Significant Increase to Mineral Resource Estimate
Released
Released
Announcement PDF
ASX:CMG
ASX Announcement
10 May 2024
Significant Increase to Lindfield Project Mineral Resource
Estimate Following Recent Drilling Campaign
Indicated and Inferred Resources Estimate of 713 Mt at 0.32% V2O5, 3.4%
Al2O3 and 130g/t Mo comprising over 68% in the Indicated category.
Key Highlights
•
Lindfield Project's Mineral Resource Estimate (MRE) increases to 713 Mt, marking a 96%
increase.
•
518Mt (72%) of the resource is located within 20m of surface
•
The upgraded MRE incorporates the upper horizon (TLBA) as a result of its outstanding
beneficiation performance.
•
Upgraded MRE increases the overall Al2O3 mineralised material grading 3.4%. Lava Blue
continues to test Lindfield mineralised samples to further refine the HPA flow sheet.
Critical Minerals Group Limited (ASX:CMG) (or the Company), is pleased to provide a new Mineral
Resource Estimate (MRE) for its flagship Lindfield Project.
The MRE has delivered a 96% increase in resource size to 713 Mt, with the noted addition of
molybdenum to the resource.
The resource increase is a direct result of CMG’s drilling program which was completed in September
2023, providing material for pilot scale and further metallurgical test work.
This key achievement demonstrates CMG’s commitment to developing its flagship Lindfield Project.
The Company’s Managing Director Scott Winter commented on the upgraded MRE,
“It’s a credit to the technical team and the partners we work with in the development of the Lindfield
Project, that we have been able to announce a significant upgrade to the Lindfield Project Mineral
Resource Estimate. Not only have we been able to increase the mineralised material estimate of
vanadium and associated high purity alumina (HPA) but we have now added molybdenum to the
resource estimate. The upgrade to 713 Mt marks a 96% increase and is largely as a result of the
inclusion of the TLBA mineralisation of the resource that sits at or near surface.”
“This upgrade in the resource has flowed from the drilling performed in Q3 2023, the finalisation of
the scoping study on the Lindfield Project and the ongoing metallurgical test work that has been
Critical Minerals Group Limited | ACN 652 994 726 | Gold Tower, Level 4, 10 Eagle St QLD 4000
info@criticalmineralsgroup.com.au | (07) 55 555 077 | www.criticalmineralsgroup.com.au
Critical Minerals
performed. The metallurgical test work highlighted the superior performance of the TLBA
mineralisation in upgrading its concentration through the flotation. The test work and modelling also
highlighted the buildup of molybdenum in the circuit to economic levels. With these inclusions, the
overall planning, development and economics will be worked on further in the next phase of the
feasibility studies. The improvements to be added will include lower waste removal volumes, lower
strip ratio, increased mineralised material, increased mine life potential and the potential for an
additional revenue source through the production of molybdenum.”
“With the reduction in overall waste this also brings an environmental benefit to the project with less
waste dump requirements, less overall disturbance impact, and potentially lower rehabilitation costs.
“We look forward to working these into the next phase of the feasibility study and continuing to
investigate further opportunities as a result.”
Mineral Resource Estimate
The Lindfield Project MRE has been upgraded by John T. Boyd Mining and Geological Consultants of
Brisbane. The new MRE of 713 Mt at 0.32% V2O5 , 3.4% Al2O3 and 130 g/t Mo includes Indicated
Resource of 491 Mt at 0.32% V2O5 representing a significant increase in mineralised material (up
96%).
Table 1. New Lindfield Project Vanadium, High Purity Alumina (HPA) and molybdenum Mineral Resource
Summary
Resource
Category
Indicated
Inferred
Domain
Mass (Mt)
V₂O₅
wt%
Al₂O₃
wt%
Weathered
Fresh
Weathered
261
230
61
0.30
0.34
0.32
3.1
3.8
3.5
Fresh
161
713
0.31
0.32
3.5
3.4
Total
Mo
g/t
110
160
110
150
130
In comparison with the previous Mineral Resource Estimate1, the new MRE represents a significant
increase in scale from the previous 363Mt at 0.43% V2O5. Importantly the report identifies that a
major portion of the Mineral Resource is situated very close to surface indicating potential for lower
overburden removal costs and a simple pit shell design.
