Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
criticalmineralsgroup.com.au
(+61) 731 323 504
Level 15, 100 Edward St, Brisbane QLD 4000, Australia
info@criticalmineralsgroup.com.au
ASX Announcement
ASX: CMG
30 January 2026
Quarterly Activities Report & Appendix 5B for the period ending
31 December 2025
KEY HIGHLIGHTS
Downstream: Battery Energy Storage Solutions
CMG and Accenture have signed a Teaming Agreement (TA) to collaborate on the feasibility
assessment of a pipeline of potential VFB projects that would support the development of
CMG’s integrated Vanadium battery supply chain. Accenture bring global leadership in digital,
engineering, and supply chain transformation.
CMG express interest in supporting the development of the Kalgoorlie Vanadium battery.
Engaged with the SA FERM energy storage Tender to further inform capital and technical
specification for a NEM grid connect VFB BESS.
CMG continues to see opportunities arise in the Commercial & Industrial sector for VFB’s
Midstream: Vanadium Electrolyte Manufacturing Facility Development
Planning and feasibility study underway for larger Vanadium electrolyte manufacturing facility.
Development Approval received for Logan Crestmead 1M litre pa VE facility
Upstream: Julia Creek Mine Development
Metallurgical test work continues for both acid and alkali processing options, targeting
reduction in reagent consumption and improved water recycle/re-use.
Significant effort has gone into flowsheet development around water management and
environmental impact, resulting in positive outcomes around total demand and waste
minimisation.
Corporate
Capital raise $2mil placement successfully raised in November 25
Successful AGM held on 24 November all resolutions passed
Considerable and material engagement with several jurisdictions – UK Govt, US Govt, OMAN
Govt, SA Govt, NSW Govt associated with Long Duration Energy Storage supply chain delivery
and/or joint venture and funding.
criticalmineralsgroup.com.au
Critical Minerals Group Limited (ASX:CMG), (Critical Minerals Group, CMG, or the Company) is pleased
to provide shareholders with the following update in relation to the Company’s activities for the quarter
ended 31 December 2025 (Quarter).
COMPANY ACTIVITIES
Downstream: Vanadium battery energy solutions
CMG continues to advance its downstream Vanadium flow battery (VFB) strategy, with a focus on
enabling the assessment, delivery and operation of long-duration energy storage solutions. During the
quarter, CMG engaged with the South Australian Firm Energy Reliability Mechanism (SA FERM) tender
process to inform key technical, commercial and cost parameters for a NEM-compliant VFB system,
including power conversion systems, capital and operating costs, and a defined technical stack. The
tender was also instrumental in defining market expectations regarding property development,
contract framework, and BESS scale. This work is supporting the development of a scalable VFB product
offering and associated commercial models.
CMG progressed market development activities with potential customers and counterparties, including
inbound enquiries from renewable generators and engagement across targeted utility, industrial and
grid-scale storage opportunities. The Kalgoorlie Vanadium Flow Battery development announced by
the WA state government earlier this year is an example of a project CMG is targeting with partners.
The Company also participated in regulatory, policy and funding discussions relating to long-duration
storage and critical minerals, including engagement with state and federal agencies, funding bodies
and international stakeholders to support future deployment pathways.
Supply chain development remains a priority, with a Teaming Agreement (TA) executed with Accenture.
The TA is to collaborate on the feasibility assessment of a pipeline of potential Australian VFB projects
that would support the development of CMG’s integrated Vanadium battery supply chain. The
collaboration underpins the potential advancement of long duration energy storage (LDES) solutions,
including Vanadium flow batteries (VFBs), supporting Australia’s renewable energy transition.
CMG continue its engagement with VFB OEMs, EPC partners and technology providers to secure
capability, capacity and strategic relationships required for downstream VFB deployment.
criticalmineralsgroup.com.au
Figure 1 . Example VFB installation (Yadlamalka Invinity 8 MWhr VFB )
Mid-stream: Vanadium Electrolyte (VE) Facility Development
The Development Approval (DA) amendment to account for 24/7 operations has been approved by the
Logan Council which now paves the way for the development of the 1 million litre per annum Vanadium
Electrolyte (VE) production facility. 120kg of Vanadium Pentoxide has been delivered to Queensland
University of Technology (QUT) for Vanadium Electrolyte demonstration production and qualification
purposes. This will be used to pre-qualify CMG’s VE for a range of existing VFB suppliers.
