Quarterly Activities Report & Appendix 5B for the period ending
30 September 2024
Key Highlights
•
CMG awarded up to $2m from Queensland Treasury via the Critical Minerals Battery and
Technology fund
o These funds will be used for the development of CMG’s Vanadium Electrolyte facility
•
•
in SEQ.
Fully underwritten entitlement offer raising approximately $2.5 million (before costs)
successfully completed.
CMG successfully launched business strategy and rebrand at an event held In Brisbane
in August
o Strategy highlighting focus on value chain from mine to manufacture of vanadium
•
electrolyte for battery storage
Pilot Plant test work commenced
•
CMG has progressed its Vanadium Electrolyte business planning
•
o BML have completed the Initial scrubbing and cyclone phases of the test work
o City of Logan identified as the opportune location for operations
Draft application documents for a coordinated project declaration prepared
o Initial Advice Statement (IAS), Capability to Complete and Environmental Impact
•
•
Statement and Pre-Feasibility Assessment Statement.
Support for Minerals to Megawatts CRC bid
o CMG have formally joined the industry cohort supporting the bid
Positive progress made with Pre-Feasibility Study
o Pit definitions and mine plan progressed
•
o Flow sheet trade-off studies completed
Environmental and social studies on track
o Completion of initial ecology flora and fauna surveys at the Lindfield Project.
criticalmineralsgroup.com.au
(+61) 755 555 077
Level 4, 10 Eagle Street, Brisbane QLD 4000, Australia
info@criticalmineralsgroup.com.au
Critical Minerals Group Limited (ASX:CMG), (Critical Minerals Group, CMG, or the Company) is
pleased to provide shareholders with the following update in relation to the Company’s activities
for the quarter ended 30 September 2024 (Quarter).
Company activities
CMG awarded $2m QLD Government Grant
During the Quarter CMG entered into an agreement with the State of Queensland (acting through
Queensland Treasury) under which it has been allocated up to $2 million as a grant under the
Queensland Critical Minerals and Battery Technology Fund. 1
The grant will partially fund the development of a vanadium electrolyte manufacturing
demonstration plant consisting of a single 12-cell electrolyser unit that has the capacity to
produce one million litres of vanadium electrolyte per year (Facility). The Facility will be located in
Southeast Queensland and will be designed to produce vanadium electrolyte suitable for use in
vanadium redox flow batteries.
CMG has agreed to co-contribute at least $2 million towards the development of the Facility.
The grant will enable CMG to commence project planning and will fast-track the development of
the Facility, which is intended to be completed, installed, and commissioned by the end of 2025.
Successful completion of Entitlement Offer raising approximately $2.5m (before
costs)
With the business strategy released and budget approved for activities associated with both the
development of the Lindfield Project and the establishment and development of the vanadium
electrolyte business and manufacturing facility CMG undertook to raise supporting funds. On 31
July 2024, CMG announced a 3 for 10 non-renounceable entitlement offer at an offer price of $0.15
to raise approximately $2.5 million (Entitlement Offer). The Entitlement Offer was fully underwritten
by Morgans Corporate Limited (Morgans).
CMG raised approximately $2.5m (before costs) from the Entitlement Offer which closed on 21
August 2024. CMG’s major shareholder Idemitsu Lindfield Pty Ltd took-up its full entitlement under
the Entitlement Offer and also participated in the allocation of shortfall as a sub-underwriter.
Settlement of the Entitlement Offer took place on 27 August 2024, with the issue and allotment of
the new Shares occurring on the following Business Day, and ASX trading of the new shares
occurring on 29 August 2024.
1. CMG ASX Announcement: CMG Awarded $2m QLD Govt Grant announced 21 August 2024
criticalmineralsgroup.com.au
CMG Business Strategy
Over the past 12 months the board and executive team have worked on the development and
implementation of a business strategy that would best position CMG to take advantage of the
opportunities that the current global and domestic energy transition is generating.
This strategic context formed the basis for the formation of the purpose, vision, business
objectives and accompanying final strategy of CMG. Five key areas of focus are outlined below:
1.
Development Operations:
•
•
•
World class vanadium asset in a critical mineral zone
Significant government and social support
Government invested in local infrastructure and activities
Planned development of the Lindfield resource could benefit from a lower risk profile
2.