1
Refer to the Company’s ASX announcement dated 16 May 2023.
2
2
Table 2. New Lindfield Project In Situ Mineral Resources Estimate Categories
In Situ Mineral Resource (Mt at V2O5 wt%)
Horizon
TLBA
Indicated
259 at 0.22%
Inferred
120 at 0.23%
Total
378 at 0.22%
TLBB
152 at 0.48
63 at 0.45%
214 at 0.47%
TLBC
-
-
-
TLBD
80 at 0.33%
40 at 0.35%
120 at 0.34%
TLBE
-
-
-
Total
491 at 0.32%
222 at 0.31%
713 at 0.32%
Table 3. New Lindfield Project In Situ Mineral Resource – Overburden Depth
In Situ Mineral Resource (Mt at V2O5 wt%)
Overburden
Depth
Indicated
Inferred
Total
0 m - 10 m
205 at 0.33%
51 at 0.33%
256 at 0.33%
10 m - 20 m
220 at 0.31%
42 at 0.30%
262 at 0.31%
20 m - 30 m
65 at 0.32%
129 at 0.31%
195 at 0.31%
30 m - 40 m
-
-
-
491 at 0.32%
222 at 0.31%
713 at 0.32%
Total
3
3
Figures 1 & 2 (below): Indicative illustration of the effect of including the TLBA horizon in the MRE
TLBB and TLBD included in Mineral
Resource Estimate May 2023 (Upper
Horizon not included)
TLBA (Upper Horizon)
TLBB (Mid Horizon)
TLBD (Lower Horizon)
TLBA, TLBB and TLBD
included in Mineral Resource
Estimate May 2024 (Upper
Horizon included)
TLBA (Upper Horizon)
TLBB (Mid Horizon)
TLBD (Lower Horizon)
Vanadium Resource
The new MRE has identified a decrease in grade to 0.32% V2O5 from the previous estimate of 0.43%
V2O5 across the Indicated and Inferred Mineral Resource as a result of the inclusion of the lower
grade TLBA material for an overall increase in the V2O5 volume. The Mineral Resource has increased
significantly by 96% to 713 Mt Indicated and Inferred Mineral Resource Estimate from the previous
363 Mt Indicated and Inferred Mineral Resource Estimate.
Further upside has been defined in the shallower weathered zone, identifying an indicated 261 Mt
at 0.30% V2O5 and an inferred 61 Mt at 0.32% V2O5. The identification of lower grade mineralisation
that upgrades exceptionally well in the weathered domain adds further justification to the
development of the Lindfield Project. The weathered zone begins from surface, is soft and friable
and shows improved beneficiation over the fresh zone. Inclusion of the TLBA horizon results in very
4
4
low strip ratio mining straightforward mining operations, all of which are expected to have a
positive impact on the overall operating cost.
The upgraded MRE strengthens the Lindfield Project's positioning for the feasibility studies currently
underway. It will also serve as a foundation for further drilling to progress future MRE assessments.
With the MRE completed, the project objective will be to maximise the conversion of the Mineral
Resource to an Ore Reserve.
Aluminium Oxide – HPA feedstock
The new MRE has also increased the Al2O3 component of the mineralised material, grading 3.4%
across the 713 Mt, samples of which continue to be metallurgically assessed to refine the HPA
process. The ability to produce HPA feedstock from the Lindfield Project could potentially add
considerable value to the Lindfield Project as our initial test work and findings are further developed
into a flow sheet design alongside the vanadium production.
Molybdenum
The new MRE also takes in the molybdenum component of the mineralised material, grading 130 g/t
across the 713 Mt, which represents a by-product from the hydrometallurgical circuit.
5
5
Figure 3 (above): Plan view of the Lindfield Project Resource
6
6
Figure 4 (above): Cross Section of the Lindfield Project Resource
7
7
Conclusions
The Lindfield Project formation displays high lateral continuity with the likelihood of bulk horizon
extraction. Results are considered most favourable in the Project’s central southern area, with
shallow, weathered Toolebuc coquina-shale observed outcropping at surface.
In the Mineral Resource Estimate Report, John T. Boyd Company commented that CMG is following a
logical program to explore, study, and develop the Lindfield Project’s Mineral Resources.
