Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
criticalmineralsgroup.com.au
(+61) 731 323 504
Level 15, 100 Edward St, Brisbane QLD 4000, Australia
info@criticalmineralsgroup.com.au
ASX Announcement
ASX: CMG
30 April 2026
Quarterly Activities Report & Appendix 5B for the period ending
31 March 2026
KEY HIGHLIGHTS
Downstream: Battery Energy Storage Solutions
CMG continues discussions with international vanadium flow battery (VFB)
manufacturers on future supply of vanadium electrolyte (VE).
VFBs are becoming increasingly sourced as an energy storage and firming
infrastructure for data centres and specifically AI-driven, generative data centres.
Major planned data centre developments in the US are leading the way with
deployment of VFBs.
Midstream: Vanadium Electrolyte Manufacturing Facility Development
CMG is progressing plans for an expanded 24 million litre VE facility, as assessed in
the Pre-Feasibility Study (PFS) and consistent with supply into potential energy firming
demand internationally.
Early-stage discussions are underway regarding potential VE offtake to support future
VFB development and installations.
Upstream: Julia Creek Mine Development
The PFS assesses development of the Lindfield Mine and processing facility in North
Queensland, alongside VE manufacturing in Parkes.
Two development cases were considered:
1 mtpa (3,000+t V2O5, 24 million litres of VE)
4 mtpa (11,000+ t V2O5, 80+ million litres of VE).
The PFS testing and study work has been completed, with findings and assumptions
being financially modelled, and an expected release of PFS results in early Q4.
criticalmineralsgroup.com.au
The PFS outlines a strategy for developments through a capital efficient and market
driven approach, with VE manufacturing developed initially to build market share and
drive initial returns, prior to the larger mine site development.
Corporate
CMG successfully held its General Meeting on 6 February 2026, with all resolutions
passed.
The company is planning to attend the EXIM and SelectUSA conferences in
Washington DC, USA.
Critical Minerals Group Limited (ASX:CMG), (Critical Minerals Group, CMG, or the Company)
is pleased to provide shareholders with the following update in relation to the Company’s
activities for the quarter ended 31 March 2026 (Quarter).
COMPANY ACTIVITIES
Downstream: Vanadium Battery Energy Solutions
CMG continues to maintain close relationships with major vanadium battery suppliers and
developers, and continues to support emerging opportunities in Australia and international
markets. A key development during the PFS has been the emergence of a compelling case
for the use of VFBs to support the energy requirements of data centres, particularly
generative AI data centres.
Vanadium Flow Batteries & AI Data Centre Growth
The United States is experiencing an unprecedented surge in data centre electricity demand,
driven by rapid expansion of artificial intelligence infrastructure. US data centres consumed
approximately 183 TWh of electricity in 2024 — over 4% of national consumption — and this
figure is projected to reach 426 TWh by 2030, representing a 133% increase. The International
Energy Agency (IEA) estimates that data centres will account for nearly half of all US
electricity demand growth through to 2030, with hyperscalers such as Amazon, Microsoft,
Google and Meta collectively spending over US$200 billion on capital expenditure in 2024
alone. This structural step-change in power demand is concentrated in key hubs including
Northern Virginia and Texas, where grid infrastructure is already under significant strain, and
interconnection queues for new capacity can extend from three to five years.
This rapidly evolving energy landscape is creating compelling commercial conditions for
VFBs as a long-duration energy storage and load smoothing solution. Unlike lithium-ion
criticalmineralsgroup.com.au
systems, VFBs offer decoupled power and energy architecture — allowing capacity to be
scaled simply by enlarging electrolyte tanks — delivering 4 to 24+ hours of discharge
duration, 20,000+ full charge cycles with less than 1% annual degradation, and a calendar life
of 25–30 years. Critically, VFBs are non-flammable, eliminating thermal runaway risk that is
an increasingly material risk for large data centre campuses. These characteristics align
precisely with the requirements of AI hyperscale facilities: continuous, high-reliability power,
long operational horizons, fire-safe on-site storage, and the ability to firm intermittent
renewable energy supply. Recent US deployments — including Invinity's 24-hour campus
system at Pacific Northwest National Laboratory and TerraFlow Energy's 48 MWh project in
Texas — signal accelerating commercial momentum.