As indicated last quarter CMG have been assessing the market and options to increase the capacity of
the VE manufacturing facility to a larger facility. This would significantly decrease the overall cost of
production and price for the sale of the VE. CMG will include the VE plant in the Pre Feasibility Study that
is currently under development, along with the Lindfield mine and processing facility. The facilities are
being aligned in size and output so that the VE facility consumes the entire production of V2O5 from the
mine. Information received to date indicates a significantly improved capital efficiency by constructing
a larger facility and an improved overall financial return. To accompany this study CMG has sought
and secured pricing and supply of V2O5 to support the manufacture of VE once construction is
complete. The PFS will include a location study that will evaluate the final location of the VE plant.
criticalmineralsgroup.com.au
Figure 2. – Indicative VE plant layout.
Upstream: Pre-Feasibility Study and Project Development
CMG have made significant progress towards the completion of the Pre Feasibility Study (PFS). The PFS
will encompass the Lindfield mine and processing infrastructure as well as the Vanadium electrolyte
plant to manufacture Vanadium electrolyte. The inclusion of the Vanadium electrolyte plant is natural
progression given CMG’s strategy to produce V2O5 primarily for the Vanadium flow battery market and
VE is the primary product supplied to battery manufacturers. CMG continued the work required for the
completion of the Pre-Feasibility study and expect completion by the end of March 2026. The areas of
focus remain with the metallurgical test-work, followed by the engineering work associated with the
V2O5 processing facility, VE manufacturing plant and non-process infrastructure at the mine site.
Capital and operating costs are being optimised throughout the process with a final financial model
nearing completion.
CMG are excited to report the completion of an independent power study for the Lindfield project that
identified a hybrid renewable power generation supported by a VFB and back up diesel generators was
the most economical and provided the greatest renewable penetration. The risk surrounding water
availability has decreased with options being provided through access to the GAB and surface
harvesting available near-by.
Metallurgical Test work
Metallurgical testwork was a large focus last quarter with work being performed at both Pilot plant
scale as well as bench scale to refine and optimise certain aspects of the flow sheet. Pilot scale testing
is showing some improvements to bench scale test results which is improving the overall economics.
criticalmineralsgroup.com.au
Figure 3. Pilot scale flotation at Brisbane Metlabs
Flotation testwork on pilot-scale beneficiation product achieved Vanadium improved Vanadium
recoveries, representing an improvement on earlier results. Figure 1 shows pilot scale flotation testwork
underway at Brisbane Metlabs. The focus now is on optimising the balance between target mineral
recovery and waste (particularly calcite) rejection to give the most economic downstream
performance.
Alkaline leaching has also been evaluated as one potential solution to the challenges around future
acid supply in the northwest minerals province. Roasting prior to alkaline leaching showed promising
response, with resin-in-leach enhancing Vanadium recovery, indicating potential preg-robbing effects.
Follow-up test-work is planned in parallel to ongoing acid leach optimisation to refine mass balance
and resin handling.
Metallurgical testwork continues to focus on optimisation of the leach parameters and flotation
flowsheet. CMG are also evaluating options throughout the flowsheet to reduce water consumption and
potential environmental impacts.
The next quarter will see a focus on obtaining filtration, thickening and tailings information to assist with
the PSF level engineering work. Additional testwork will also be carried out in leaching, solvent
extraction, AMV precipitation and ion exchange.
Development and Environmental Studies and Approvals/Permits
CMG commenced activity in two areas with the first being the wet season water studies and the second
being the assaying of soil samples that will be supportive for geotechnical evaluations in the PFS work
currently underway.
criticalmineralsgroup.com.au
CMG continue to compile the environmental impact statement for the Lindfield Project based on the
field studies we have conducted to date, publicly available information and specific reports generated
from the Critical Minerals Office for the Julia Creek region. This is being done ahead of receipt of our
Terms of Reference (TOR) on the assumption that our project impacts will be similar to other potential
projects in the area. The final report will be tailored to the actual TOR once they are received. CMG have
engaged with multiple government departments such as DNRMMRRD (Dept of Natural Resources and
Mines, Manufacturing and Regional and Rural Development), the DLGWV (Dept of Local Government,
Water and Volunteers) and DETSI (Dept of Environment, Tourism, Science and Innovation) on the project
to determine the most optimal approach to progress the approvals for Lindfield.
