Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX Announcement
ASX: CMG
31 July 2025
Quarterly Activities Report & Appendix 5B for the period ending
30 June 2025
Key Highlights
• CMG successfully raised $2.7 million through an entitlement offer
• Continued development across the three business segments as below:
Downstream: Battery Energy Storage Solutions
•
•
•
•
CMG have significantly progressed its downstream operations building a pipeline of potential
VFB projects
McKinlay Shire council announced at the Julia Creek industry roundtable event their
partnership with CMG to investigate a VFB in Julia Creek
Critical Minerals Group (CMG) hosted Sumitomo Electric in Brisbane
o VFB Masterclass with key customers and stakeholders
o Customer meetings to understand requirements and potential opportunities
Noosa Power and Energy Conference
o Scott Winter and Nicola Semler presented at the Noosa Power and Energy Conference
Midstream: Vanadium Electrolyte Manufacturing Facility Development
•
•
CMG complete FEED phase in vanadium electrolyte construction in Logan City, on time and
under budget
Virtual tour of CMG’s Vanadium Electrolyte Facility with Mayor Jon Raven from Logan City,
Sumitomo Electric, and Idemitsu Australia
Upstream: Julia Creek Mine Development
•
•
Continuation of environmental studies at Lindfield Vanadium Project
o IAS (Coordinated Project) application in final stages of review along with EPBC submission
o Series of field studies completed during the period with reports pending
Pre-Feasibility Study Progress
o All studies are progressing well
o Continued metallurgical test work to reduce reagent and water consumption
criticalmineralsgroup.com.au
(+61) 731 323 504
Level 15, 100 Edward St, Brisbane QLD 4000, Australia
info@criticalmineralsgroup.com.au
Critical Minerals Group Limited (ASX:CMG), (Critical Minerals Group, CMG, or the Company) is pleased
to provide shareholders with the following update in relation to the Company’s activities for the quarter
ended 30 June 2025 (Quarter).
Company activities
Downstream: Vanadium battery energy solutions
CMG are delivering on the expanded strategy to target the delivery of energy storage solutions by 2026
The progress CMG has made in the development of the vanadium battery energy solutions business
has been significant over the last quarter and has reconfirmed the strategy to target the delivery of
long-duration vanadium energy storage solutions in FY26.
CMG has maintained a focus on several key aspects across the supply chain to enable the initial
assessment, delivery, operation and maintenance of a vanadium flow battery for long-duration
storage. In summary, these focus areas include:
1. The Australian energy market, participants and operations
2. Supply chain dynamics to secure capability and capacity, build relationships and form strategic
supply agreements
3. Defining the target markets and customer characteristics
4. Establishing the appropriate commercial models and the technical and financial product
offering.
1.
The Energy Market
CMG is targeting the growth of the vanadium battery energy solutions to initially occur in Australia,
which makes it important to understand the dynamics of the Australian energy market. It is well
documented that with the increasing installation of roof top solar coupled with grid scale solar and
wind projects, there is surplus energy in the market for a high proportion of the daytime. It is also
documented1 that the transmission infrastructure is insufficient in certain regions of the NEM (National
Electricity Market) and WEM (Wholesale Electricity Market) to distribute generated renewable energy. In
both of these instances the energy regulator, AEMO manages the energy and curtails various
generators to maintain stability within the grid. The same is not true for the hours of the evening when
the variable renewable generators are not generating power and fossil fuels make up approximately
80% of the energy mix illustrated by images 1 and 2 below highlighting the energy mix at two points of
the day. What is clear is that variable renewable energy generation during daylight hours is increasing,
adding to over supply and negative power prices, whereas the night time supply remains dependent
upon fossil fuels.
1
AEMO Media Release, AEMO | AEMO provides locational insights to inform investment in the NEM, 09 July 2025
criticalmineralsgroup.com.au
Image 1: Generation Mix at Midday
Image 2: Generation Mix at 6pm
A major use case for VFBs is storing energy during periods of excess and shifting it to times of shortage.
