ASX Announcement
ASX: CMG
30 October 2025
Quarterly Activities Report & Appendix 5B for the period ending
30 September 2025
KEY HIGHLIGHTS
Downstream: Battery Energy Storage Solutions
• CMG team travelled to Japan, Scotland, and China to further supply agreements with VFB
suppliers as well as tour VFB manufacturing facilities. Facilities included: Sumitomo, Invinity,
Rongke, Enerflow and VRB.
• Site tours of large scale VFB Installations: Yadlamalka 2 MW/ 8MWhr in South Australia, and
Dalian 100MW/ 400MWhr in China.
• Expression of Interest (EOI) submitted to a major Australian generator/ retailer (Gentailer) for
deployment of Vanadium Flow Battery (VFB) technology at a major new renewable energy
precinct in Victoria.
Midstream: Vanadium Electrolyte Manufacturing Facility Development
• Virtual tour of CMG’s Vanadium Electrolyte Facility with Woodridge MP, Cameron Dick, and
Logan MP, Linus Power, as well as fellow Logan business, Pan Pacific Recycling.
• Planning and feasibility study underway for larger vanadium electrolyte manufacturing facility.
Upstream: Julia Creek Mine Development
• Completed Feasibility Study for mine site power which shows hybrid renewables combined with
VFB design is lowest cost and highest renewable penetration.
• All studies are progressing well
• Metallurgical test work continues for both acid and alkali streams. Targeting reduction in
reagent consumption and water recovery.
Corporate
• Completion and release of FY25 reporting suite including the Annual Report and ESG Report.
• Participation in Queensland Resource Council’s ‘Shape Our Future’ Campaign.
• Participation Queensland Europe and the UK Trade and Investment Strategy 2025-2028.
criticalmineralsgroup.com.au
Critical Minerals Group Limited (ASX:CMG), (Critical Minerals Group, CMG, or the Company) is pleased
to provide shareholders with the following update in relation to the Company’s activities for the quarter
ended 30 September 2025 (Quarter).
COMPANY ACTIVITIES
Downstream: Vanadium battery energy solutions
CMG continue its momentum in delivering BESS solutions for Australian customers as part of the
domestic energy transition.
1. The Energy Market
The current state of the Australian energy market is marked by a rapid transition toward renewable
energy, particularly solar and wind, which is leading to midday oversupply, negative pricing and
frequent curtailment of valuable assets. Despite increasing renewable penetration, grid reliability
remains challenged, especially during evening hours when coal still dominates due to insufficient
alternate firming capacity.
Battery Energy Storage Systems (BESS), especially Long Duration Energy Storage (LDES) technologies
like Vanadium Flow Batteries (VFB), are seen as critical to solving these issues by enabling time-shifting
of renewable energy and reducing reliance on fossil fuels.
The market is now starting to provide appropriate price signals and investment frameworks to support
large-scale deployment of LDES. South Australia’s FERM tender and NSW LTESSA highlights positive
examples, requiring long duration >8hrs, offering long-term contracts and price protections to
encourage investment. We applaud the release of recent tenders requiring >8 hours duration storage
as this is the right policy reform that will enable the domestic supply chain development to ensure
energy security and unlock the full potential of grid-scale storage.
2. Supply chain dynamics
As part of the market to mine strategy CMG has paid particular attention to engaging with the various
stakeholders along the supply chain from V2O5 supply through to VFB and balance of plant suppliers
both in Australia and internationally. Over the last quarter CMG engaged an international procurement
specialist to provide guidance on the availability, cost and supply logistics of key items in the VFB
supply chain. They included V2O5, VE, VFB and inverter supply items. The outcome highlighted that
critical items in the supply chain are available and could support the strategy and timeline CMG is
working toward.
In addition, a team from CMG travelled to Japan, Scotland, China, and South Australia to engage with
several VFB suppliers in each of those countries in order to continue discussions and negotiations. The
trip also provided an opportunity to view firsthand a number of VFB’s installed and in use. They
included:
- the 100MW/400MWhr Rongke VFB located in Dalian China which has been installed and
operating for a number of years and has recently been used for black start capability.
- Rongke robotic stack assembly and VFB assembly factories.
criticalmineralsgroup.com.au
- Sumitomo Gen 4 module and stack and VFB manufacturing facility
- Yadlamalka 2 MW/ 8MWhr Invintiy VFB that has been operating successfully for a number of
years.
