Investor Presentation - CMG Strategy
Released
Released
Announcement PDF
Delivering your energy
storage solutions
April 2025
Disclaimer
Critical Minerals Group Lim ited ACN 652 994 726 (CMG or the company) is the issuer of this presentation.
Securities Disclaimer
This presentation is for informational purposes o nly and does no t co nstitute an offer to sell, o r solicit to purchase, any securities.
Reliance on Presentation
A recipient of this presentation must m ake their own assessment of the matters contained herein and rely o n their o wn investi gations and
judgment in making an investment in CMG. This presentation does not purport to contain all of the information a recipient o f this presentation
may require to make an informed decision whether to invest in CMG. Specifically, this presentation does not purport to contain all the
information that investors and their professional advisers would reasonably require to make an informed assessment of CMG’s assets and
liabilities, financial position and performance, profits, losses and prospects.
No Recommendation
The information in this presentation is not a recommendation to acquire shares and does no t co nstitute financial advice. Any person who
intends to acquire shares must conduct their own investigations, assessment and analysis of CMG and its operations and prospects and must
base their investment decision solely on tho se investigations and that assessment and analysis. Prospective investors should consult their own
legal, accounting, tax and financial advisers about an investm ent in CMG.
JORC Statement
The information in this presentation relating to Mineral Resources is extracted from the company’s ASX announcement titled ‘S ignificant
Increase to Mineral Resource Estimate’ dated 10 May 2024 which is available to view on www.asx.com.au. The company confirms that it is not
aware of any new informatio n or data that materially affects the information included in the o riginal market announcement and that all
material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to appl y and have
not materially changed. The co mpany confirms that the fo rm and co ntext in which the Competent Perso n’s findings are presented have not
been materially modified from the original market anno uncem ent.
Production targets and forecast financial information
The information in this presentation that relates to production targets and forecast financial information derived from a production target is
extracted fro m the company’s ASX announcement dated 9 No vember 2023 (“Revised release of Scoping Study results”) available to view at
www.asx.co m.au (Sco ping Study Announcement). The company confirms that all material assumptions underpinning the production targets
and forecast financial information derived from production targets set out in the Scoping Study Announcement continue to appl y and have no t
materially changed.
Scoping Study cautionary statement
The Scoping Study referred to in this presentatio n is based on the Scoping Study released by the company to ASX in the Scoping Study
Announcement.
The company advised that the Scoping Study has been undertaken to consider the development o f the Lindfield Vanadium Project. It is a
preliminary technical and economic study of the potential viability of the Lindfield Vanadium project. It is based on lo w-level technical and
economic assessments that are not sufficient to support the estimation of ore reserves. Further evaluation work and appropriate studies are
required befo re the co mpany will be in a po sition to estimate any ore reserves or to pro vide an assurance of an economic development case.
There is a low level of geological confidence associated with any Inferred Mineral Resources, and there is no certainty that further exploration
work will result in the determinatio n of Measured or further Indicated Mineral Reso urces o r that the Production Schedule or p reliminary eco nomic
assessm ent will be realised.
The Scoping Study is based on the material assumptions o utlined in the Scoping Study Announcement. These include assumptions about the
availability of funding. While the co mpany considers all of the material assumptions to be based on reasonable grounds, there is no certainty
that they will prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved.
To achieve the range of outcomes indicated in the Scoping Study, additional funding will be required. The com pany has a suppo rtive
shareholder base and has successfully raised capital to progress the project in the past. However, investors should note that there is no
certainty that the company will be able to raise the amount of funding required to develop the project when needed. It is also possible that such
funding m ay o nly be available on terms that may be dilutive or otherwise affect the value of the co mpany’s existing shares. It is also possible
that the company co uld pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the Lindf ield Vanadium project. If
it does, this could materially reduce the company’s proportionate o wnership of the pro ject.
