INVESTOR PRESENTATION
The Noosa Mining Investor Conference
November 2023
Empowering a Sustainable Future
Pioneering High-Quality Vanadium for the
Energy Storage Revolution
ASX:CMG
1
1
Disclaimer
Critical Minerals Group Limited ACN 652 994 726 (CMG or the company) is the issuer of this presentation.
Securities Disclaimer
This presentation is for informational purposes only and does not constitute an offer to sell, or solicit to purchase, any securities.
Reliance on Presentation
A recipient of this presentation must make their own assessment of the matters contained herein and rely on their own investigations and judgment in making an investment in CMG. This presentation does not purport to
contain all of the information a recipient of this presentation may require to make an informed decision whether to invest in CMG. Specifically, this presentation does not purport to contain all the information that investors
and their professional advisers would reasonably require to make an informed assessment of CMG’s assets and liabilities, financial position and performance, profits, losses and prospects.
No Recommendation
The information in this presentation is not a recommendation to acquire shares and does not constitute financial advice. Any person who intends to acquire shares must conduct their own investigations, assessment and
analysis of CMG and its operations and prospects and must base their investment decision solely on those investigations and that assessment and analysis. Prospective investors should consult their own legal, accounting, tax
and financial advisers about an investment in CMG.
JORC Statement
The information in this presentation relating to Mineral Resources is extracted from the company’s ASX announcement titled ‘Lindfield Vanadium Project Delivers Improved Mineral Resources Estimate with Grade and
Tonnage to World Class Scale’ dated 16 May 2023 which is available to view on www.asx.com.au. The company confirms that it is not aware of any new information or data that materially affects the information included in
the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The
company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Production targets and forecast financial information
The information in this presentation that relates to production targets and forecast financial information derived from a production target is extracted from the company’s ASX announcement dated 9 November 2023 (“CMG
successfully completes Scoping Study for Flagship Lindfield Vanadium Project”) available to view at www.asx.com.au (Scoping Study Announcement). The company confirms that all material assumptions underpinning the
production targets and forecast financial information derived from production targets set out in the Scoping Study Announcement continue to apply and have not materially changed.
Scoping Study cautionary statement
The Scoping Study referred to in this presentation is based on the Scoping Study released by the company to ASX in the Scoping Study Announcement.
The company advised that the Scoping Study has been undertaken to consider the development of the Lindfield Vanadium Project. It is a preliminary technical and economic study of the potential viability of the Lindfield
Vanadium project. It is based on low-level technical and economic assessments that are not sufficient to support the estimation of ore reserves. Further evaluation work and appropriate studies are required before the
company will be in a position to estimate any ore reserves or to provide an assurance of an economic development case. There is a low level of geological confidence associated with any Inferred Mineral Resources, and
there is no certainty that further exploration work will result in the determination of Measured or further Indicated Mineral Resources or that the Production Schedule or preliminary economic assessment will be realised.
The Scoping Study is based on the material assumptions outlined in the Scoping Study Announcement. These include assumptions about the availability of funding. While the company considers all of the material
assumptions to be based on reasonable grounds, there is no certainty that they will prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved.
22
Disclaimer
To achieve the range of outcomes indicated in the Scoping Study, additional funding will be required. The company has a supportive shareholder base and has successfully raised capital to progress the project in the past.
However, investors should note that there is no certainty that the company will be able to raise the amount of funding required to develop the project when needed. It is also possible that such funding may only be available
on terms that may be dilutive or otherwise affect the value of the company’s existing shares. It is also possible that the company could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of
the Lindfield Vanadium project. If it does, this could materially reduce the company’s proportionate ownership of the project.
The Scoping Study results contained in this presentation relate solely to the Lindfield Vanadium project and do not include Exploration Targets or Mineral Resources defined elsewhere. The company has concluded it has a
reasonable basis for providing the forward-looking statements included in this presentation.
Given the uncertainties involved, investors should not make any investment decisions based solely on the results of the Scoping Study.