- Invinity stack and VFB manufacturing facility in Scotland.
Yadlamalka solar and Invinity vanadium flow battery site (2MW/ 8MWhr)
It is clear from these investigations that VFB technology is widely in use internationally at scale and
supply chains are well established in some regions to support the distribution and operation of VFB’s.
CMG’s opportunity is to establish the supply chain in Australia and then replicate this model
internationally with partners investigating the establishment of their own supply chains. With a large
resource of vanadium pentoxide mineralisation, CMG could not only support the establishment of a
supply chain that produces vanadium electrolyte (the active material in VFB’s) in Australia but can
support the same in other countries wanting to grow the deployment of VFB’s to support their energy
transition. CMG is engaging with potential international partners in the UAE, UK, EU and USA who are
interested in securing vanadium as a critical and strategic mineral and to establish a vanadium
electrolyte manufacturing facility and potential VFB assembly plant.
3. Target Market and clients
CMG continues to work on various potential VFB projects and more recently has been working
alongside a major multinational services company as a partner who brings a capability in battery
storage, large potential customer base, project management capability, technology and balance
sheet. The agreement brings together the two company’s mutually beneficial attributes to enhance the
integration and deployment of VFB’s in Australia.
As part of the pipeline assessment CMG is excited to advise that it has submitted an expression of
Interest (EOI) to a major Australian Gentailer for deployment of Vanadium Flow Battery (VFB)
technology at a major new renewable energy precinct in Victoria and has passed the initial stage gate.
criticalmineralsgroup.com.au
Mid-stream: Vanadium Electrolyte (VE) Facility Development
The Development Approval (DA)amendment to account for 24/7 operations has been approved. 120kg
of Vanadium Pentoxide has been delivered to Queensland University of Technology (QUT) for Vanadium
Electrolyte demonstration production and qualification purposes. This will be used to pre qualify CMG’s
VE for a range of existing VFB suppliers.
Virtual tour of CMG’s Vanadium Electrolyte Facility with Woodridge MP, Cameron Dick and Logan MP,
Linus Power and Pan Pacific Recycling
CMG’s CEO Scott Winter was honoured to host Woodridge MP Cameron Dick, Logan MP Linus Power, and
representatives from local Logan business Pan Pacific Recycling for a virtual tour of CMG’s Vanadium
Electrolyte Manufacturing Facility, currently under development in the City of Logan.
The event provided an opportunity to showcase the progress of this strategically significant project and
highlight its role in advancing Queensland’s renewable energy ambitions. Sedgman Prudentia
presented the detailed facility design using advanced virtual modelling, allowing participants to explore
the completed layout and gain valuable insights into the innovative engineering driving the
development.
The Vanadium Electrolyte Facility represents a critical step in establishing a domestic vanadium supply
chain, supporting the production of Vanadium Flow Batteries (VFBs) and strengthening Australia’s
capability in long-duration energy storage.
CMG extends its appreciation to Mr Dick, Mr Power, and Pan Pacific Recycling for their engagement and
support as we work together to position Queensland at the forefront of the renewable energy transition.
This collaboration underscores CMG’s commitment to delivering innovative, sustainable energy storage
solutions that will play a key role in building a cleaner, more resilient energy future for Australia.
CMG’s submission set out a detailed technical case for VFB deployment at the precinct,
expected to require 10MW+ of storage capacity. The EOI response outlined:
• Technology Readiness: VFB technology is rated at TRL 9 with over 1.2GWh deployed globally,
including the world’s largest VFB in Dalian, China (200MW/1GWh).
• Performance & Reliability: Systems designed for 30+ year lifespans, offering unlimited
cycling with no degradation, and full depth of discharge (100% DoD).
• Safety Advantages: Non-flammable electrolyte ensures no risk of fire or thermal runaway,
improving safety and permitting outcomes compared with lithium-ion.
• Sustainability: More than 99% of system components recyclable, with electrolyte retaining
residual value at end of life.
• Integration & Modularity: Containerised, factory-tested systems enable rapid installation
and flexible scaling of both power and energy.