The Scoping Study results contained in this presentation relate solely to the Lindfield Vanadium project and do not include Exploration T argets or
Mineral Reso urces defined elsewhere. The company has concluded it has a reasonable basis fo r providing the fo rward-looking statements
included in this presentation.
Given the uncertainties invo lved, investors should not make any investment decisions based solely on the results of the Scopi ng Study.
Fo rward Looking Statements
This presentation co ntains ‘forward-looking statem ents’ that are based on the company’s expectations, estimates and pro jectionsas of the
date on which the statements were made. These forward-looking statements may include, amo ng other things, statements with respect to
prefeasibility and definitive feasibility studies, the com pany’s business strategy, plans, development, objectives, performance, outlook, growth,
cash flow, projections, targets and expectations, mineral reserves and resources, results of exploration and related expenses . Generally, this
forward-looking information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘pro ject’, ‘target’,
‘potential’, ‘likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘m ay’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘pl an’, ‘forecast’, ‘evolve’ and similar
expressions. Persons reading this presentation are cautio ned that such statements are only predictions, and that the company’s actual future
results or performance may be materially different. Forward-looking statem ents are subject to known and unkno wn risks, uncertainties and
other factors that may cause the company’s actual results, level of activity, performance or achievements to be materially different fro m those
expressed o r im plied by such forward-looking information. Forward-looking information is developed based on assumptions about such risks,
uncertainties and o ther factors set out herein. The forward-looking statem ents included in this presentation speak only as of the date of this
presentation. Except where required by law or the ASX Listing Rules, the company does not intend to update or revise the forward-looking
statements in this presentation in the future.
Limited Responsibility for Information
CMG m akes no representation about the likeliho od of a matter, about which a forward looking statement is made, occurring. CMG and its
directors, employees, agents, advisers and consultants give no representation o r warranty to a recipient of this presentation as to the accuracy
or completeness of the statements contained in this presentation o r in relation to any other matter; and to the full extent permitted by law,
disclaim responsibility fo r and have no liability to a recipient of this presentation for any error or omission in or for any statement in this
presentation.
Competent Person Statements
The information above that relates to Mineral Reso urce estimates is based on, and fairly represents, information co mpiled by Adrian Boyd, a
Com petent Person, who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Adrian Boyd is the Principal Geologist –
Australia for John T Boyd Company. Adrian Bo yd has sufficient experience with the style of mineralisation and type of deposit under
consideration, and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition o f the ‘Australasian C ode for
Reporting of Exploration Results, Exploration T argets, Mineral Resources and Ore Reserves’. Adrian Bo yd consents to the inclu sion of the matters
based on their information in the form and context in which it appears. The info rm ation above that relates to metallurgy and metallurgical test
work is based on, and fairly represents, information co mpiled by Nicola Semler, a Com petent Person, who is a Member of the Au stralasian
Institute o f Mining and Metallurgy (AusIMM). Nico la Semler is the Metallurgist and Chief Technical Officer – CMG. Nicola Semler has sufficient
experience with the style of mineralisation and type of deposit under consideration, and to the activities undertaken to qualify as a Com petent
Perso n as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Exploration T argets, Mi neral Resources and Ore
Reserves’. Nicola Semler consents to the inclusion of the matters based o n their information in the form and context in which it appears. The
information above that relates to mining engineering and mine planning is based o n, and fairly represents, information compiled by Gary
Benson. Mr Benson BE is a Mining Engineer with 40 years of experience and is a Fellow of the Australasian Institute of Mining and Metallurgy
(FAusIMM). Mr Benson has sufficient experience, which is relevant to the style of mineralisation, geology and type of deposit under consideration
and to the activity being undertaken to qualify as a competent person under the 2012 edition of the Australasian Code for Reporting Exploration
Results, Mineral Resources and Ore Reserves (the JORC Code, 2012); Mr Benson is an Associate of Measured, is independent of CMG; and
consents to the inclusion in the report of the matters based o n his informatio n in the fo rm and co ntext in which it appears.