Critical Minerals Group:
•
•
•
Experienced diverse delivery team
Strong and supporting cornerstone investor – Idemitsu Australia
Valuable strategic partnerships
CMG has a great platform and narrative to enhance shareholder value.
3.
Vanadium Market
•
•
•
Vanadium market showing significant growth
Vanadium batteries featuring in energy transition solutions
Australia is a strategic supply source and in demand
Evidence shows the vanadium supply will be under pressure leading to price growth.
4. ESG
•
•
•
CMG has an experienced and diverse team committed to the integration of ESG into its
operational fundamentals
Early establishment of baseline and reporting
Implementation of commitments underway
CMG are aiming to position itself as a future leader in ESG outcomes.
5. Vanadium Batteries
• Major stakeholders (Governments, battery manufacturers, energy providers) are
investing in vanadium electrolyte and vanadium batteries in Queensland Australia, and
are committed to establishing a supply chain in Queensland and Australia
Vanadium batteries provide a stable, low cost, reliable solution to target zero 2050 in
Australia and major developing countries.
criticalmineralsgroup.com.au
Following these findings, CMG developed its Purpose, Vision and associated Objectives pillars.
Purpose: To support global communities through an energy transition that will deliver a more
sustainable and responsible future,
Vision: To be known as the leading high-quality manufacturer of Vanadium battery products for the
energy storage market and deliver responsible and robust returns.
Objectives:
1. Premium Producer: Deliver high purity Vanadium to manufacture Electrolyte for batteries with no
rejections.
2. Responsible:
Uphold a quality ESG standard whilst establishing operations using renewable
energy, engaging traditional owner and local communities to help deliver an Australian made and
manufactured outcome.
3. Robust Returns: Delivering returns through downstream manufacturing of vanadium electrolyte
and enabling the extraction of adjacent minerals (HPA, Mo) within the resource.
CMG developed the three key strategic pillars with clearly defined detail on how the Purpose,
Vision, and Objectives could be efficiently and effectively achieved. Strong leadership, strong
partnerships and innovation will support the strategy.
Company Rebrand
During the Quarter, in line with the business strategy, CMG released updated branding that
accurately reflects the evolving Company's purpose, vision, values and position in the market.
CMG's rebrand marks a step change for the Company as it progresses towards its development
objectives.
criticalmineralsgroup.com.au
Vanadium Electrolyte manufacturing business progress
CMG has continued to progress business planning for the development of the Vanadium
Electrolyte Manufacturing Facility.
Following a detailed market review, both domestically and internationally, further planning for the
facility is underway.
CMG is working with Sedgman Prudentia who has been contracted to design, procure, and
construct the facility utilising proven and available technology from the market.
CMG has also identified the City of Logan as the opportune location for the Company’s Vanadium
Electrolyte operations. Located in South-East Queensland, Logan provides supply chain
optimisation, a thriving economic environment, a proactive stance on supporting the clean
energy transition, and a supportive council and economic development team.
CMG is in the final stages of securing a site to commence construction and development in 2025.
criticalmineralsgroup.com.au
Pilot Plant test work commenced
CMG commenced their pilot plant processing at Brisbane Metlabs (BML) in September. This will
take place over several weeks as testing steps sequentially through the main areas of the
proposed flowsheet. The first area at the front of the flowsheet is physical separation which
involves scrubbing, screening and cyclone separation.
The board and executive have been close and observing the scrubbing, screening and cyclone
testing occurring at BML.
Figure 1 shows the scrubber in action processing material from the TLBA horizon. Figures 2 and 3
show the coarse and intermediate rejects streams respectively from the scrubber operation.
Figure 4 shows the two cyclone products, cyclone overflow and cyclone underflow, with the
underflow representing the fines reject stream from the physical separation processes. The results
from these two physical separation steps will be fully analysed before testing progresses to the
next stage of the flowsheet – flotation.