Images 1 & 2 (below): Lindfield Project TLBA outcropping
8
8
In accordance with ASX Listing Rule 5.8.1 the Company provides the following information in respect
of the vanadium, HPA and molybdenum MRE:
o
Geology and geological interpretation: The Lindfield Project Mineral Resource is geologically
in the Toolebuc Formation with the geological interpretation consisting of historical
exploration reports and studies, the Company’s previous MRE and the Company’s 2022 and
2023 exploration drilling and results.
o
Sampling and sub-sampling techniques: Samples were put in core boxes, photographed and
geologically logged. The core samples were selected by lithological and geophysical
boundaries. All core samples were then quarter slabbed by Mitra PTS.
o
Drilling techniques: The drilling techniques for the 2023 program used were diamond core for
11 holes using 4C (4 inch) core diameter. The drill program also included two 8C-size core
holes and three 4C-size core holes drilled as twins on a previous hole.
o
Criteria used for classification: Criteria for classification considered the geology of the deposit
evaluating the structural and depositional environment. The selection of hole spacing
classification was made based on the Australian Guidelines for the Estimation and
Classification of Coal Resources (2014 edition). Based on the results of the geostatistical study,
the variography and industry guidelines, nominal spacing for points of observation in the MRE
have been defined to 1,000 metres for indicated, and 2,000 metres for inferred.
o
Sample analysis method: Samples were analysed by Bureau Veritas and ALS. Bureau Veritas
completed ICP-OES, LA-ICP-MS, XRF and Leco analysis. ALS completed ICP_MS and ICP-OES.
Mitra completed moisture and density analysis.
o
Estimation methodology: The stratigraphical geological model was used to complete an
estimate of the Mineral Resource using Maptek’s Vulcan 12.0.5. This included having
reviewed and validated the compiled database, created and validated the stratigraphic,
geological and grade models, reviewed exploration data to ascertain the level of geological
continuity for each working section and reviewed the estimation assumptions. Parameters
and criteria: The MRE was estimated on a horizon-by-horizon and working section basis.
o
Cut-off grade: A cut-off grade of 0.26% V2O5 was applied to the MRE TLBB and TLBD. A cutoff grade of 0.10% was applied to the TLBA. No minimum cut-off grade was applied to the
Al2O3 (wt%) for the HPA or Mo (ppm) in the molybdenum MRE - the resource represents a
byproduct of the vanadium processing flowsheet and as such, the vanadium working section
limits were applied to the HPA and Mo in the MRE.
o
A maximum overburden depth of 30 metres was applied as the lower constraint of the MRE.
o
Mining methods and parameters: Mining methods are applied on the basis of open cut
mining.
o
Metallurgical methods and parameters: It has been considered that a low-cost process of
beneficiation, flotation, atmospheric acid leaching, solvent extraction and precipitation is
9
9
expected to achieve vanadium extraction between 60% and 64%. Al2O3 and Mo extraction is
expected to be variable, dependent on hydrometallurgical circuit management.
This announcement was approved for release by the board.
For more information:
Scott Winter
Managing Director
info@criticalmineralsgroup.com.au
(07) 5555 5077
Competent Person Statements
The information in this announcement that relates to the new Exploration Results and Mineral
Resources Estimates is based on, and fairly represents, information compiled by Adrian Buck, a
Competent Person, who is a Member of the Australasian Institute of Mining and Metallurgy
(AusIMM). Adrian Buck is the Principal Geologist – Australia for John T Boyd Company. Adrian Buck
has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activities which they are undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Exploration
Targets, Mineral Resources and Ore Reserves’. Adrian Buck consents to the inclusion of the matters
based on his information in the form and context in which it appears.
Previously Reported Information
The information in this announcement that relates to the previously reported Mineral Resource
estimate is extracted from the Company’s announcement titled ‘Lindfield Vanadium Project Delivers
Improved Mineral Resouce Estimate with Grade and Tonnage to the World Class Scale’ released to
ASX on 16 May 2023 and which is available to view on www.asx.com.au. The Company confirms that
the form and context in which the Competent Persons’s findings are presented have not been
materially modified from the original market announcement.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are
not limited to, statements concerning planned exploration program and other statements that are
not historical facts. When used in this document, the words such as “could”, “plan”, “estimate”,
“expect”, “intend”, “may”, “potential”, “should” and similar expressions are forward-looking
statements. Although the Company believes that its expectations reflected in these forward-looking
statements are reasonable, such statements involve risks and uncertainties and no assurance can be
given that actual results will be consistent with these forward-looking statements.