The information in this announcement that relates to the exploration results, exploration targets and mineral resources for t he Company’s
Lindfield Vanadium Project was first reported by the Company in the C ompany’s prospectus dated 25 May 2022 and ASX announcements dated
22 February 2023, 13 March 2023, 16 May 2023 and 10 May 2024. The Company co nfirms that it is not aware of any new information or data that
materially affects the exploration results, exploration targets and mineral resources, and that all material assumptions and technical
parameters underpinning these co ntinue to apply and have not materially changed. Where the C ompany refers to exploration results or
mineral resources in this announcement (referencing previous releases made to the ASX), it confirms that it is not aware of a ny new informatio n
or data that m aterially affects the information included in that announcement and all m aterial assumptions and technical parameters
underpinning the exploration results or mineral resources estimate in that anno uncement co ntinue to apply and have not materially changed.
The C ompany confirm s that the form and context in which the Competent Persons findings are presented have not materially changed from
the original announcement.
(2)
Company overview
Critical Minerals Group (CMG) is focused on energy storage solutions, leveraging vanadium flow batteries (VFBs)
CMG’s model integrates upstream (mining), midstream (vanadium electrolyte production), and downstream (energy storage solutions) to create a complete value chain.
The market-to-mine strategy ensures a balanced supply-demand dynamic and optimal pricing. Prioritising early cash flow and risk mitigation, we protect shareholder
investments while enabling sustainable, demand-led growth.
Pentoxide production
Electrolyte manufacturing
Vanadium mining
& processing
Battery Energy Storage System (BESS) solution
Electrolyte
manufacture
Electron storage &
distribution solutions
+
Power supply
partnerships
DEVELOPER SERVICES
•
Extraction
•
Electrolyte manufacture
•
Microgrid development
•
V2O5 processing
•
Quality testing
•
Stand-alone power supply development
•
Transport.
•
Storage and transport.
•
Rural and remote energy support.
•
Batteries and management
systems supplier
•
Critical industries continuous power
•
Near-term cashflow.
Market-to-mine strategy
Upstream supply security
• Vanadium pentoxide (V 2O5) production
• Vanadium electrolyte (VE) manufacturing
• By-products.
Downstream value creation
• Vanadium BESS solutions
• Integrated supply chain
• Commercial and industrial market.
Sustainable delivery
• Integrating ESG in business deliverables
• Vanadium BESS powering CMG
• Traditional Owner involvement.
(3)
Key highlights
World class assets
• Developing the first Vanadium Electrolyte
Manufacturing facility in SEQ
• The Lindfield Vanadium Project holds a
JORC resource of 713Mt at 0.32% V₂O₅,
positioning CMG as a major player in the
global vanadium supply chain.
Diversified income streams
offering business flexibility
• CMG’s vertically integrated business model
spans the entire vanadium supply chain,
targeting multiple revenue sources:
• Vanadium pentoxide (V₂O₅) production
Near-term cashflow
• BESS solutions are on track to generate
cashflow in 2026
• Vanadium electrolyte manufacturing on
track to generate cashflow in 2026.
• Vanadium electrolyte manufacturing
for battery applications
• Battery Energy Storage System (BESS)
solutions.
Strong strategic partnerships
• Investors - Japanese conglomerate
• QLD and Federal Government
• EPC contractors
• Battery and hardware manufacturers
• Technical BESS solutions.
Government and
community support
Growing market tailwinds
• $2M Queensland Government grant to
accelerate vanadium electrolyte production
• Grid-scale energy storage is critical to
Australia’s clean energy transition
• $2.7M Federal Government funding to
fast-track supply chain development
• By 2050, AEMO forecasts that 88% of all
storage will be long-duration (LDES)
— an ideal fit for vanadium flow batteries
• Strong backing from local, state, and
federal governments.
• CMG is committed to ESG leadership through
vanadium recycling, circular economy
initiatives, and local industry growth.