CMG is promoting the use of VFBs to shift the excess energy generated in the daytime by solar (grid
scale and rooftop) or wind, to the evening period. With the VFBs ability to store 10-12+ hours of energy
and deliver this back over a different 10-12 hour period, energy stored from the daytime can support the
majority of energy needs during the night. Long duration storage is required to support the distributed
energy needs and grid requirements as coal-fired power generators are gradually retired, a
requirement that will not be met by short-duration Lithium batteries, nor geographically dependent
pumped hydro.
In recent months, there have been notable cases where VFBs have been installed or specified as a
solution to meet a particular energy need. Rongke Power, based in China, recently announced the
completion of the largest VFB installation in Wushi, China, which is a 175MW, 700MWhr VFB battery. The
Western Australian government pledged $150 million towards a 50MW vanadium battery to be
constructed in Kalgoolie-Boulder. Invinity, a VFB manufacturer, announced last year an expansion of its
VFB factory to 500MWh per annum. The market generators in Australia are now releasing tender
specifications for battery storage with 8 or more hours of storage requirements, which suit flow battery
technology.
CMG is confident in the demand prospects for VFBs technology in Australia and the growth profile as
the energy transition continues both in Australia and globally.
2.
Supply chain dynamics
CMG announced that it would participate across the entire value chain from the production of V2O5
from the Lindfield mine in Julia Creek, through the manufacture of vanadium electrolyte in Logan City,
to the installation of vanadium flow battery solutions. In implementing this strategy, CMG has
emphasised a particular focus on the downstream delivery of vanadium flow batteries. This is primarily
driven by the need to clearly define and understand the VFB market size, demand, and delivery
dynamics, so that vanadium electrolyte and vanadium pentoxide production can be sized and
scheduled accordingly.
With a focus on the VFB solutions business, CMG has had to investigate the services, suppliers and
regulatory framework required to supply and install a VFB. The key areas and activities where CMG is
building both capability and capacity to deliver include:
criticalmineralsgroup.com.au
-
Market assessment
Technical and financial feasibility
Regulatory and approvals
Key component supply items – vanadium flow battery (dry battery, vanadium electrolyte), power
control system, balance of plant
OEM supply support
EPC contracting – civil and electrical delivery
Operations and maintenance
CMG has engaged with various participants and formed strategic partnerships to provide supply
certainty to potential customers. CMG has developed the capability to conduct a comprehensive
technical and financial feasibility study for a VFB project that can be standalone or integrated into an
existing connection (renewable or non-renewable). CMG has sourced V2O5 of the appropriate quality
to support the manufacture of vanadium electrolyte at the Logan City facility. CMG has formed
relationships to procure a range of vanadium batteries and balance-of-plant assets for specific
projects. As each of the projects identified in the pipeline progresses, the relevant EPC contractors with
whom CMG have been in discussion will be engaged according to the specific characteristics of the
project.
As projects vary in size and capacity, CMG will initially provide vanadium electrolyte to the maximum
capacity that the Logan facility can manufacture. Several of the VFB feasibility studies underway
require vanadium electrolyte quantities in excess of CMG’s capacity. As such, some VFBs may be filled
with third-party vanadium electrolyte or procured as wet batteries from the battery supplier.
3. Target Market and clients
As previously indicated, CMG has segmented the market into opportunities where it feels the
characteristics of VFBs provide the most significant benefits. VFBs have a technical capability to react
quickly and can thus operate to support short duration arbitrage and FCAS markets (frequency control
ancillary services); however, CMG’s strategy targets the long duration attributes of VFBs and, as such,
looks for opportunities where storage durations of greater than 8 hours are required. Similarly, the
ability to provide stable, reliable, long-duration energy storage makes it suitable for power security and
continuous power supply applications such as in data centres and critical infrastructure.
As previously announced, CMG is conducting various feasibility studies for clients, and each is
progressing through technical and financial evaluation. CMG are particularly excited about partnering
with the McKinlay Shire Council (Julia Creek) in North Queensland in evaluating the opportunity to
install a vanadium battery to support the town’s growing energy needs, as well as showcase the
benefits of vanadium flow batteries in a region hosting significant vanadium resources.