Forward Looking Statements
This presentation contains ‘forward-looking statements’ that are based on the company’s expectations, estimates and projections as of the date on which the statements were made. These forward-looking statements may
include, among other things, statements with respect to prefeasibility and definitive feasibility studies, the company’s business strategy, plans, development, objectives, performance, outlook, growth, cash flow, projections,
targets and expectations, mineral reserves and resources, results of exploration and related expenses. Generally, this forward-looking information can be identified by the use of forward-looking terminology such as
‘outlook’, ‘anticipate’, ‘project’, ‘target’, ‘potential’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’ and similar expressions. Persons reading this
presentation are cautioned that such statements are only predictions, and that the company’s actual future results or performance may be materially different. Forward-looking statements are subject to known and
unknown risks, uncertainties and other factors that may cause the company’s actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking
information. Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein. The forward-looking statements included in this presentation speak only as of
the date of this presentation. Except where required by law or the ASX Listing Rules, the company does not intend to update or revise the forward-looking statements in this presentation in the future.
Limited Responsibility for Information
CMG makes no representation about the likelihood of a matter, about which a forward looking statement is made, occurring. CMG and its directors, employees, agents, advisers and consultants give no representation or
warranty to a recipient of this presentation as to the accuracy or completeness of the statements contained in this presentation or in relation to any other matter; and to the full extent permitted by law, disclaim
responsibility for and have no liability to a recipient of this presentation for any error or omission in or for any statement in this presentation.
Competent Person Statements
The information in this presentation that relates to metallurgy and metallurgical test work is based on, and fairly represents, information compiled by Adrian Buck, a Competent Person, who is a Member of the Australasian
Institute of Mining and Metallurgy (AusIMM). Adrian Buck is the Principal Geologist – Australia for John T Boyd Company. Adrian Buck has sufficient experience with the style of processing response and type of deposit under
consideration, and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore
Reserves’. Adrian Buck consents to the inclusion of the matters based on their information in the form and context in which it appears. The information in this announcement that relates to the exploration results,
exploration targets and mineral resources for the Company’s Lindfield Vanadium Project was first reported by the Company in the Company’s prospectus dated 25 May 2022 and ASX announcements dated 22 February 2023,
13 March 2023 and 16 May 2023. The Company confirms that it is not aware of any new information or data that materially affects the exploration results, exploration targets and mineral resources, and that all material
assumptions and technical parameters underpinning these continue to apply and have not materially changed. Where the Company refers to exploration results or mineral resources in this announcement (referencing
previous releases made to the ASX), it confirms that it is not aware of any new information or data that materially affects the information included in that announcement and all material assumptions and technical
parameters underpinning the exploration results or mineral resources estimate in that announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the
Competent Persons findings are presented have not materially changed from the original announcement.
33
Investment Highlights
World Class Asset
World class vanadium asset with upside in
resource and additional mineral value – HPA, other
valuable by-products.
Government Support
Federal and State governments supporting CMG and
adjacent companies as key participants in Target Net
Zero by 2050
Significant Upside
Solid Investor Group
Significant upside opportunity in the mid stream
Vanadium Electrolyte manufacturing for Vanadium
batteries which is currently being investigated.
Significant institutional ownership and tightly held
register across founders and directors.
Experienced Board &
Management
Vast Opportunity
Technical, construction and operations
supported by complementing board skills,
motivated to drive strategy
Additional tenements providing short term
financial gain with longer term upside potential
4
Supporting Global Communities through an Energy Transition
Fed & QLD Govt priority for Critical Mineral Zones (Inc. Vanadium) 3
Global pressure drives renewable energy age
•
•
Renewable Energy Targets (Global, Australia, QLD) 100% by 20501
2
QLD renewable energy target 70% by 2032 and 80% 2035 .