(4)
Proven ability to execute
CMG has a clear direction for 2025
Recent achievements
2022
2022
✓ IPO and $5M capital raised
✓ Idemitsu Australia becomes
cornerstone investor
✓ First drilling program at
Lindfield Vanadium Project.
2023
2025 Targets
2024
✓ Scoping Study completed with
positive results
✓ Successful placement and
entitlement offer raising $4.2M
✓ Second drilling program completed
✓ Scott Winter appointed as CEO
and Managing Director.
2025
2025
•
✓ Significant increase to
Mineral Resource Estimate
Secure further funding through
government grant opportunities
(ARENA, QUAD)
•
✓ Awarded $4.8M in grants/incentives
combined from all levels of
government
Establish licensing agreement with
battery manufacturers and preferred
supply agreements
•
✓ Exploration permits granted for
Lindfield North and Lara Downs
Complete pilot plant test work for the
Lindfield Vanadium Project
•
Delivery of pre-feasibility and
bankable feasibility study for the
Lindfield Vanadium Project
•
Sign up potential customers for BESS
scoping studies and convert into BESS
projects
•
Complete the design and
construction of the Vanadium
Electrolyte Facility to commence
operations in Q1 2026
•
Achieve coordinated project status
and relevant state and federal
approvals for Lindfield Vanadium
Project.
✓ Site secured for Vanadium Electrolyte
Manufacturing Facility
✓ Lindfield Pilot plant test work
commenced
✓ Coordinated Project Status
application submitted for
Lindfield Vanadium Project
✓ Established BESS business strategy.
(5)
Market opportunity
CMG is positioned to capitalise on a growing total addressable market (TAM) with a proven
technology and market leading resource
Global
Australia
Demand established
Annual installed VFB utility-scale and commercial and
industrial battery deployment energy capacity by region,
all application segments, World markets 2022–2031
Grid-scale, long duration
battery storage (LDES) is
imperative
Vanadium battery deployment
15GWh total operational, in construction and announced
By 2050 AEMO forecast that:
China 2023
•
•
49GW/646GWh of
dispatchable storage will be
required to support 58GW of
new grid scale solar, 69GW of
wind power generation.
•
Completed 3GW VFB Gigawatt factory Beijing Xingchen New Energy
Technology Co., Ltd
•
Announced 240MW/960MWh Wontai Power
•
88% of all storage will be
long-duration (LDES) —
suited to vanadium flow
batteries.
Under construction 100MW/600MWh China Vanadium Energy
Storage/Shanghai Electric
•
Announced 100MW/500MWh Panzhihua China Power Investment
New Energy Co., Ltd
•
Announced 50MW/300MWh Jiangsu Linyuan Group
•
Announced 70MW/280MWh SPIC Hubei Changyuan
New Energy Co., Ltd
Case study
•
•
Source: Gunjan, P; Chavez, M; Power, D; 2022, Vanadium Redox Flow
Batteries – Identifying Market Opportunities and Enablers,
Guidehouse Insights (commissioned by Vanitec)
Guidehouse_Insights-Vanadium_Redox_Flow_Batteries.pdf
China 2024 — Announced 100MW/800MWh, Maymuse, Hebei
NSW alone requires
2GW/16GWh of long duration
storage by 2030.
CMG’s Lindfield Project is
expected to produce V2O5
sufficient to generate approx.
1GWh per year.
California, USA 2023 — Under construction 20MWh project
South Australia 2023 — Completed 8MWh battery
China Q4 2022
• Commenced operation 100MW/400MWh in Dalian
•
Commenced operation 6MW/36MWh in Zongyang
Japan Q2 2022 — Commenced operation 17MW/51MWh in Hokkaido
Hardware manufacturing facilities
Korea 2023 — Constructed H2 Inc 330MWh/yr manufacturing and planning a
1GWh facility
Vancouver 2023 — Opened Invinity 200MWh capacity manufacturing facility
USA 2023 — Announced Sumitomo Electric will create 400MWh manufacturing
facility.