CMG views this convergence as a significant strategic opportunity for vanadium. The policy
environment has shifted decisively in favour of long-duration storage, with the US Inflation
Reduction Act providing a standalone investment tax credit of up to 70% for qualifying
storage technologies — including VFBs — and the US Department of Energy committing
US$45 million specifically for flow battery demonstrations in late 2024. As data centre
operators face growing pressure to accelerate grid interconnection, reduce peak demand
signatures, and meet 24/7 renewable energy commitments, the technical and commercial
case for VFBs strengthens materially. The Company will continue to monitor and report on
developments in this space as it advances its vanadium asset strategy.
Midstream: Vanadium Electrolyte Facility Development
CMG has incorporated a VE manufacturing facility as part of the overall PFS to assess the
complete value chain. The size and capacity of the facility, including its location, was
reviewed. Two facilities were modelled that matched the capacity required to consume 100%
of V2O5 produced from Lindfield operations. The location of the facility was evaluated based
on the optimal logistics and costs for the transportation of VE to the location of potential VFB
installations.
For the purposes of the PFS, a single manufacturing facility was modelled in Parkes, NSW.
Considering CMG’s ongoing discussions regarding offtake and supply, VE manufacturing
facilities are expected to be set up in both domestic and international locations. For this
reason, CMG has prioritised the development of the larger 24 million litre facility and has
paused expenditure on the previously planned, small scale 2 million litre VE plant.
criticalmineralsgroup.com.au
Upstream: Pre-Feasibility Study and Project Development
CMG has completed all test work associated with vanadium pentoxide production and VE
manufacture together with all PFS level design and evaluation work required for the Lindfield
mine and processing facility near Julia Creek, QLD, and the VE manufacturing facility in
Parkes, NSW. Study work is completed and all findings and assumptions are being
incorporated into the PFS financial model. The report is expected to be released in the early
part of Q4 with a summary of the findings to be shared with the market upon completion.
The PFS assessed a number of options to determine the most optimal case to progress into
the final feasibilty study. These included the production of vanadium pentoxide at both a 1
mtpa and 4 mtpa production rate which would produce approximately 3,000 tpa and 11,000-
12,000 tpa of vanadium pentoxide respectively. The capital and operating costs were
modelled for both cases. The study also assessed downstream processing of V2O5 into VE for
both production cases at a facility located in Parkes, NSW. Production capacity ranged from
24 million litres of high purity VE suitable for VFBs under the 1 mtpa case to more than 80
million litres under the 4 mtpa case.
The PFS outlines an overarching strategy to develop the Lindfield Mine and the Parkes VE
facility in a capital efficient and market driven approach. This will see the VE facility being
delivered in advance of the Lindfield Mine development, initially using third party V2O5
feedstock to manufacture VE until Lindfield is developed. Once Lindfield is developed, CMG
expects to transition to using its own V2O5 across its VE manufacturing facilities. Investment
into each stage of development will be supported by binding product offtake agreements,
initially focused on VE supply.
Metallurgical Test Work
Metallurgical test work in the Quarter focused on solvent extraction and final product
precipitation, along with additional work evaluating settling/thickening performance and
filtration response of the main product and waste streams through the flowsheet. Test work in
the leach area evaluating updates to the flowsheet developed during the PFS was also
undertaken to fully assess the risk of unexpected interactions.
The flowsheet has been locked down for the PFS, and opportunities for further optimisation
and improvement have been identified for the next phase of work leading into the feasibility
study.
criticalmineralsgroup.com.au
A key outcome of the PFS test work and flowsheet development has been improved recycling
and re-use of water throughout the circuit. This has reduced potential water losses through
evaporation and materially lowered the volume of new water or water makeup required on
an annual basis.
Figure 1: Bench scale optimisation tests in leach and solvent extraction
Development, Environmental Studies and Approvals/Permits
No additional activities were conducted on the Lindfield environmental studies required for
approvals in the Quarter. Relevant environmental study information collected to date was
evaluated and opportunities and risks were identified for inclusion in the PFS report.
Dialogue with government departments such as DNRMMRRD (Dept of Natural Resources and
Mines, Manufacturing and Regional and Rural Development), the DLGWV (Dept of Local
Government, Water and Volunteers) and DETSI (Dept of Environment, Tourism, Science and
Innovation) is ongoing with regular update meetings occurring as required.
PROJECTS AND EXPLORATION UPDATE
criticalmineralsgroup.com.au
During the Quarter, CMG continued to make progress across its vanadium projects and
tenements. CMG is also participating in an EOI for tenements recently made available
adjacent to Lindfield EPM27872.