Battery Storage converts renewable energy to BASE load
•
$100m industry grant pool for battery technology
•
Further $75m towards Critical Minerals Zones in QLD
CMG developing high purity vanadium electrolyte for battery
•
Vanadium batteries - scalable, long life, low cost, long duration storage
•
Lindfield Vanadium Project intended to support QLD’s energy needs
•
Vanadium batteries – grid energy storage and stability
•
JORC 254 mt Indicated, ideal location, on development pathway
Vanadium in short supply – need security of supply chain
Partner to grow, deliver energy storage to the global market
•
92% of vanadium currently consumed in steel manufacture
•
IDEMITSU major shareholder
•
CMG intends to contribute to the security of supply of high purity
•
Board and development team to deliver strategy to manufacture battery
vanadium for batteries
products
Purpose
To support global communities through an energy transition that will deliver a more sustainable and responsible future
Vision
To be a leading high-quality manufacturer of vanadium battery products for the energy storage market and deliver responsible and robust returns.
1 - https://www.iea.org/reports/net-zero-by-2050
2 - https://www.epw.qld.gov.au/about/initiatives/renewable-energy-targets
3 - https://www.resources.qld.gov.au/__data/assets/pdf_file/0005/1726430/critical-minerals-strategy.pdf
5
Successful Scoping Study at Lindfield Vanadium Project1
4 Million Tonnes
The Project has the practical and financial
attributes to potentially develop a successful 4
million tonne per annum ROM vanadium mine.
$400m Capital Cost
Estimated direct capital costs (excluding
indirect costs, EPCM, owners’ costs and
contingency).
$510m NPV
Assuming USD$9.50 / lb 98.5% V₂O₅, USD$57.5 /
kg 99% MoO3 , FX of $0.68 and Royalty Rate
2.5%).
Long Mine Life
With the opportunity to expand LOM
with potential upside in Resource
subject to further evaluation.
Additional HPA
17% IRR
Has also been confirmed as a potential product
providing future upside for the project subject
to further evaluation and modelling.
Potential after-tax IRR of approximately
17%, from the vanadium pentoxide and
molybdenum trioxide products streams.
1 - Refer ASX Release – “Revised Release of Scoping Study Results” - 9 November 2023
6
Harnessing High-Grade, Low Strip
Ratio, Long-Life Vanadium Assets to
assist in Queensland’s commitment to
a Sustainable Future
The Lindfield Vanadium Project, QLD
7
The Lindfield Vanadium Project
Vanadium and High-Purity Alumina (HPA)
Large Scale Resource1
Regulatory
Lindfield Indicated Resources of 363 Mt @0.43%
V2O5, includes indicated Resource of 254 Mt @ 0.44%
V2O5 in oxidised zone which is showing good
recoveries. Large-scale operational opportunity.
State and federal governments engaged in Approvals
pathways
Vanadium Electrolyte for Batteries
HPA Secondary Product
Potential for HPA production as part of the
vanadium processing operations.
Used for Lithium battery separator, LED’s,
Sapphire glass.
Ideal Location
Located in rich vanadium mineral zone, close to
infrastructure, services, and other advanced mines
Located close to Julia Creek, main highway and
rail, power and water.
PROJECT
HIGHLIGHTS
Strategy is to manufacture electrolyte for
vanadium batteries and processing results to
date indicate we are on the pathway to
electrolyte production.
Positive Scoping Study2
Scoping Study results announced on 9 November 2023
indicate that the Lindfield Vanadium Project has both the
practical and financial attributes to develop a successful 4
million tonne per annum ROM vanadium mine producing
vanadium pentoxide.
1 - Refer ASX Release – “Resource Upgrade” –16 May 2023
2 - Refer ASX Release – “Revised Release of Scoping Study Results” - 9 November 2023
VTM deposits: magmatic deposits of titanomagnetite ((Fe(Fe,Ti)2O4)) enriched in vanadium. These deposits often occur in mafic or ultramafic igneous rocks (gabbro or anorthosite) and are commonly found in Large Igneous Provinces
8
The Lindfield Vanadium Project
Vanadium and High-Purity Alumina (HPA)
Project underpinned by a large resource in a simple, flat-lying orebody that outcrops at surface.