CMG has identified a pipeline of potential VFB project opportunities, with the majority focusing on the
addition of VFBs to existing variable renewable energy generators. VFB projects that are in the pipeline,
including the potential size rating, and are currently under evaluation include the following:
-
Mine site 5-10MW (QLD) – evaluating the integration of renewable energy to offset against
grid power.
-
Heavy machine workshop 2 MW(QLD) - evaluating the integration of renewable energy to offset
against grid power.
criticalmineralsgroup.com.au
-
Remote community 500kw (QLD) – sewage treatment plant – evaluation of standalone solar and
VFB.
30MW Solar Farm – (NSW) assessing the addition of a VFB alongside a Solar generator in a hybrid
configuration with the purpose of shifting daytime generation to the evening.
3 x 5MW Solar Farms (NSW) assessing the addition of a VFB alongside a Solar generator in a hybrid
configuration with the purpose of shifting daytime generation to the evening.
2 x Wind Farm 50-75 MW (NSW) assessing the addition of a VFB alongside a wind generators in
a hybrid configuration with the purpose of shifting daytime generation to the evening.
2 x Solar Farms 30 MW (QLD) - assessing the addition of a VFB alongside a Solar generator in a
hybrid configuration with the purpose of shifting daytime generation to the evening.
The Company notes that while it is in active discussions with each of the respective counterparties in
the above opportunities, no binding terms have yet been agreed and there is no guarantee that the
discussions will result in a commercial contract.
4. Commercial Progress
As part of the technical and financial analysis carried out on potential projects during the feasibility
phase, CMG carries out an assessment of the existing infrastructure and then designs an appropriate
VFB to suit the client’s overarching objectives. During this process, CMG prepares a technical
specification that is provided to a range of VFB, PCS, transformer and associated balance of plant
suppliers. CMG then assesses2 the technical and pricing responses provided by each supplier.
The analyses that CMG has carried out to date on the range of potential projects has enabled CMG to
accurately determine the installed capital cost for a vanadium flow battery storage solution in $/kwhr.
It has also enabled the accurate calculation of the levelised cost of storage LCOS (ie <$150/MWhr3),
which for a battery energy storage project with a duration greater than 6 hours is lower than its
lithium-ion battery equivalent.
CMG has considered a range of commercial models that can be offered to clients. These range from
the client owning the VFB upon installation and CMG receiving a service margin for delivering the
battery asset, to CMG retaining ownership of the asset and leasing/renting the asset to the client under
a long-term lease contract. A range of hybrid options between these two models is also available.
The fact that vanadium electrolyte does not degrade over the battery's lifespan allows for greater
flexibility in the commercial models offered to clients.
2
The VRFB’s unique ability to cycle more than once per day without degradation and turning semi-scheduled
variable renewable energy (VRE) generation into stabled, scheduled power supply, is a characteristic that will be
welcomed by the network operator, as well as VRE generators.
3
The VRFB’s unique ability to cycle more than once per day without degradation and turning semi-scheduled
variable renewable energy (VRE) generation into stabled, scheduled power supply, is a characteristic that will be
welcomed by the network operator, as well as VRE generators.
criticalmineralsgroup.com.au
CMG hosted Sumitomo Electric in Brisbane
In line with its progress in delivering VFB energy storage solutions, CMG has established a key
partnership with Sumitomo Electric, one of the world’s leading suppliers of VFB Battery technology,
based in Japan.
Through that partnership, CMG hosted senior members of the Sumitomo Electric team in Brisbane in
May of this year and held several successful introductory and technical events regarding vanadium
flow batteries while they were in Brisbane.
VFB Masterclass
CMG and Sumitomo hosted a VFB Masterclass, attended by 40 key stakeholders from the resource,
manufacturing, infrastructure, and energy sectors, as well as local and state government officials and
department representatives. The event aimed to educate attendees about VFB technology and explore
suitable and prospective applications for this technology.