PROJECTS AND EXPLORATION UPDATE
During the Quarter, CMG continued to make progress across its Vanadium projects and tenements.
CMG is also participating in an EOI for tenements recently made available adjacent to Lindfield
EPM27872. Below is the current map showing CMG’s current Vanadium tenements.
Image 2: Location of CMG Limited Vanadium tenements in the Julia Creek area
Lindfield Project (EPM 27872)
The Lindfield Project is CMG’s flagship project located 30km east of Julia Creek in North-West
Queensland. The Lindfield Project consists of 92 sub-blocks, covering 295km2
. An update on this project
is outlined below:
Progression of Pilot Plant Test work
Please see the separate section above for the relevant update.
Specific Environmental (EIS) Studies Conducted to Advance Approvals
Please see update above
Upcoming Works Program
criticalmineralsgroup.com.au
During the upcoming March Quarter, the Company plans to carry out the following work for the Lindfield
Project:
Completion of V2O5 and Molybdenum metallurgy testing work through to final product. A focus
on reagent consumption optimisation, water recovery and opportunities for footprint
optimisation are a part of this work.
Completion of the PFS report
Development of recommendations for the FS.
Continue wet season environmental study analysis.
Continue preliminary work on the EIS in anticipation of receipt of the actual terms of reference
Engagement with DETSI regarding approvals next steps.
Lara Downs Project (EPM 28635) and Lindfield North Project (EPM 28636)
The Lara Downs and Lindfield North Project are both located within 70km (north) of Julia Creek, with the
Lindfield North Project adjoining the existing Lindfield Project and the Lara Downs Project within 35km of
the Lindfield Project.
Lindfield North consists of 36 sub-blocks covering 115 km2
. Lara Downs consists of 118 sub-blocks
covering 378km2
.
Exploration plan for Lindfield North and Lara Downs Projects
CMG considers that both the Lindfield North Project and the Lara Downs Project can benefit from the
learnings of, and results from, exploration in the region to date.
There is no further update for these tenements for this Quarter.
Upcoming Works Program
There is no work currently scheduled for these two tenements in the upcoming December Quarter.
Whinmoor Project (EPM 28631)
The Whinmoor Project consists of 100 sub-blocks covering 320 km² and is located 60km north of Julia
Creek.
The Whinmoor Project intends to extend on exploration by previous explorers and known extensions to
Vanadium mineralisation in the Company’s Lindfield Project.
There is no further update for this tenement for this Quarter.
Upcoming Works Program
A drilling plan has been developed for exploration of the Whinmoor tenement, however timing is yet to
be confirmed. There is no work scheduled for this tenement in the March 26 Quarter.
criticalmineralsgroup.com.au
Figtree Creek Project (EPM 27998) and Lorena Surrounds Project (EPM 27999)
No substantive exploration activities or fieldwork had been undertaken on the Tenements for this
Quarter. The Company will continue to assess commercial options going forward.
criticalmineralsgroup.com.au
ASX ANNOUNCEMENT DURING THE QUARTER
This quarterly report contains information released to ASX, which has been reported in accordance with
the JORC Code (where required). These announcements can be found on the Company’s website at
criticalmineralsgroup.com.au/investor
2 October 2025 Lindfield Vanadium Project Power Supply Study Completed
7 October 2025 2025 ESG Report
24 October 2025 Notice of Annual General Meeting/ Proxy Form
30 October 2025 Quarterly Activities/Appendix 5B Cashflow Report
7 November 2025 Trading Halt
11 November 2025 $2M Capital Raise to Accelerate
11 November 2025 Proposed issue of securities – CMG
17 November 2025 Application of quotation of securities – CMG
17 November 2025 Cleansing Notice
19 November 2025 Proposed issue of securities – CMG
19 November 2025 Change in substantial holding – Idemitsu
19 November 2025 Ceasing to be a substantial shareholder
24 November 2025 Results of Meeting
2 December 2025 Teaming Agreement signed with Accenture
5 December 2025 Notification – General Meeting Date
5 December 2025 Change in substantial holding
FINANCIAL COMMENTARY
The Quarterly Cashflow Report (Appendix 5B) for the Quarter provides an overview of the Company’s
financial activities.