•
Mineral Resource Estimate (MRE) - 363 Mt @ 0.43% V205 and 4.8% AI2O3. Includes 254 Mt @ 0.44% Resource
and 128 Mt @ 0.48% V205 in the oxidised zone.1
•
Vanadium and High Purity Alumina (HPA) Products - Aluminium Oxide (Al₂O₃) is included in the MRE, with HPA
as a potential project of the mineral processing stream.
•
Excellent Geological Characteristics - Advantages in beneficiation allow for higher V205 concentration upgrade
through flotation and leaching separation.
•
Straightforward and Low-Cost Mining - Vanadium and HPA are found in the oxidised zone, with low strip ratios
and suiting lower cost open-cut mining operations – a significant OPEX advantage over mining hard rock
orebodies.
•
Limited Contaminants for batteries – resulting in improved and lower cost process refinement.
Large tenement package (~295 km2) located in
Queensland’s North West Mineral Province
1 - Refer ASX Release – “Resource Upgrade” – 16 May 2023
9
Forging Global Energy Transitions for
Queensland's Premier Vanadium Supply Chain
Future
Vanadium Market Overview
10
Government investment in the Path to Net Zero 2050
CMG is seeking to leverage the significant grants and incentives put in place to develop domestic production of vanadium,
particularly for use in Vanadium Batteries as a grid-scale energy solution
National Battery Testing
Centre (NBTC)
Vanadium Demonstration Plant
$10m Fully funded (QLD Gov) to build
plant in Townsville
$50m project and $15m funded (QLD Gov).
NBTC will look at Vanadium flow battery
development & standards.
CopperString 2.0 Transmission Line
$1.7bn project to run from a substation
on the Ross to Strathmore transmission line
located south of Townsville to a substation near
Cloncurry and then onwards to Mount Isa.
Vanadium Processing Pilot Plant
$1.265m grant (Federal Gov) to
Brisbane Met Labs
Battery Manufacturing
Queensland
$100m Federal government commitment to
develop battery manufacturing in QLD
11
Vanadium Batteries – Proven technology powering cities
Vanadium batteries powering cities around the world TODAY
Why are they favoured?
•
Safe and non-flammable
•
Vanadium electrolyte is 100% recyclable and reusable
•
30 year plus lifespan with complete discharge and no deterioration
•
Scale-able with unlimited capacity
•
Medium to long term storage 3-10 hours with rapid response (milisecs)
Bungama, port Pirie, South Australia 2MW/ 8MWh Vanadium Flow battery
Trial project for Energex in Queensland using a Sumitomo Electric
Industries vanadium battery 250 kW / 750kWh
Worlds largest Vanadium battery Dalian Province China, 100MW/
400MWh and enough power to meet demand from 200,000 residents
12
Vanadium Batteries
Renewable intermittent unstable
energy that needs Battery storage
to stabilise
Vanadium batteries become the new base load
energy powering cities
•
Renewable energy (Solar, wind) is erratic and intermittent
and NEEDS stable energy storage…..Vanadium Batteries
provide that stability.
•
Vanadium Batteries provide
•
•
Base Load power - balance supply demand
•
Grid stability – ensure quality/ reliability power
•
Store renewable energy – support peak loads
•
Back up power supply – emergency power
Queensland has a vast and economic source of vandium and a
new secure, safe and accessible supply chains to provide
vanadium electrolyte for vanadium batteries.
13
Meeting the Growing Demand
for Minerals to Ensure a
Carbon Neutral Future.
Our ESG Vision
14
ESG Focus
CMG Environmental, Social and Governance Policy is centred
around four key principles
01
Community and People
•
•
Local community
Traditional Owners
development/ education.