From Left to right:
Figure 1: Scrubbing TLBA Horizon material - drillcore from the Lindfield Project
Figure 2. Course (+8mm) reject material from scrubbing
Figure 3: Intermediate (-8mm+2MM) reject material from scrubbing
Figure 4: Cyclone overflow (left) and underflow (right) products from cyclone testing.
criticalmineralsgroup.com.au
Development and Environmental Studies and Approvals/Permits
During the Quarter, the Company prepared the draft application documents for a coordinated
project declaration by the Coordinator-General under Part 4 of the State Development and Public
Works Organisation Act 1971 (Qld) (SDPWO Act). The draft application documents comprise an
Initial Advice Statement (IAS), Capability to Complete and Environmental Impact Statement and
Pre-Feasibility Assessment Statement. The IAS provides an overview of the Project, including an
indicative general arrangement shown in Map 1 below, to inform the preparation of the Terms of
Reference for an Environmental Impact Statement for the Project.
The Company also continued its engagement with the Office of the Coordinator-General and
consultation with the Queensland Government’s Critical Minerals Office.
Planning and execution of the necessary assessment studies to progress the development of the
Environmental Impact Statement documentation continued during the Quarter and will continue
over the next three quarters.
criticalmineralsgroup.com.au
Figure 5: Lindfield Vanadium Project - Indicative General Arrangement included in the IAS.
criticalmineralsgroup.com.au
CMG support for Minerals to Megawatts Co-operative Research Centre Bid
The Minerals to Megawatts Cooperative Research Centre (CRC) is a nation-wide coordinated
initiative that aims to turbocharge Australia’s renewable technology competitiveness and
sovereign capability through strategic development of critical high-value renewable technology
components that maximise energy security while affording major export opportunities.
CMG added its support to the bid in the form of both potential cash and in-kind contributions to
facilitate the goals of the bid, which at a high level, aims to address industry challenges at crucial
junctures of the renewables technologies supply chain, including gaps in pre-deployment testing,
lack of infrastructure for grid integration and situation testing, lack of common safety standards,
shortage of an appropriately skilled and diverse workforce, gaps in certification processes for
batteries and renewable technology components and risks in supply chain continuity and
provenance.
The bid was shortlisted in September and CMG have now progressed to Stage 2.
Collaborative Development Program (CDP) Grant Application
Submission of an application for a Collaborative Development Program Grant was delayed to
enable further investigation of potential tailings value-add opportunities to facilitate more
targeted expenditure in the application and to obtain quotes and timelines to meet the
requirements under the guidelines. CMG expects to compile and submit this application in the
near future; however the Company will continue to identify opportunities as they arise.
International Partnerships in Critical Minerals Program Grant Application
No further updates around timing of notification were received in the Quarter. Feedback is still
expected in the final quarter of 2024.
criticalmineralsgroup.com.au
Projects and Exploration Update
During the Quarter, CMG continued to make progress across its Vanadium projects and
tenements. Below is an updated map which shows CMG’s current Vanadium tenements.
Lindfield Project (EPM 27872)
The Lindfield Project is CMG’s flagship project located 30km east of Julia Creek in North-West
Queensland. The Lindfield Project consists of 92 sub-blocks, covering 295km2. An update on this
project is outlined below:
Commencement of Pilot Plant Test work
Please see separate section above for detailed update.
Progression of Feasibility Studies
Work on the studies formally commenced in April 2024 with overall management and engineering
works being undertaken by Sedgman, supported by Sedgman Prudentia for process
fundamentals and MEC Mining for mine design and optimisation. The trade-off studies continued
with completion of a couple of key studies and the remainder progressing well along with the
development of the financial model.
Specific Studies Conducted to Advance Approvals
The ecological surveys conducted in the quarter ended 30 June 2024 confirmed the presence of
substantial populations of the prescribed weeds Prickly Acacia and Parkinsonia, both of which had
been observed during the two previous drilling programs. Discussions with the Department of
Agriculture and Fisheries have identified some potential management paths which will be
discussed with the landowner to develop long-term management plans for disturbed areas and
potential offset areas.
criticalmineralsgroup.com.au
The presence of the Julia Creek Dunnart on the property was confirmed although none were
trapped due to an upsurge in the population of the native rat Rattus Villosissimus. The Black Tailed
Godwit (migratory bird) was also identified on the site. Both the Godwit and the Dunnart are
classified as endangered and will require specific management plans. There were no other
endangered species sighted during the survey periods to date.
Three species of pest fauna were identified – feral cats, feral pigs and cane toads.
Of note, is that there were no surprises in the species of flora and fauna encountered. Planning for
additional surveys targeting the wet season is underway although it will be dependent upon
access at the time and will therefore require some flexibility in timing.