• Certification & Standards: OEM partners hold IEC, UL, CE, and ISO certifications, with
performance guarantees available for capacity, availability, and efficiency
criticalmineralsgroup.com.au
Upstream: Pre-Feasibility Study and Project Development
CMG Ltd have been working with the University sector on opportunities for fundamental research into
the vanadium deportment in the Toolebuc mineralisation to enhance understanding of the
metallurgical response. CMG are also participants in two Co-operative Research Centre bids which aim
to facilitate the development and installation of batteries for the energy sector and improve the
efficiency of metallurgical processing of various minerals critical for the energy sector.
CMG continue the work required for the completion of the Pre-Feasibility study, with a number of
sections nearing final draft. The areas of focus remain with the metallurgical test-work and in
particular the refinement of both the acid and alkali streams. Particular attention is aimed at reduction
in reagent costs and improvement in water recovery. Coupled with this includes the supporting
engineering design work.
CMG have finalised the study into power for the Lindfield project which highlights the hybrid solution
combining renewable energy generation (solar and or wind) firmed by a vanadium battery proved to
be the most optimal solution and lowest whole of life cost. The vanadium flow battery solution
demonstrated superior long-duration storage benefits delivering the highest penetration of renewable
energy utilisation of the options assessed (up to 75.5%). The diesel only option identified as lowest
upfront capital cost, but highest lifetime cost due to fuel expense. A grid connection was ruled out due
to the lack of capacity at Julia Creek substation and high cost of transmission line augmentation.
Metallurgical Test work
Metallurgical testwork continues to focus on optimisation of the leach parameters and flotation
flowsheet. CMG are also evaluating options for the post-leach flowsheet to reduce water consumption
and potential environmental impacts.
Development and Environmental Studies and Approvals/Permits
CMG have commenced compiling our environmental impact statement for the Lindfield Project based
on the field studies we have conducted to date and publicly available information. This is being done
ahead of receipt of our Terms of Reference (TOR) on the assumption that our project impacts will be
similar to other potential projects in the area. The final report will be tailored to the actual TOR once they
are received.
criticalmineralsgroup.com.au
PROJECTS AND EXPLORATION UPDATE
During the Quarter, CMG continued to make progress across its Vanadium projects and tenements.
CMG is also participating in an EOI for tenements recently made available adjacent to Lindfield
EPM27872. Below is the current map showing CMG’s current Vanadium tenements.
Image 4: Location of CMG Limited vanadium tenements in the Julia Creek area
Lindfield Project (EPM 27872)
The Lindfield Project is CMG’s flagship project located 30km east of Julia Creek in North-West
Queensland. The Lindfield Project consists of 92 sub-blocks, covering 295km2
. An update on this project
is outlined below:
Progression of Pilot Plant Test work
Please see the separate section above for the relevant update.
Specific Environmental (EIS) Studies Conducted to Advance Approvals
Please see update above
Upcoming Works Program
During the upcoming December Quarter, the Company plans to carry out the following work for the
Lindfield Project:
• PFS metallurgy testing work continues with a focus on reagent consumption optimisation, water
recovery and opportunities for footprint optimisation
• Continue preparation and review of the draft PFS chapters of the major reports completed to
date
• Continue preliminary work on the EIS in anticipation of receipt of the actual terms of reference
criticalmineralsgroup.com.au
Lara Downs Project (EPM 28635) and Lindfield North Project (EPM 28636)
The Lara Downs and Lindfield North Project are both located within 70km (north) of Julia Creek, with the
Lindfield North Project adjoining the existing Lindfield Project and the Lara Downs Project within 35km of
the Lindfield Project.
Lindfield North consists of 36 sub-blocks covering 115 km2
. Lara Downs consists of 118 sub-blocks
covering 378km2
.
Exploration plan for Lindfield North and Lara Downs Projects
CMG considers that both the Lindfield North Project and the Lara Downs Project can benefit from the
learnings of, and results from, exploration in the region to date.
There is no further update for these tenements for this Quarter.
Upcoming Works Program
There is no work currently scheduled for these two tenements in the upcoming December Quarter.
Whinmoor Project (EPM 28631)
The Whinmoor Project consists of 100 sub-blocks covering 320 km² and is located 60km north of Julia
Creek.
The Whinmoor Project intends to extend on exploration by previous explorers and known extensions to
vanadium mineralisation in the Company’s Lindfield Project.
There is no further update for this tenement for this Quarter.
Upcoming Works Program
A drilling plan has been developed for exploration of the Whinmoor tenement, however timing is yet to
be confirmed. There is no work scheduled for this tenement in the December Quarter.