• Community development – Traditional
• Housing and social development
Mineral Traceability
Ethical values
Trust
Stakeholder Respect
and Engagement
03
• Ownership diversity
• Employment diversity
• HR development and diversity
• Inclusive supplier procurement and
owners
02
Ethics and Accountability
•
•
•
Ethics,
Accountability,
Community and
People
•
•
Supply chain
Chain of custody
04
Environmental Management
•
•
•
Resource Optimisation and
Site rehabilitation
Water Management
Energy Efficiency
Environmental
Management –
Energy Efficiency
• Solar farm for internal power usage
• Large scale Vanadium battery storage to
support activities at site
• Link to supporting Julia Creek region on a
broader / larger scale
• Supply chain involvement and security
15
Milestones Achieved to Date
Newsflow Catalysts
Q1 2023
• Commencement of metallurgical testwork
2024 Targets
• Commencement of Pilot Plant processing work
Q2 2023
• Commencement of scoping study
•
Targeting a JORC Resource upgrade with the inclusion of TLB-A
seam
Q3 2023
• Complete initial metallurgical testwork
•
Commencement of environmental study works
•
Vanadium Electrolyte manufacturing strategy
•
Exploring potential collaboration and partnership agreements on
development infrastructure
•
Commencement of feasibility study
In Advancing Towards Production
•
•
Complete scoping study
Drilling – bulk sample collection
Q4 2023
•
Pilot Plant preparatory test work and planning
•
Approvals Strategy
•
Feasibility Study review
•
Technology license with Lava Blue
•
Scoping Study results
•
Reviewing partners for next phase of feasibility study
Strong Developments Going Forward
16
Board of Directors
Alan Broome. AM
Chairman
§
§
§
§
§
§
Extensive Mining & Board
experience
Emeritus Chairman of
Austmine
Chairman of Strategic
Minerals Plc (AIM:SML.L)
Advisory Council to the
CSIRO's Mineral Resources
Sector
Chairman of New Age
Exploration (ASX:NAE)
Awarded the Order of
Australia (AM) for services to
mining
Scott Winter
Art Malone
Steve Kovac
Stuart McClure
Managing Director
Non-Exec Director
Non-Exec Director
Non-Exec Director
§
§
§
30 years of experience
working across large scall
projects in the resource
sector.
Bachelor of Engineering Mining (Honours), a Graduate
Diploma Applied Finance and
an MBA from Melbourne
Business School.
Previous roles include Chief
operation officer for Mineral
Resources Ltd (ASX:MIN)
§
§
§
§
Senior Energy and Resources
Executive.
15 years managing large scale
projects in the resource
sector.
Managing Director of Peak
Helium.
Managing Director of
Graphinex
§
§
§
§
§
§
CEO of Idemitsu Australia
NED of Vecco Group
NED of Delta Lithium
Director at Low Emission
Technology Australia (LETA)
More then 20 years of Mining
and Executive experience
MBA & GAICD
§
§
§
§
§
§
Senior finance executive with
17 years experience.
Corporate adviser to public
and unlisted companies.
CEO Vested Equities
Executive Chairman of
CopperX Ltd an unlisted
Copper exploration project
Executive Chairman Charged
Minerals
Bachelor of Business and
AICD fellow.
17
ASX:CMG
ASX
CMG
Total Shares on Issue
44.08m
Options (@ $0.25) exp. 19 September 2024
8.36m
Cash (as at 30 September 2023)
$1.8m
Market Cap (undiluted)
$9.9m
Share Price (as at close 14 November 2023)
$0.225
Empowering a Sustainable Future: Pioneering
High-Quality Vanadium for the Battery Storage
Revolution.
18
18
Contact
Scott Winter
Managing Director
info@criticalmineralsgroup.com.au
+61 (0) 7 5555 5077
Jane Morgan
Investor & Media Relations
jm@janemorganmanagement.com.au
+61 405 555 618
19
JORC CODE, EDITION 2012 – TABLE 1. CHECKLIST OF ASSESSMENT & REPORTING CRITERIA
Criteria
Sampling techniques
•
•
•
•
Drilling techniques
•
JORC Code Explanation
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or
systems used.