The below map displays the locations of CMG’s current vanadium tenements.
Image: Location of CMG Limited Vanadium tenements in the Julia Creek area
Lindfield Project (EPM 27872)
The Lindfield Project is CMG’s flagship project, located 30km east of Julia Creek in North-West
Queensland. The Lindfield Project consists of 92 sub-blocks, covering 295km2
. An update on
this project is outlined below:
Progression of Pilot Plant Test Work
No additional pilot scale work was conducted during the Quarter with activities focused on
bench scale optimisation test work as described above.
Specific Environmental (EIS) Studies Conducted to Advance Approvals
Please see update above.
Upcoming Works Program
During the upcoming June Quarter, the Company plans to carry out the following work for the
Lindfield Project:
Complete PFS report
Develop recommendations for the Feasibility Study (FS)
Develop FS metallurgical testing plan for both bench scale and pilot scale testing
criticalmineralsgroup.com.au
Assess and engage supporting design and engineering firms to support the FS
Continue wet season environmental study analysis
Continue preliminary work on the EIS in anticipation of receipt of the actual terms of
reference
Engage with DETSI regarding approvals next steps
Evaluate requirements for updating the MRE for Lindfield
Attend EXIM Conference and Select USA conferences held in Washington DC in April
2026.
Lara Downs Project (EPM 28635) and Lindfield North Project (EPM 28636)
The Lara Downs and Lindfield North Project are both located within 70km (north) of Julia
Creek, with the Lindfield North Project adjoining the existing Lindfield Project and the Lara
Downs Project within 35km of the Lindfield Project.
Lindfield North consists of 36 sub-blocks covering 115 km2
. Lara Downs consists of 118 sub-
blocks covering 378km2
.
Exploration Plan for Lindfield North and Lara Downs Projects
CMG is of the opinion that both the Lindfield North Project and the Lara Downs Project can
benefit from the learnings of, and results from, exploration in the region to date.
There is no further update for these tenements for this Quarter.
Upcoming Works Program
There is no work currently scheduled for these two tenements in the upcoming June Quarter.
criticalmineralsgroup.com.au
Whinmoor Project (EPM 28631)
The Whinmoor Project consists of 100 sub-blocks covering 320 km² and is located 60km north
of Julia Creek.
The Whinmoor Project intends to extend on exploration by previous explorers and known
extensions to vanadium mineralisation in the Company’s Lindfield Project.
There is no further update for this tenement for this Quarter.
Upcoming Works Program
A drilling plan has been developed for exploration of the Whinmoor tenement, however
timing is yet to be confirmed. There is no work scheduled for this tenement in the June 26
Quarter.
Figtree Creek Project (EPM 27998) and Lorena Surrounds Project (EPM 27999)
No substantive exploration activities or fieldwork was undertaken on the Tenements for this
Quarter. The Company will continue to assess commercial options going forward.
criticalmineralsgroup.com.au
ASX ANNOUNCEMENT DURING THE QUARTER
This quarterly report contains information released to ASX, which has been reported in
accordance with the JORC Code (where required). These announcements can be found on
the Company’s website at: https://investors.criticalmineralsgroup.com.au/announcements
8 January 2026 Notice of General Meeting / Proxy Form
16 January 2026 Change in Substantial holding
30 January 2026 Quarterly Activities / Appendix 5B Cash Flow Report
6 February 2026 Results of Meeting
3 March 2026 Application for quotation of securities – CMG
3 March 2026 Notification regarding unquoted securities – CMG
3 March 2026 Cleansing Notice
3 March 2026 Change of Directors Interest Notice – S Winter
13 March 2026 Half Year Accounts
FINANCIAL COMMENTARY
The Quarterly Cashflow Report (Appendix 5B) for the Quarter provides an overview of the
Company’s financial activities.
Exploration expenditure for the Quarter was $95,833, while corporate and other expenditures
totalled $1,000,436 (including $453,661 in salaries and director fees).
In accordance with the Company’s disclosure obligations under ASX listings rule 5.3.5, the total
amount paid to directors and their associates in the Quarter (item 6.1 of the Appendix 5B) was
$214,265 and included the Managing Director’s salary.
criticalmineralsgroup.com.au
Forward-Looking Statements
This announcement may include forward-looking statements. Forward-looking statements
include, but are not limited to, statements concerning planned exploration program and
other statements that are not historical facts. When used in this document, the words such
as “could”, “plan”, “estimate”, “expect”, “intend”, “may”, “potential”, “should” and similar
expressions are forward-looking statements. Although the Company believes that its
expectations reflected in these forward-looking statements are reasonable, such statements
involve risks and uncertainties and no assurance can be given that actual results will be
consistent with these forward-looking statements.