Figtree Creek Project (EPM 27998) and Lorena Surrounds Project (EPM 27999)
No substantive exploration activities or fieldwork had been undertaken on the Tenements for this
Quarter. The Company will continue to assess commercial options going forward.
criticalmineralsgroup.com.au
ASX ANNOUNCEMENT DURING THE QUARTER
This quarterly report contains information released to ASX, which has been reported in accordance with
the JORC Code (where required). These announcements can be found on the Company’s website at
criticalmineralsgroup.com.au/investor
• 31 July 2025 Quarterly Activities/Appendix 5B Cashflow Report
• 13 August 2025 CMG achieves key grant milestones to receive $900K
• 19 August 2025 Webinar Reminder – Company Update
• 23 September 2025 Notice under LR 3.13.1
• 30 September 2025 Annual Report to shareholders
• 30 September 2025 2025 Corporate Governance Statement
• 30 September 2025 Appendix 4G
FINANCIAL COMMENTARY
The Quarterly Cashflow Report (Appendix 5B) for the Quarter provides an overview of the Company’s
financial activities.
Exploration expenditure for the Quarter was $303,185, while corporate and other expenditures totalled
$948,783 (including $393,900 in salaries and director fees).
In accordance with the Company’s disclosure obligations under ASX listings rule 5.3.5, the total amount
paid to directors and their associates in the Quarter (item 6.1 of the Appendix 5B) was $113,750 and
included the Managing Director’s salary.
criticalmineralsgroup.com.au
Forward-Looking Statements
This announcement may include forward-looking statements. Forward-looking statements include, but
are not limited to, statements concerning planned exploration program and other statements that are
not historical facts. When used in this document, the words such as “could”, “plan”, “estimate”, “expect”,
“intend”, “may”, “potential”, “should” and similar expressions are forward-looking statements. Although
the Company believes that its expectations reflected in these forward-looking statements are
reasonable, such statements involve risks and uncertainties and no assurance can be given that actual
results will be consistent with these forward-looking statements.
This announcement was approved by the board of directors of CMG.
For more information contact:
Scott Winter
CEO and Managing Director
info@criticalmineralsgroup.com.au
(07)3132 3504
criticalmineralsgroup.com.au
Schedule 1 – Tenement Schedule as at 30 September 2025
Project
Name
Location Tenement Status
Equity at 30
June 2025
Equity at 30
September
2025
Changes
during
Quarter
Lindfield
Project
Julia Creek EPM 27872 Granted 100% 100% -
Figtree
Creek
Project
Cloncurry EPM 27998 Granted 100% 100% -
Lorena
Surrounds
Project
Cloncurry EPM 27999 Granted 100% 100% -
Whinmoor
Project
Julia Creek EPM 28631 Granted 100% 100% -
Lara Downs
Project
Julia Creek
EPM 28635
Granted 100% 100% -
Lindfield
North
Project
Julia Creek
EPM 28636
Granted 100% 100% -
Rule 5.5
ABN
Current quarter
Year to date
(3 months)
$A’000 $A’000
1 Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration and evaluation - 3 - 3
(b) development
(c) production
(d) staff costs - 394 - 394
(e) administration and corporate costs - 551 - 551
1.3 Dividends received (see note 3)
1.4 Interest received 9 9
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives 900 900
1.8 Other (provide details if material) 7 7
Current quarter
Year to date
(3 months)
$A’000 $A’000
2 Cash flows related to investing activities or for:
2.1 Payment to acquire
(a) entities
(b) tenements
(c) property plant and equipment
(d) exploration & evaluation - 304 - 304
(e) investments
(f) other non-current assets
Quarter ended (“current quarter”)
91 652 994 726 Sep-25
Appendix 5B
Name of entity
Critical Minerals Group Limited
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Consolidated statement of cash flows
1.9 Net cash from/(used in ) operating activities - 32 - 32
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas explortion entity quarterly cashflow report
Current quarter
Year to date
(3 months)
$A’000 $A’000
2.2 Proceeds from disposal of:
(a) entities
(b) tenements
(c) property plant and equipment
(d) investments
(e) other non-current assets
2.3 Cashflows from loans to other entities
2.4 Dividends received
2.5 Other (provide details if material)
Net cash from/(used in) investing activities - 304 - 304
3 Cash flows related to financing activities
3.1
Proceeds from issues of of equity securities
(excluding convertible debt secutities)
3.2 Proceeds from issues of convertible debt securities
3.3 Proceeds from exercise of options
3.4
Transaction costs related to issues of equity securities or convertible
debt securities
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from/(used in) financing activities - -
4
Net increase (decrease) in cash and cash equivalents for the period
4.1 Cash and cash equivalents at beginning of period 1,260.0 881.0