Representatives from Sumitomo and partner consulting groups were in attendance and accompanied
CMG in delivering the technical aspects of the VFB as well as the current characteristics of the energy
market including where VFBs would be best suited.
Power and Energy Conference, QLD
CTO, Nic Semler and Scott Winter had an opportunity to attend and present at the Power and Energy
Conference recently held in Noosa, QLD. This year’s conference brought together several industry
leaders, government officials, policymakers, and experts to discuss the critical role of regional Australia
and its resources in driving the national energy transition.
Nic spoke about the variety of battery technology alternatives and their operating characteristics. Nic
highlighted the technical and commercial readiness of each technology, as well as the use cases for
each type of battery. Scott spoke about the important role mining plays in the energy transition and, in
particular, the need to build robust supply chains within Australia to strengthen CMG’s capability further
downstream into manufacturing of active materials for energy storage, assembly, and development of
battery technology.
The conference highlighted the rapid pace of change in the refinement of new technologies and the
decreasing capital costs associated with them. It also highlighted the significant advancements made
in renewable energy generation, noting that rooftop solar, grid-scale solar, and wind were generating
nearly 80% of the energy during the day. However, long-duration storage was needed throughout the
night when renewable energy generation dropped away.
criticalmineralsgroup.com.au
Mid-stream: Vanadium Electrolyte (VE) Facility Development
Sedgman Prudentia Completed the FEED Stage 1 of the VE facility on time and under budget.
The DA amendment to account for 24/7 operations is progressing and is on track. NBN communications
have been installed in readiness for the construction and commissioning phase.
CMG have commenced the process of qualifying its vanadium electrolyte with battery manufacturers
and is in discussion regarding offtake agreements with strategic battery and associated partners. 120kg
of Pentoxide has been procured for VE demonstration production purposes.
In parallel to the development of the 1 million litre vanadium electrolyte (VE) manufacturing facility CMG
is carrying out additional investigations into the expansion of the VE facility to support the prospective
opportunities arising from the vanadium battery storage solutions. This is considering all necessary
aspects including capital, location, technical specifications, size and delivery.
Virtual tour of CMG’s Vanadium Electrolyte Facility with Mayor Jon Raven,
Sumitomo Electric, and Idemitsu Australia
CMG's CEO Scott Winter was honoured to host Mayor Jon Raven, the Logan Office of Economic
Development, Sumitomo Electric, and Idemitsu Australia Pty Ltd. for a virtual tour of CMG's Vanadium
Electrolyte Manufacturing facility currently under development in the City of Logan.
Sedgman Prudentia showcased the design of the facility through advanced virtual modelling, enabling
participants to experience the completed layout and gain valuable insights into the innovative
engineering behind the project.
CMG's Vanadium Electrolyte manufacturing facility is crucial to establishing the end-to-end supply
chain for Vanadium in Queensland. This project represents a significant step forward in securing
Australia's energy future and supporting global communities with VFB energy solutions.
Upstream: Pre-Feasibility Study and Project Development
The field component of several EIS studies for the Lindfield Project was completed in the quarter, with
reports pending. These included surface water sampling, soil sampling, noise surveys, and additional
ecological surveys. Desktop cultural heritage surveys were also completed, and planning for the field
cultural heritage surveys commenced.
criticalmineralsgroup.com.au
Metallurgical Test work
A review of the flowsheet was completed with optimisation avenues identified and planned.
Water balance optimisation works are ongoing, as ways to reduce consumption are investigated.
Development and Environmental Studies and Approvals/Permits
Engagement continued with key stakeholders throughout the Quarter, including the Office of the
Coordinator-General (CG), the Queensland Government’s Critical Minerals Office (CMO), local
Traditional Owners and underlying landholders. Meetings were also held with the Department of Local
Government, Water, and Volunteers to discuss water requirements, access processes, and timing.