Exploration expenditure for the Quarter was $271,970, while corporate and other expenditures totalled
$775,068 (including $321,421 in salaries and director fees).
In accordance with the Company’s disclosure obligations under ASX listings rule 5.3.5, the total amount
paid to directors and their associates in the Quarter (item 6.1 of the Appendix 5B) was $82,500 and
included the Managing Director’s salary.
criticalmineralsgroup.com.au
Forward-Looking Statements
This announcement may include forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning planned exploration program and other statements that are
not historical facts. When used in this document, the words such as “could”, “plan”, “estimate”, “expect”,
“intend”, “may”, “potential”, “should” and similar expressions are forward-looking statements. Although
the Company believes that its expectations reflected in these forward-looking statements are
reasonable, such statements involve risks and uncertainties and no assurance can be given that actual
results will be consistent with these forward-looking statements.
This announcement was approved by the board of directors of CMG.
For more information contact:
Scott Winter
CEO and Managing Director
info@criticalmineralsgroup.com.au
(07)3132 3504
criticalmineralsgroup.com.au
Schedule 1 – Tenement Schedule as at 31 December 2025
Project
Name
Location Tenement Status
Equity at 30
September
2025
Equity at 31
December
2025
Changes
during
Quarter
Lindfield
Project
Julia Creek EPM 27872 Granted 100% 100% -
Figtree
Creek
Project
Cloncurry EPM 27998 Granted 100% 100% -
Lorena
Surrounds
Project
Cloncurry EPM 27999 Granted 100% 100% -
Whinmoor
Project
Julia Creek EPM 28631 Granted 100% 100% -
Lara Downs
Project
Julia Creek
EPM 28635
Granted 100% 100% -
Lindfield
North
Project
Julia Creek
EPM 28636
Granted 100% 100% -
Rule 5.5
ABN
Current quarter
Year to date
(6 months)
$A’000 $A’000
1 Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration and evaluation - - 3
(b) development
(c) production
(d) staff costs - 321 - 715
(e) administration and corporate costs - 456 - 1,007
1.3 Dividends received (see note 3)
1.4 Interest received 1 10
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives - 900
1.8 Other (provide details if material) 7
Current quarter
Year to date
(6 months)
$A’000 $A’000
2 Cash flows related to investing activities or for:
2.1 Payment to acquire
(a) entities
(b) tenements
(c) property plant and equipment - 30 - 30
(d) exploration & evaluation - 271 - 575
(e) investments
(f) other non-current assets
Quarter ended (“current quarter”)
91 652 994 726 Dec-25
Appendix 5B
Name of entity
Critical Minerals Group Limited
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Consolidated statement of cash flows
1.9 Net cash from/(used in ) operating activities - 776 - 808
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cashflow report
Current quarter
Year to date
(6 months)
$A’000 $A’000
2.2 Proceeds from disposal of:
(a) entities
(b) tenements
(c) property plant and equipment
(d) investments
(e) other non-current assets
2.3 Cashflows from loans to other entities
2.4 Dividends received
2.5 Other (provide details if material)
Net cash from/(used in) investing activities - 301 - 605
3 Cash flows related to financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
2,000 2,000
3.2 Proceeds from issues of convertible debt securities
3.3 Proceeds from exercise of options
3.4
Transaction costs related to issues of equity securities or convertible
debt securities
- 125 - 125
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from/(used in) financing activities 1,875 1,875
4
Net increase (decrease) in cash and cash equivalents for the period
4.1 Cash and cash equivalents at beginning of period 924.0 1,260.0
4.2 Net cash from/(used in) operating activities (Item 1.9 above) - 776.0 - 808.0
4.3 Net cash from/(used in) investing activities (Item 2.6 above) - 301.0 - 605.0
4.4 Net cash from/(used in) financing activities (Item 3.10 above) 1,875.0 1,875.0
Current quarter
Year to date
(6 months)
$A’000 $A’000
4.5 Effect of movement in exchange rate on cash held
4.6 Cash and cash equivalents at end of the quarter 1,722 1,722
Consolidated statement of cash flows
2.6
Consolidated statement of cash flows
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cashflow report
5 Reconciliation of cash and cash equivalents Current quarter
Previous quarter
at the end of the quarter (as shown in the consolidated statement of cash
flows) to the related items in the accounts
$A’000 $A’000
5.1 Bank balances 1,722 924
5.2 Call deposits
5.3 Bank overdrafts
5.4 Other (provide details)
5.5
Cash and cash equivalents at end of quarter (should equal item 4.6
above)
1,722 924
6 Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associated included in item 1.2
83
6.2
Aggregate amount of payments to related parties and their
associates included in item 2.3
6.3
Aggregate amount of payments to related parties and their
associates included in item 3.4
7 Financing facilities
NOTE: The term "facility" included all forms of financing arrangements
available to the entity
Add notes as necessary for an understanding of the sources of finance
available to the entity.