10
10
Schedule 1 – Table of Lindfield Project drill-hole information (CMG holes)
Drillhole ID
Company
Easting
Northing
Elevation
(GDA94z54)
(GDA94z54)
(m)
Total
Depth Tenement Year
Hole Type
(m)
LIND001
CMG
599914
7739182
134
54
27872
2022 Diamond Core
LIND002
CMG
600831
7739483
131
42
27872
2022 Diamond Core
LIND003
CMG
599579
7738243
137
35
27872
2022 Diamond Core
LIND004
CMG
600677
7738516
132
30
27872
2022 Diamond Core
LIND005
CMG
601520
7738861
130
28
27872
2022 Diamond Core
LIND006
CMG
600996
7736995
136
30
27872
2022 Diamond Core
LIND006_B1
CMG
601002
7737019
136
30
27872
2023 Diamond Core
LIND007
CMG
600306
7737569
136
30
27872
2022 Diamond Core
LIND008
CMG
601254
7737888
133
36
27872
2022 Diamond Core
LIND009
CMG
602209
7738159
131
29
27872
2022 Diamond Core
LIND010
CMG
602003
7737214
132
42
27872
2022 Diamond Core
LIND011
CMG
601421
7736421
136
24
27872
2022 Diamond Core
LIND012
CMG
602329
7736241
134
42
27872
2022 Diamond Core
LIND013
CMG
601989
7736001
136
16
27872
2022 Diamond Core
LIND014
CMG
602735
7735408
135
24
27872
2022 Diamond Core
LIND015
CMG
603079
7734567
135
30
27872
2022 Diamond Core
LIND016
CMG
603171
7733147
135
25
27872
2022 Diamond Core
LIND016R
CMG
603171
7733147
135
25
27872
2022 Diamond Core
LIND016_B1
CMG
603168
7733147
135
10
27872
2023 Diamond Core
LIND017
CMG
605078
7732805
130
120
27872
2022
RC Hole
LIND017R
CMG
605078
7732805
130
20
27872
2022
RC Hole
LIND018
CMG
603094
7732182
139
25
27872
2022 Diamond Core
LIND019
CMG
603313
7731299
140
34
27872
2022 Diamond Core
LIND020
CMG
602990
7730601
139
28
27872
2022 Diamond Core
LIND020_B1
CMG
602986
7730592
139
28
27872
2023 Diamond Core
LIND020_B2
CMG
602989
7730596
139
28
27872
2023 Diamond Core
LIND020_B3
CMG
602991
7730601
139
28
27872
2023 Diamond Core
LIND021
CMG
603627
7730361
136
72
27872
2022 Diamond Core
LIND022
CMG
602888
7729675
138
30
27872
2022 Diamond Core
LIND023
CMG
603020
7728707
133
35
27872
2022 Diamond Core
LIND024
CMG
603085
7727729
137
64
27872
2022 Diamond Core
LIND026
CMG
602890
7734104
137
25
27872
2023 Diamond Core
LIND027
CMG
603431
7734130
134
25
27872
2023 Diamond Core
LIND027A
CMG
603434
7734126
134
25
27872
2023 Diamond Core
LIND028
CMG
602911
7733591
138
20
27872
2023 Diamond Core
11
11
LIND029
CMG
603381
7733594
134
22
27872
2023 Diamond Core
LIND030
CMG
602877
7732698
136
19
27872
2023 Diamond Core
LIND031
CMG
603364
7732663
132
25
27872
2023 Diamond Core
LIND032
CMG
602874
7731721
140
31
27872
2023 Diamond Core
LIND033
CMG
603361
7731751
140
19
27872
2023 Diamond Core
LIND034
CMG
602898
7731165
140
31
27872
2023 Diamond Core
LIND035
CMG
603393
7730794
140
37
27872
2023 Diamond Core
LIND036
CMG
603928
7730816
136
25
27872
2023 Diamond Core
12
12
APPENDIX A
JORC CODE, EDITION 2012 - TABLE 1
CHECKLIST OF ASSESSMENT AND REPORTING CRITERIA
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code Explanation
•
•
•
•
Drilling
techniques
•
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken
as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
•
•
•
2022 and 2023 exploration samples have been taken from diamond core drilling only.