Consultation with the various technical specialists continued to ensure the progression of necessary
background and impact assessments for the EIS. A number of field studies recommenced after the
weather delays in the March quarter, with draft reports due in the September quarter. Completion of
some studies is still pending as their timing is dependent on the wet season/dry season cycle.
Image 3: Revised project footprint for Lindfield – currently under review with relevant stakeholders
criticalmineralsgroup.com.au
Projects and Exploration Update
During the Quarter, CMG continued to make progress across its Vanadium projects and tenements.
Below is the current map showing CMG’s current Vanadium tenements.
Image 4: Location of CMG Limited vanadium tenements in the Julia Creek area
Lindfield Project (EPM 27872)
The Lindfield Project is CMG’s flagship project located 30km east of Julia Creek in North-West
Queensland. The Lindfield Project consists of 92 sub-blocks, covering 295km2. An update on this project
is outlined below:
Progression of Pilot Plant Test work
Please see the separate section above for the relevant update.
Specific Environmental (EIS) Studies Conducted to Advance Approvals
Please see update above
Community and Government Engagement
CMG personnel attended the most recent Critical Minerals Roundtable in Julia Creek in May. Meetings
were also held with the mayors of both the McKinlay and the Richmond Councils.
Upcoming Works Program
During the upcoming September Quarter, the Company plans to carry out the following work for the
Lindfield Project:
•
PFS work continues around flowsheet refinements and opportunities for footprint optimisation
criticalmineralsgroup.com.au
•
Preparation and despatch of various samples for evaluation by a potential international offtake
partner
•
Collation and review of the draft chapters of the major reports completed to date
•
Final submission of the Environment Protection and Biodiversity Conservation Act 1999 (Cth)
referral to the Federal Government was temporarily delayed to enable the findings from the
latest ecological field study to be included in the data and to better align with the overall
proposed project timing
•
Submission of a draft Mining Lease (MLa) boundary that minimises landholder impacts and
minimises annual lease costs. The boundary informs the zones that the EIS field studies are
focused on.
Lara Downs Project (EPM 28635) and Lindfield North Project (EPM 28636)
The Lara Downs and Lindfield North Project are both located within 70km (north) of Julia Creek, with the
Lindfield North Project adjoining the existing Lindfield Project and the Lara Downs Project within 35km of
the Lindfield Project.
Lindfield North consists of 36 sub-blocks covering 115 km2. Lara Downs consists of 118 sub-blocks
covering 378km2.
Exploration plan for Lindfield North and Lara Downs Projects
CMG considers that both the Lindfield North Project and the Lara Downs Project can benefit from the
learnings of, and results from, exploration in the region to date.
Other than the feedback on the CEI application (see above) there is no further update for these
tenements for this Quarter.
Upcoming Works Program
There is no work currently scheduled for these two tenements in the upcoming June Quarter.
Whinmoor Project (EPM 28631)
The Whinmoor Project consists of 100 sub-blocks covering 320 km² and is located 60km north of Julia
Creek.
The Whinmoor Project intends to extend on exploration by previous explorers and known extensions to
vanadium mineralisation in the Company’s Lindfield Project.
There is no further update for this tenement for this Quarter.
Upcoming Works Program
A drilling plan has been developed for exploration of the Whinmoor tenement, however timing is yet to
be confirmed. There is no work scheduled for this tenement in the June Quarter.
criticalmineralsgroup.com.au
Figtree Creek Project (EPM 27998) and Lorena Surrounds Project (EPM 27999)
No substantive exploration activities or fieldwork had been undertaken on the Tenements for this
Quarter. The Company will continue to assess commercial options going forward.