Total facility amount
at quarter end
Amount drawn at
quarter end
$A’000 $A’000
7.1 Loan facilities
7.4 Total financing facilities
7.5 Unused financing facilities available at the quarter end
7.6
Include below a description of each facility above, including the lender, interest rate, maturity
date and whether it is secured or unsecured. If any additional facilities have been entered
into or are proposed to be entered into after quarter end, include details of those facilities as
well.
Note: if any amounts are shown in 6.1, 6.2 or 6.3 your quarterly report must a description and an
explanation for, such payments
Payments of salary Director and Director Fees.
7.3
Payments to related parties of the entity and their associates
Other (please specify)
7.2 Credit standby arrangements
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cashflow report
8
Estimated cash available for future operating
activities
$A'000
8.1 Net cash from / (used in ) operating activities (Item 1.9) - 776
8.2
Payment s for exploration & evaluation classified as investing
activities) (item 2.1(d))
- 271
8.3 Total relevant outgoings (Item 8.1 + Item 8.2) - 1,047
8.4 Cash and equivalents at quarter end (item 4.6) 1,722
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funds (Item 8.4 + Item 8.5) 1,722
8.7
Estimated quarters of funding available (Item 8.6 divided by Item
8.3)
1.6
8.8
8.8.1 Does the entity expect that it will continue to have the current level of net operating cash flow for the
time being and if not why not ?
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its
operation and , if so, what are those steps and how likely does it believe that they will be successful?
8.8.3 Does the entity expect to be able to continue its operations and to meet its business objectives and , if so ,
on what basis?
Note: if the entity has reported positive net operating cashflows in item 8.3 answer item 8.7 as "N/A. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.7
If Item 8.7 is less than 2 quarters, please provide answers to the following questions:
Answer:
Yes. The Company's expenditure will continue to track its near term objectives that include the development of the
Lindfield Project and the establishment of the Vanadium electrolyte business and manufacturing facility and
pursuing opportunities for Vanadium Flow Battery installations.
Answer:
Yes. The Company has been able to raise capital as required to fund its business as most recently demonstrated
with the successful Placement in November 2025. The Company will continue to explore funding options to
support the Company's requirements.
Yes. Based on its history of successful capital raising and the ongoing support of major shareholders, and potential
investors and the continued execution of its development objectives.
Note: where item 8.7 is less than 2 quarters, all questions 8.8.1, 8.8.2 and 8.8.3 above must be answered
Answer:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cashflow report
1
2
Date: 30-Jan-26
Authorised by: The Board
Notes
1
2
3
4
5
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has
been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of board
committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee, you
can insert here: “By the Disclosure Committee”.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives
a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk
management and internal control which is operating effectively.
This statement does give a true and fair view of the matters disclosed.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s
activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes
to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and
provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to
this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX
pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity
This statement has been prepared in accordance with accounting standards and policies which comply
with Listing Rule 19.11A.
Compliance statement
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 5