Community and Government Engagement
CMG continues to develop relationships within the Julia Creek Community, and to work with the
Queensland Government to discuss and progress approvals.
During the Quarter meetings were held with the Lindfield landowner in person and also with the
Mayor and the CEO of the McKinlay Shire Council to discuss the implications of the project for the
local community and the opportunities for the local community and for mutually beneficial
collaboration.
Upcoming Works Program
During the upcoming quarter ending 31 December 2024 (December Quarter), the Company plans
to carry out the following work for the Lindfield Project:
•
•
Continue pre-feasibility study and trade-off study work with Sedgman Prudentia.
Undertake metallurgical test work including:
o
•
flotation, leach and metal extraction pilot scale testing
o
testing of potential alternative equipment options for the Lindfield flowsheet to evaluate
o
continuing investigations into optimal flowsheet configuration for molybdenum
o
continue a new round of High Purity Alumina (HPA) test work with Lava
opportunities for footprint/capital expenditure reductions.
recovery; and
Blue/Queensland University of Technology aimed at testing options to further
improve product quality and generate product for downstream investigations.
Progress environmental and approvals related works and studies required for the
preparation of the Environmental Impact Study (including work on obtaining various
•
government approvals).
Continue discussions with government departments regarding water security and
access to licensed volumes.
criticalmineralsgroup.com.au
2
Lara Downs Project (EPM 28635) and Lindfield North Project (EPM 28636)
The Lara Downs and Lindfield North Project are both located within 70km (north) of Julia Creek,
with the Lindfield North Project adjoining the existing Lindfield Project and the Lara Downs Project
within 35km of the Lindfield Project.
Lindfield North consists of 36 sub-blocks covering 115 km2. Lara Downs consists of 118 sub-blocks
covering 378km2.
Exploration plan for Lindfield North and Lara Downs Projects
CMG considers that both the Lindfield North Project and the Lara Downs Project can benefit from
the learnings of, and results from, exploration in the region to date.
Upcoming Works Program
While no substantive exploration activities and field work have been undertaken, a works program
has been defined to systematically explore the newly granted tenements and identify potential
opportunities.
There is no work currently scheduled for these two tenements in the upcoming quarters ending 31
December 2024 or 31 March 2025 Quarters.
Whinmoor Project (EPM 28631)
The Whinmoor Project consists of 100 sub-blocks covering 320 km² and is located 60km north of
Julia Creek.
The Whinmoor Project intends to extend on exploration by previous explorers and known
extensions to vanadium mineralisation in the Company’s Lindfield Project.
There is no further update for this tenement for this Quarter.
Upcoming Works Program
A drilling plan has been developed for exploration of the Whinmoor tenement, however timing is
yet to be confirmed. There is no work scheduled for this tenement in the December Quarter.
Figtree Creek Project (EPM 27998) and Lorena Surrounds Project (EPM 27999)
No substantive exploration activities or fieldwork was undertaken on the Figtree Creek Project
and Lorena Surrounds Project (the Tenements) during the quarter and the non-binding
farm-in agreement on the Tenements is no longer in effect. 2
CMG ASX Announcement announced 23 October 2024: Farm-In Agreement update on Non-Core Tenements
criticalmineralsgroup.com.au
ASX Announcements during the Quarter
This quarterly report contains information released to ASX which has been reported in
accordance with the JORC Code (where required). These announcements can be found on the
Company’s website at criticalmineralsgroup.com.au/investor
•
17 July 2024
Noosa Mining Conference Presentation
•
26 July 2024
Quarterly Activities/Appendix 5B Cash Flow report
•
31 July 2024
Entitlement Offer to raise approximately $2.5 million
•
31 July 2024
Notice to option holders
•
31 July 2024
Investor Presentation
•
31 July 2024
Entitlement Offer – Amended timetable
•
31 July 2024
Proposed issue of securities - CMG
•
31 July 2024
Cleansing notice
•
5 August 2024
Becoming a substantial holder
•
8 August 2024
Despatch of Entitlement Offer Booklet
•
21 August 2024
CMG awarded $2m QLD Govt Grant
•
22 August 2024
Notice under section 708AA(12) Corporations Act
•
26 August 2024
Completion of Entitlement Offer
•
28 August 2024
Application for quotation of securities – CMG
•
30 August 2024
Change in substantial holding
•
30 August 2024
Change in substantial holding
•
30 August 2024
Change of Director’s Interest Notice – S McClure
•
30 August 2024
Change of Director’s Interest Notice – S Winter
•
9 September 2024
Full Year Statutory Accounts
•
20 September 2024
Release from escrow
•
23 September 2024
Notice under LR 3.13.1
•
23 September 2024
Change in substantial holding – IGS
•
25 September 2024
Change in Director’s Interest Notice – S McClure
•
27 September 2024
Application for quotation of securities – CMG
•
27 September 2024
Notification of cessation of securities - CMG
criticalmineralsgroup.com.au
Financial Commentary
The Quarterly Cashflow Report (Appendix 5B) for the Quarter provides an overview of the
Company’s financial activities.