(6)
CMG clearly defining its target customers and
an achievable growth pathway
Opportunities for long duration batteries
• CMG has identified its target customer
applications
• Enhancing economic efficiency of
renewable energy
• Load balancing and enhancing grid
resilience
• Power security and reliability
• Continuous power supply
• Lowering diesel usage.
• Staging its BESS implementation from low
complexity, repeatable kWh applications to
larger MWh installations.
• Projects range from 250kWh to 40MWh
providing a market for CMG in the short to
medium term.
(7)
Integrated
business model
CMG creating an integrated supply chain
Delivering energy storage solutions to customers
SUPPLY CHAIN
Pentoxide production
Vanadium mining
& processing
Electrolyte manufacturing
Electrolyte
manufacture
Battery Energy Storage System (BESS) solution
Electron storage &
distribution solutions
+
Power supply
partnerships
DEVELOPER SERVICES
• Extraction
• V2O5 processing
• Transport.
• Electrolyte manufacture
• Quality testing
• Storage and transport.
• Microgrid development
• Stand-alone power supply development
• Rural and remote energy support
• Batteries and management systems supplier
• Critical industries continuous power
• Near-term cashflow.
Market-to-mine strategy
(9)
Battery Energy Storage
System (BESS) solutions
BESS services offering
Vanadium Flow BESS Solutions
CMG has developed a total package solution for renewable assets using vanadium batteries (VFB) from funding to install
and operations
The total battery solution
Progress to date
Customer
engagement
Project origination and commercial
agreements
Discussions have commenced with commercial buildings, remote
mines, a sugar mill, a data centre and a remote community council
CMG
Project scoping
studies
Feasibility, demand forecasting,
risk analysis, equipment selection
CMG has engaged a partner on a live scoping study
CMG,
Partners
Technical design
Energy asset design, battery,
and PV
Two partners have been identified and initial discussions are
underway
Partners
Economic
modelling
Assessing battery size, duration, BMS
CMG has the internal capacity
CMG
EPC management
Construction and delivery of asset
CMG has close relationships with two preferred suppliers for EPC
services
CMG
Supply items
Vanadium electrolyte, vanadium
battery, solar panels, inverter
Battery, electrolyte and inverter relationships being secured
CMG,
Partners
Software supplier
Battery management system,
energy management system
Building preferred supplier list
Partners
Funding/PPA
Funding options — ownership,
lease, finance
CMG engaging financiers that can offer a range of funding options
CMG,
Partners
Operations and
maintenance
Ongoing maintenance of asset
CMG has two preferred suppliers in place for O&M services
CMG,
Partners
CMG
Battery
Solution
Provider
( 11 )
BESS services offering
Unit and scale economics
Downstream BESS solutions installation targets
CMG plans to use the V2O5 production to manufacture vanadium electrolyte and then use
this entire production in vanadium battery installations.
Supply chain production per annum
10,000t
of V2O5
68m litres
vanadium
electrolyte
1.3 GWh
vanadium
battery storage
capacity
BESS is expected
to generate
cashflow by 2026
Case Study: Design and install vanadium battery
CMG can be flexible with its commercial model
Asset 2MW, 16 MWh (8-hour battery)
Design and management
CapEx Dry battery + Electrolyte
Assembly/install/margin/other
Total (installed CapEx)
Total
• Asset lease/rent
• Vanadium electrolyte leasing/rent
• Margin derived from delivering project related services — design,
procure, engineering, procurement and construction (EPC), operations
and maintenance (O&M).
~ $1000 / kWh
~$16.0 million
Case study is for illustrative examples
( 12 )
Vanadium electrolyte
manufacturing
Vanadium electrolyte manufacturing facility
Highlights
•
•
•
•
•
•
$2M Queensland Government Treasury grant
1 million litres vanadium electrolyte — approx 20 MWh
V2O5 initially sourced from third party supplier, then from CMG Lindfield
project production
Existing Logan warehouse facility can support expansion up to 5x
Major testing, qualification lab on site
Production and cashflow anticipated in 2026.