Aspects of the determination of mineralisation that are Material to the Public Report.
In cases where ‘industry standard’ work has been done this would be relatively simple (eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases, more explanation may
be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed information.
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what
method, etc).
Commentary
•
•
•
•
•
•
•
Drill sample recovery
•
•
•
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the samples.
Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
•
•
•
•
•
Logging
•
•
•
Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral
Resource estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
•
•
•
•
•
•
•
November 2022 exploration samples have been taken from diamond core drilling only.
Recovery of core is recorded in the drill hole lithological logs which are recorded by
suitably qualified geologists present at the time of drilling.
Geophysical logs were used to correct the recorded depths of Toolebuc Formation
roof and floor intersections.
November 2022 drilling has been either open hole, partly diamond cored or fully
diamond cored.
Surface soil and soft ground was cased with 6-inch PVC casing, typically to a depth of
6 m.
Diamond core intervals were drilled by conventional drilling method, typically over
4.5 m length runs.
Core size has been 4C (100 mm), to provide ample material for metallurgical test
work.
Holes were drilled vertically; verticality logs were runs to confirm deviation.
November 2022 drill chips and core were assessed, logged and photographed on site
by suitably qualified geologists.
Linear recovery was recorded for each core run, comparing length of core recovered
versus drill depth.
Core recoveries were generally better than 95% however core recoveries
approximately 75% have been recorded in some softer weathered mineralized zones.
Core required for analysis was sampled at the core storage facility from core storage
boxes, after longitudinal core cutting.
There is no known relationship between sample recovery and the assay results
received from the laboratory.
November 2022 core and chip samples have been logged in detail that supports
estimation of mineral resources.
Geological logging was completed to the CoalLog – Australian Coal Logging Standard,
as developed by Australian Coal Association Research Program (ACARP) and adopted
by Australasian Institute of Mining and Metallurgy (AusIMM). The logging system is
well suited to stratified sedimentary deposits.
Logging has been quantitative for recording depth.
Geologist’s visual interpretation of geological characteristics and grain size has been
used to differentiate rock types.
Qualitative records include percentages of lithologies where interbedded intervals
have been encountered, degree of weathering and rock strength.
A digital photographic record is maintained for drill core and chip samples.
Geological logging data is stored in an Isis Vulcan database.
20
JORC TABLE 1 - Continued
Criteria
Sub-sampling techniques
and sample preparation
JORC Code Explanation
•
•
•
•
•
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Commentary
•
November 2022 samples were taken across the entire Toolebuc Formation interval to characterise mineralisation for the complete
formation. Roof and floor samples were also routinely taken for characterisation of dilution materials.
•
Core required for laboratory analysis was sampled at the core storage facility from core storage boxes, after longitudinal core cutting.
Full sections (continuous and contiguous) of the quarter core diameter of each sample were taken.
Core sample intervals were selected as either in smaller increments that represent ply boundaries or lithological units.
Sample preparation was carried out by Mitra PTS Pty Ltd (Mitra) laboratories in Gladstone, using Australian Standards laboratory
procedures. Mitra Gladstone is accredited by the National Association of Testing Authorities (NATA; NATA corporate accreditation No:
14525, corporate site No: 14569.
Once the core boxes were received by Mitra, cores were longitudinal cut, then ¼ core sampled by laboratory technicians under
•
•
•
direction by the Project geologist. Samples were weighted and entered into a sample tracking system. Samples were then dried and
crushed to ensure that 70% of the sample is below 6 mm, then a 250 g split riffled off with the remained stored as reserve. The 250 g
splits were then milled to 75 µm. Pulp samples were split for each of the different analytical methods, with the pulp reject retained and
stored.
Quality of assay data and
laboratory tests
•
•
•
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Nature of quality