Exploration expenditure for the Quarter was $650,655, while corporate and other expenditures
totalled $635,694 (including $231,804 in salaries and director fees)
During the Quarter the Company received $2.5m via the Entitlement Offer and incurred $212,695 in
costs associated with the Entitlement Offer.
In line with its obligations under ASX listings rule 5.3.5, the total amount paid to directors and their
associates in the Quarter (item 6.1 of the Appendix 5B) was $121,199 and included the Managing
Director’s salary.
criticalmineralsgroup.com.au
JORC Statement
The information in this announcement relating to Mineral Resources is extracted from the
Company’s ASX announcement titled ‘Significant Increase to Mineral Resource Estimate’
dated 10 May 2024 which is available to view on www.asx.com.au. The Company confirms
that it is not aware of any new information or data that materially affects the information
included in the original market announcement and that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
Forward-Looking Statements
This announcement may include forward-looking statements. Forward-looking statements
include, but are not limited to, statements concerning planned exploration program and
other statements that are not historical facts. When used in this document, the words such
as “could”, “plan”, “estimate”, “expect”, “intend”, “may”, “potential”, “should” and similar
expressions are forward-looking statements. Although the Company believes that its
expectations reflected in these forward-looking statements are reasonable, such statements
involve risks and uncertainties and no assurance can be given that actual results will be
consistent with these forward-looking statements.
This announcement was approved by the board of directors of CMG.
For more information:
Scott Winter
CEO and Managing Director
info@criticalmineralsgroup.com.au
(07) 5555 5077
criticalmineralsgroup.com.au
Schedule 1 – Tenement Schedule as of 30 September 2024
Project
Name
Location
Tenement
Status
Equity at 30
June 2024
Equity at 30
September
2024
Changes
during
Quarter
Lindfield
Project
Julia Creek
EPM 27872
Granted
100%
100%
-
Figtree
Creek
Project
Cloncurry
EPM 27998
Granted
100%
100%
-
Lorena
Surrounds
Project
Cloncurry
EPM 27999
Granted
100%
100%
-
Whinmoor
Project
Julia Creek
EPM 28631
Granted
100%
100%
-
Lara Downs
Project
Julia Creek
Granted
100%
100%
-
Lindfield
North
Project
Julia Creek
Granted
100%
100%
-
EPM 28635
EPM 28636
criticalmineralsgroup.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
CRITICAL MINERALS GROUP LIMITED
ABN
Quarter ended (“current quarter”)
91 652 994 726
30 SEPTEMBER 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(3 months)
$A’000
-
-
(2)
(2)
(d) staff costs
(231)
(231)
(e) administration and corporate costs
(404)
(404)
3
3
-
-
(634)
(634)
(650)
(650)
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
(650)
(650)
2,493
2,493
(212)
(212)
2,281
2,281
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities (i)
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
1,432
1,432
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(634)
(634)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(650)
(650)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
2,281
2,281
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(3 months)
$A’000
-
2,429
Current quarter
$A’000
2,429
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
2,429
1,432
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,429
1,432
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1.2
121
6.2
Aggregate amount of payments to related parties and their
associates included in item 2.3
-
6.3
Aggregate amount of payments to related parties and their
associates included in item 3.4
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1, 6.2 or 6.3, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(634)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(650)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,284)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,429
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
-
$A’000
2,429
1.89
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes. The Company’s expenditure will continue to track its near-term objectives that
include the development of the L
Share your feedback
Discover