Samples of Vanadium Electrolyte at different oxidation states
Phase 1 Development and commissioning
•
•
Design and construct
Commissioning plant and early operations.
Phase 2 Steady state vanadium electrolyte (VE) operations
•
•
1 million litre production
Sales anticipated to be approximately $5-7M pa.
Phase 3 Expansion VE operations
•
•
•
Planned expansion within three years (market dependent)
Expansion to 10 million litres (approx. 200MWh) capacity pa
Sales anticipated to be approximately $50-70M pa.
Vanadium Electrolyte facility in the City of Logan,
South East Queensland
( 14 )
12-MONTH PLAN
Midstream — 12-month development plan
Planning
Phase
•
•
•
Secured QLD Treasury grant funding $2 million for 1 million litres , 20 MWh capacity facility
Awarded — EPC contract to Sedgman and technology partner Van-Tech (UK)
Secured manufacturing site location warehouse 1,443 m2 — (warehouse capable of expansion to 5x capacity).
Complete
Design and
construction
•
•
•
FEED design phase underway with completion expected in Q2 2025
Procurement and construction expected to commence in Q2 2025 through Q1 2026, commissioning expected in Q1 2026
Engaging with UNSW, QUT, UQ, AMBC to assist in impurity management.
In progress
Commission
•
Operations expected to commence in Q1 2026 with commissioning ramp up to 1 million litres pa.
Operational
Product
qualification
Customer
engagement
Expansion
planning
Planned
Q1 FY26
•
•
CMG will operate with internal personnel — chemical, electrical, manufacturing experience
Initially V2O5 sourced from third party (Glencore, Largo), then by CMG V2O5 when mine in production.
•
Early engagement with suppliers of V2O5 to ensure adequate quality and minimal impurities, Glencore V 2O5
in lab being analysed Q1 2025
CMG have spec requirements from battery manufacturers (Invinity, Sumitomo, Cellcube), and will pre-qualify VE in
commissioning and initial operations.
In progress
•
•
•
CMG building relationships with battery manufacturers (Invinity, Sumitomo, Cellcube)
Discussing offtake and supply arrangements with battery manufacturers
Discussing potential partnerships for Australian market battery assembly.
In progress
•
•
Initial production capable of 20MWh pa
Expansion to 5x or 10x driven by market demand and negotiated offtake agreements. Growth timing drives
Lindfield V2O5 production
Expansion plans include Australia and international plant locations.
Planning
•
•
( 15 )
Midstream — Unit and scale economics
Vanadium electrolyte manufacturing facility
1 million litres pa capacity — 20 MWh pa
Phase 1
Commissioning and
initial operations
• Increase production to
1 million litres pa rate over
commissioning period
• Maintain production at
1 million litres pa thereafter
(market dependent)
• V2O5 sourced from third party
(Glencore, Largo) – market
pricing.
1
Dependent on source of V205
Phase 2
Phase 3
Steady state operations
10x expansion steady
state operations
Production
1 million litres pa
rate, 20 MWh
Production
10 million litres pa
rate, 200 MWh
CapEx
AUD$6.5M
CapEx
AUD$40-50M
OpEx
AUD$3.5–5.5/litre1
OpEx
AUD$3.2-5.5/litre1
Indicative
Revenue
AUD$7/litre,
$7million pa
Indicative
Revenue
AUD $7/litre, $70M
pa
Margin
AUD$1.5-3.5/litre1
Margin
AUD$3.5/litre
Phase 4
Potential expansion beyond
• Expansion in Australia greater
than 10x facility
• Expansion to USA and Europe
to 10 million litre pa facility.
( 16 )
Pentoxide production
Lindfield Vanadium Project
Upstream — Linfield V205 resource
Overview and assets
Large scale resource
•
Mineral Resource estimate of 713Mt,
491Mt Indicated at 0.32% V2O5, 3.4% Al2O3
and 130ppm Mo. 72% less than 20m depth.