criticalmineralsgroup.com.au
ASX Announcements during the Quarter
This quarterly report contains information released to ASX, which has been reported in accordance with
the JORC Code (where required). These announcements can be found on the Company’s website at
criticalmineralsgroup.com.au/investor
•
2 April 2025
Strategy Update & Webinar notification
•
2 April 2025
Investor Presentation – CMG Strategy
•
4 April 2025
Webinar Reminder – Strategy Update Presentation
•
23 April 2025
Entitlement Offer to raise up to approximately $7.4 million
•
23 April 2025
Proposed issue of securities – CMG
•
23 April 2025
Cleansing notice under section 708AA(2)(f) Corporations Act
•
23 April 2025
Cancel – Proposed issue of securities – CMG
•
24 April 2025
Entitlement Offer
•
24 April 2025
Proposed issue of securities – CMG
•
24 April 2025
Cleansing Notice
•
24 April 2025
Notice regarding Entitlement Offer
•
30 April 2025
Quarterly Activities/Appendix 5B Cash Flow Report
•
1 May 2025
Dispatch of Entitlement Offer documents
•
19 May 2025
Results of Entitlement Offer
•
19 May 2025
Application for quotation of securities – CMG
•
21 May 2025
Change in substantial holding – Idemitsu
•
26 May 2025
Change in substantial holding
•
29 May 2025
Non-executive director resignation
•
17 June 2025
Final Director’s Interest Notice
•
20 June 2025
Appointment of Joint Company Secretary
Financial Commentary
The Quarterly Cashflow Report (Appendix 5B) for the Quarter provides an overview of the Company’s
financial activities.
Exploration expenditure for the Quarter was $899,602, while corporate and other expenditures totalled
$658,304 (including $433,472 in salaries and director fees).
In accordance with the Company’s disclosure obligations under ASX listings rule 5.3.5, the total amount
paid to directors and their associates in the Quarter (item 6.1 of the Appendix 5B) was $141,060 and
included the Managing Director’s salary.
criticalmineralsgroup.com.au
Forward-Looking Statements
This announcement may include forward-looking statements. Forward-looking statements
include, but are not limited to, statements concerning planned exploration program and
other statements that are not historical facts. When used in this document, the words such
as “could”, “plan”, “estimate”, “expect”, “intend”, “may”, “potential”, “should” and similar
expressions are forward-looking statements. Although the Company believes that its
expectations reflected in these forward-looking statements are reasonable, such statements
involve risks and uncertainties and no assurance can be given that actual results will be
consistent with these forward-looking statements.
This announcement was approved by the board of directors of CMG.
For more information contact:
Scott Winter
CEO and Managing Director
info@criticalmineralsgroup.com.au
(07)3132 3504
criticalmineralsgroup.com.au
Schedule 1 – Tenement Schedule as at 30 June 2025
Project
Name
Location
Tenement
Status
Equity at 31
December
2024
Equity at 31
March 2025
Changes
during
Quarter
Lindfield
Project
Julia Creek
EPM 27872
Granted
100%
100%
-
Figtree
Creek
Project
Cloncurry
EPM 27998
Granted
100%
100%
-
Lorena
Surrounds
Project
Cloncurry
EPM 27999
Granted
100%
100%
-
Whinmoor
Project
Julia Creek
EPM 28631
Granted
100%
100%
-
Lara Downs
Project
Julia Creek
Granted
100%
100%
-
Lindfield
North
Project
Julia Creek
Granted
100%
100%
-
EPM 28635
EPM 28636
criticalmineralsgroup.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
CRITICAL MINERALS GROUP LIMITED
ABN
Quarter ended (“current quarter”)
91 652 994 726
30 JUNE 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
(1)
(3)
(d) staff costs
(433)
(1,323)
(e) administration and corporate costs
(244)
(1,366)
3
14
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
-
750
1.8
Other (relates to R&D tax incentive)
17
547
1.9
Net cash from / (used in) operating
activities
(658)
(1,382)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(c) property, plant and equipment
(503)
(661)
(d) exploration & evaluation
(900)
(2,542)
-
(275)
(a) entities
(b) tenements
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
(1,402)
(3,478)
2,498
4,992
(59)
(305)
2,439
4,687
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities (i)
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
881
1,432
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(658)
(1,382)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(1,402)
(3,478)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
2,439
4,687
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
1,260
1,260
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Share your feedback
Discover