4.2 Net cash from/(used in) operating activities (Item 1.9 above) - 32.0 - 658.0
4.3 Net cash from/(used in) investing activities (Item 2.6 above) - 304.0 - 1,402.0
4.4 Net cash from/(used in) financing activities (Item 3.10 above) - 2,439.0
Current quarter
Year to date
(3 months)
$A’000 $A’000
4.5 Effect of movement in exchange rate on cash held
4.6 Cash and cash equivalents at end of the quarter 924 1,260
Consolidated statement of cash flows
2.6
Consolidated statement of cash flows
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas explortion entity quarterly cashflow report
5 Reconciliation of cash and cash equivalents Current quarter
Previous quarter
at the end of the quarter (as shown in the consolidated statement of cash
flows) to the related items in the accounts
$A’000 $A’000
5.1 Bank balances 924 1,260
5.2 Call deposits
5.3 Bank overdrafts
5.4 Other (provide details)
5.5
Cash and cash equivalents at end of quarter (should equal item 4.6
above)
924 1,260
6 Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associated included in item 1.2
114
6.2
Aggregate amount of payments to related parties and their
associates included in item 2.3
6.3
Aggregate amount of payments to related parties and their
associates included in item 3.4
7 Financing facilities
NOTE: The term "facility" included all forms of financing arrangements
avaliable to the entity
Add notes as necessary for an understanng of the sources of finance avaliable
to the entity.
Total facility amount
at quarter end
Amount drawn at
quarter end
$A’000 $A’000
7.1 Loan facilities
7.4 Total financing facilities
7.5 Unused financing facilites available at the quarter end
7.6
Include below a description of each facility above, including the lender, interest rate, maturity
date and whether it is secured or unsecured. If any additional facilities have been entered
into or are proposed to be entered into after quarter end, include details of those facilities as
well.
Note: if any amounts are shown in 6.1, 6.2 or 6.3 your quarterly report must a description and an
explanation for, such payments
Payments of salary and fees to Executive and Non-executive Directors.
7.3
Payments to related parties of the entity and their associates
Other (please specify)
7.2 Credit standby arrangements
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas explortion entity quarterly cashflow report
8
Estimated cash available for future operating
activities
$A'000
8.1 Net cash from / (used in ) operating activities (Item 1.9) - 32
8.2
Payment s for exploration & evaluation classified as investing
activities) (item 2.1(d))
- 304
8.3 Total relevant outgoings (Item 8.1 + Item 8.2) - 336
8.4 Cash and equivelants at quarter end (item 4.6) 924
8.5 Unused finance facilites avaliable at quarter end (item 7.5) -
8.6 Total available funds (Item 8.4 + Item 8.5) 924
8.7
Estimated quarters of funding available (Item 8.6 divided by Item
8.3)
2.8
8.8
8.8.1 Does the entity expect that it will continue to have the current level of net operating cash flow for the
time being and if not why not ?
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its
operation and , if so, what are those steps and how likely does it believe that they will be successful?
8.8.3 Does the entity expect to be able to continue its operations and to meet its business objectives and , if so ,
on what basis?
Note: if the entity has reported positive net operating cashflows in item 8.3 answer item 8.7 as "N/A. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.7
If Item 8.7 is less than 2 quarters, please provide answers to the following questions:
Answer:
N/A
Answer:
N/A
N/A
Note: where item 8.7 is less than 2 quarters, all questions 8.8.1, 8.8.2 and 8.8.3 above must be answered
Answer:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas explortion entity quarterly cashflow report
1
2
Date: 30-Oct-25
Authorised by: The Board
Notes
1
2
3
4
5
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has
been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of board
committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee, you
can insert here: “By the Disclosure Committee”.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives
a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk
management and internal control which is operating effectively.
This statement does give a true and fair view of the matters disclosed.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s
activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes
to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and
provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to
this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX
pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity
This statement has been prepared in accordance with accounting standards and policies which comply
with Listing Rule 19.11A.
Compliance statement
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 5