Simple operations
•
•
4 Vanadium tenements
•
•
•
•
Lindfield EPM
Lindfield North EPM
Winmoor EPM
Lara Downs EPM
100%
100%
100%
100%
Low strip ratio shallow mining <20m
Flat, consistent, simple, low capital
mining equipment.
Ideal location
•
Close to infrastructure, services,
Julia Creek, main highway and rail,
power and water.
Low risk regulatory
•
Low risk jurisdiction for
approvals with Government
support.
1
Mine and Processing
Julia Creek
2
Vanadium Electrolyte
Manufacturing Plant
South East Queensland
( 18 )
Upstream — Development plan
•
•
•
•
Drilling
Upgrade MRE
Pre-feasibility
Environmental Impact
Statement (EIS)
studies
• Pre-feasibility
• Bankable Feasibility
Study
• Bulk Sample
• EIS/Mining Lease
application
•
•
•
•
•
QRCUF Trial
Reserves defined
EIS approval
FID Lindfield
Funding arrangement
2023/24
2025
2026
• Defining the resource,
commencing
feasibility studies and
firming up the
processing metallurgy
• Commence
development
approval process with
environmental studies
• Engagement with
government and
industry stakeholders
to source support –
funding, approvals,
resources.
• Operating pilot scale
testing of vanadium,
finalising the Bankable
Feasibility Study and
engineering to refine
operating and capital
costs
• Extracting bulk sample
from Lindfield
• Completing
environmental studies,
submitting EIS
application.
• Achieving
development
approval for Lindfield
mine
• Processing bulk
sample through
QRCUF demonstration
facility in Townsville
• Reaching Financial
Investment Decision
(FID) and arranging
development funding
and offtake
arrangements.
• Detailed Design
• Procurement
• Construction
2027
• Construction
• Commission
• Pre-qualify with
offtake partners
2028
• Commencing EPC design, procurement and
Construction of mine and processing facility
• Pre-qualifying Lindfield V2O5 with offtake partners,
battery customers.
• Commission
• Steady State
Operations
• Sales
2029
• Commissioning and
steady state
production of V 2O5
• Integrating supply
with CMG vanadium
electrolyte
manufacturing.
( 19 )
Lindfield Vanadium Project*
10,000 Tonne V2O5
The Project has the technical and financial
attributes to potentially develop a
successful 4 million tonne per annum run
of mine (ROM) vanadium mine producing
10,000 tonne of V2O5 as well as 400 tonne of
molybdenum trioxide.
$400M capital cost
$510M NPV
Estimated direct capital costs
(excluding indirect costs, EPCM, owners’
costs and contingency).
Assuming AUD$31/kg 98.5% V₂O₅,
USD$57.5/kg 99% MoO3 , FX of $0.68 and
Royalty Rate 2.5%.
17 %IRR
Equivalent to 1.3GWh of energy.
Potential after-tax IRR of approximately
17%, from the vanadium pentoxide and
molybdenum trioxide product streams.
Low OpEx cost
Long mine life
Strong revenue
Continuous production of V2O5 at approx.
C1 AUD$14-16/kg.
With the opportunity to expand life of mine
(LOM) with potential upside in resource
subject to further evaluation.
Revenue from external V2O5 sales or
internal use to manufacture electrolyte.
Molybdenum production cost lower due to
its treatment as a by-product from the
vanadium stream.
Approx Revenue $310-350M pa.
Strong margin
Market price AUD$31/kg
C1 Production cost AUD$14-16
Margin AUD$15-17/kg.
* See ASX Release – “Resource Upgrade” –16 May 2023.
See ASX Release – “Revised Release of Scoping Study Results” - 9 November 2023.
( 20 )
Combined integrated
solution
Energy Storage Solutions
Combined integrated solution
Pentoxide production
Vanadium mining
& processing
Share your feedback