our impact on nature.
We operate on lands where significant and important natural resources exists for the local community
and traditional owners. Our ethical and respectful approach ensures that a key principle in our ESG
policy has centred on optimising any resources we use and continually employing site rehabilitation to a
high standard, in accordance with our environmental management direction.
Efficient use of natural resources, with particular focus on water management, will ensure reduced impact
on the surrounding environment.
In line with our aim to be operationally efficient we intend to obtain and adhere strictly to all environmental
and resource-based requirements of our approvals to ensure they are granted and maintained
throughout the entire life cycle of all site area operations. We have a particular focus on water
management as this is a key concern of local community members.
10
CRITICAL MINERALS GROUP LIMITED AND ITS CONTROLLED ENTITIES
A.B.N. 91 652 994 726
DIRECTORS REPORT
As we continue to integrate ESG into all facets of our operations, we will select and endorse an ESG
reporting framework, which, along with defined metrics, will form the basis for our reporting on ESG
throughout each successive design and operational year. Naturally, as this progresses, metrics
associated with natural capital are likely to emerge, which will provide further guidance on establishing
relevant metrics to satisfy this new reporting framework addition.
Social
Health, Safety and Wellbeing
Reliability and efficient workplace practices that safeguard internal and external members from harm and
promote well-being, education and progressive performance in a supportive professional environment.
Establishing a diverse workforce that focuses on safety and well-being and relishes increased prosperity
through positive performance and culture will be a key objective and provide a competitive advantage in
attracting and retaining talented, respectful, and engaged staff. We are guided by both our established
policies and the vast experience of our management team to instil a rewarding culture which promotes
assured advancement for both the Company and the workforce.
Local communities
Inclusive practices which share economic prosperity with local suppliers and the community through
procurement practices.
By sourcing materials from local producers where possible, we will be able to share the economic
value derived from the mineral extraction with the loca
Share your feedback