Recovery of the core is recorded in the drill hole lithological logs, which are recorded by
suitably qualified geologists present at the time of drilling.
Cores were longitudinally cut, and then a sample was obtained from ¼ of the core,
prepared by laboratory technicians working under the direction of the Project Geologist.
Geophysical logs were used to correct the recorded depths of the Toolebuc Formation roof
and floor intersections.
The total tenure Project contains 95 holes, including 54 holes drilled by previous explorers,
24 holes drilled and previously reported by CMG and 17 exploration holes drilled by CMG in
13
13
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Commentary
type, whether core is oriented and if so, by what method, etc).
•
•
•
•
•
•
Drill sample
recovery
•
•
•
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
•
•
•
•
•
Logging
•
•
•
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
•
•
•
•
•
•
•
2023.
34 4C-size (100mm) diamond core holes for resource definition.
The conventional drilling method drilled diamond core intervals, typically over 4.5 m length
runs.
The core size has been 4C (100 mm), providing ample material for metallurgical test work.
Two metallurgical larger diameter 8C-sized (200 mm) diamond core holes.
Holes were drilled vertically; verticality logs were run to confirm deviation.
Drilling by S&K Drilling Pty Ltd and J&S Drilling Pty Ltd using a Fraste FS400 drill rig.
2022 and 2023 drill chips and core were assessed, logged and photographed on site by
suitably qualified geologists.
Linear recovery was recorded for each core run, comparing the length of the core recovered
versus drill depth.
Core recoveries were generally better than 95%; however, core recoveries of approximately
75% have been recorded in some softer, weathered, mineralised zones.
The core required for analysis was sampled at the core storage facility from core storage
boxes after longitudinal core cutting.
There is no known relationship between sample recovery and the assay results received
from the laboratory.
2022 and 2023 core and chip samples have been logged in detail, which supports the
estimation of mineral resources.
Geological logging was completed to the CoalLog – Australian Coal Logging Standard, as
developed by the Australian Coal Association Research Program (ACARP) and adopted by
the Australasian Institute of Mining and Metallurgy (AusIMM). The logging system is well
suited to stratified sedimentary deposits.
Logging has been quantitative for recording depth.
A geologist’s visual interpretation of geological characteristics and grain size has been used
to differentiate rock types.
Qualitative records include percentages of lithologies where interbedded intervals have
been encountered, degree of weathering and rock strength.
A digital photographic record is maintained for drill core and chip samples.
Geological logging data is stored in an Isis Vulcan database.
14
14
Section 1 Sampling Techniques and Data
Criteria
Sub-sampling
techniques and
sample
preparation
JORC Code Explanation
•
•
•
•
•
•
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Commentary
•
2022 and 2023 samples were taken across the entire Toolebuc Formation interval to
characterise mineralisation for the complete formation. Samples above and below the
mineralised formation were also routinely taken to characterise dilution materials.
•
The core required for laboratory analysis was sampled at the core storage facility from core
storage boxes after longitudinal core cutting. Full sections (continuous and contiguous) of
the quarter core diameter of each sample were taken.
Core sample intervals were selected in smaller increments representing mineralisation
horizon and weathering domain boundaries or lithological units.
Check samples included CRMs, lab and blind duplicates and blanks were included in the
assay stream.
Sample preparation was carried out by Mitra PTS Pty Ltd (Mitra) laboratories in Gladstone,
using Australian Standards laboratory procedures. Mitra Gladstone is accredited by the
National Association of Testing Authorities (NATA; NATA corporate accreditation No:
14525, corporate site No: 14569.
Once Mitra received the core boxes, cores were longitudinal cut, and then ¼ core was
sampled by laboratory technicians under the direction of the Project geologist. Samples
were weighted and entered into a sample tracking system. Samples were then dried and
crushed to ensure that 70% of the sample was below 6 mm, and then a 250 g split riffled off
with the remaining stored as a reserve. The 250 g splits were then milled to 75 µm. Pulp
samples were split for each analytical method, with the pulp reject retained and stored.
•
•
•
•
Quality of assay
data and
laboratory tests
•
•
•
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
•
•
2022 and 2023 samples were analysed by Bureau Veritas (BV), ALS (ALS) and Mitra.
BV Perth completed the laser ablation method (XRF202, LA101) and was cast using 66:34
flux with 10% lithium nitrate to form a glass bead. The sample was then analysed by X-Ray
fluorescence spectrometry for Al2O3, CaO, Cl, Cr2O3, Fe2O3, K2O, MgO, MnO, Na2O, P2O5,
SiO2, SO3, TiO2, and V2O5. The glass bead was then analysed by laser ablation ICP-MS for
Ag, As, Ba, Be, Bi, Cd, Ce, Co, Cr, Cs, Cu, Dy, Er, Eu, Ga, Gd, Ge, Hf, Ho, In, La, Lu, Mn,
Mo, Nb, Nd, Ni, Pb, Pr, Rb, Re, Sb, Sc, Se, Sm, Sn, Sr, Ta, Tb, Te, Th, Ti, Tl, Tm, U, V, W,
Y, Yb, Zn, and Zr.
15
15
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
of accuracy (ie lack of bias) and precision have been established.
Commentary
•
•
•
•
•
•
Verification of
sampling and
assaying
•
•
•
•
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
•
•
•
•
•
•
Approximately 10% of samples were duplicate tested by BV Adelaide by ICP-OES and ICPMS by analytical methods (LB100, LB101, LB102). An aliquot sample is accurately weighed
and fused with lithium metaborate at high temperature in a Pt crucible. The fused glass is
then digested in nitric acid.
Mitra Gladstone completed moisture and density testing using analytical methods
(AS1038.1, AS1038.3, AS1038.17, AS1038-12.1.1).
External laboratory checks were completed with a 10% subset of samples duplicate tested
by ALS Brisbane by ICP-OES and ICP-MS by analytical methods (ME-MS41, ME-MS81).
The quality of exploration assay results has been monitored by duplicate testing by a
second analytical method and duplicate testing by a second laboratory.
Blank and Certified Reference Materials (CRMs) have been included in sample batches to
monitor accuracy.
Downhole geophysical logging was completed by Weatherfords with service and equipment
to the American Petroleum Institute (API) standards Q1 and 14A, and logs were recorded to
international Logging Ascii Standards (LAS). The parameters surveyed are appropriate for
use in conjunction with lithological data to determine the Toolebuc Formation roof and floor
locations.
There are strong visual indicators of the Project’s mineralised interval observed in the drill
core, and significant assays are visually verified against drill hole photographs.
Where anomalous results are detected, it is standard practice for the laboratory to retest the
sample.
Twinned hole testing has been included in the exploration program.
Adjustments were made to the reported assay data; where the Lab reported vanadium
results as an element or ppm, they were converted to oxide weight per cent using standard
practices.
A correction factor was applied to the November 2022 LB101 assay results to align with the
November 2022 LA101 assay results. The correction factor was applied based on QAQC
establishing that LB101 was under reporting vanadium grades by approximately 7% due to
incomplete digestion of resistive minerals. Refer Section 11.4.
A batch of September 2023 check samples showed a poor correlation between primary
assay method LA101 versus check sample methods LB101 and MA101 and a poor
correlation between primary laboratory BV versus umpire laboratory ALS. Assessment of
the poor correlation established the likely cause as the results of inconsistency in laboratory
16
16
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Commentary
preparation by “ashing” on the batch of check samples. Check assays from LA-ICP-MS and
XRF were not ashed and showed good quality correlation, sufficient to meet the project
QA/QC requirements. Poor check sample results from LB101 and MA101 techniques were
considered unreliable and disregarded. Refer Section 11.6
Location of data
points
•
•
•
Data spacing
and distribution
•
•
•
Orientation of
data in relation to
geological
structure
•
Sample security
•
•
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used
in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied.
•
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation of
key mineralised structures is
Share your feedback
Discover