This announcement was approved by the board of directors of CMG.
For more information contact:
Scott Winter
CEO and Managing Director
info@criticalmineralsgroup.com.au
(07) 3132 3504
criticalmineralsgroup.com.au
Schedule 1 – Tenement Schedule as of 31 March 2026
Project
Name
Location Tenement Status
Equity at 30
September
2025
Equity at 31
December
2025
Changes
during
Quarter
Lindfield
Project
Julia Creek EPM 27872 Granted 100% 100% -
Figtree
Creek
Project
Cloncurry EPM 27998 Granted 100% 100% -
Lorena
Surrounds
Project
Cloncurry EPM 27999 Granted 100% 100% -
Whinmoor
Project
Julia Creek EPM 28631 Granted 100% 100% -
Lara Downs
Project
Julia Creek EPM 28635 Granted 100% 100% -
Lindfield
North
Project
Julia Creek EPM 28636 Granted 100% 100% -
Rule 5.5
ABN
Current quarter
Year to date
(9 months)
$A’000 $A’000
1 Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration and evaluation - - 3
(b) development
(c) production
(d) staff costs - 454 - 1,169
(e) administration and corporate costs - 547 - 1,554
1.3 Dividends received (see note 3)
1.4 Interest received 7 17
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives - 900
1.8 Other (provide details if material) 2 9
Current quarter
Year to date
(9 months)
$A’000 $A’000
2 Cash flows related to investing activities or for:
2.1 Payment to acquire
(a) entities
(b) tenements
(c) property plant and equipment - 30
(d) exploration & evaluation - 96 - 671
(e) investments
(f) other non-current assets 200 200
Quarter ended (“current quarter”)
91 652 994 726 Mar-26
Appendix 5B
Name of entity
Critical Minerals Group Limited
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Consolidated statement of cash flows
1.9 Net cash from/(used in ) operating activities - 992 - 1,800
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas explortion entity quarterly cashflow report
Current quarter
Year to date
(9 months)
$A’000 $A’000
2.2 Proceeds from disposal of:
(a) entities
(b) tenements
(c) property plant and equipment
(d) investments
(e) other non-current assets
2.3 Cashflows from loans to other entities
2.4 Dividends received
2.5 Other (provide details if material)
Net cash from/(used in) investing activities 104 - 501
3 Cash flows related to financing activities
3.1
Proceeds from issues of of equity securities
(excluding convertible debt secutities)
15 2,015
3.2 Proceeds from issues of convertible debt securities
3.3 Proceeds from exercise of options
3.4
Transaction costs related to issues of equity securities or convertible
debt securities
- 125
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and borrowings
3.8 Dividends paid
3.9 Other (provide details if material)
3.10 Net cash from/(used in) financing activities 15 1,890
4
Net increase (decrease) in cash and cash equivalents for the period
4.1 Cash and cash equivalents at beginning of period 1,722.0 1,260.0
4.2 Net cash from/(used in) operating activities (Item 1.9 above) - 992.0 - 1,800.0
4.3 Net cash from/(used in) investing activities (Item 2.6 above) 104.0 - 501.0
4.4 Net cash from/(used in) financing activities (Item 3.10 above) 15.0 1,890.0
Current quarter
Year to date
(9 months)
$A’000 $A’000
4.5 Effect of movement in exchange rate on cash held
4.6 Cash and cash equivalents at end of the quarter 849 849
Consolidated statement of cash flows
2.6
Consolidated statement of cash flows
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas explortion entity quarterly cashflow report
5 Reconciliation of cash and cash equivalents Current quarter
Previous quarter
at the end of the quarter (as shown in the consolidated statement of cash
flows) to the related items in the accounts
$A’000 $A’000
5.1 Bank balances 849 924
5.2 Call deposits
5.3 Bank overdrafts
5.4 Other (provide details)
5.5
Cash and cash equivalents at end of quarter (should equal item 4.6
above)
849 924
6 Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associated included in item 1.2
214
6.2
Aggregate amount of payments to related parties and their
associates included in item 2.3
6.3
Aggregate amount of payments to related parties and their
associates included in item 3.4
7 Financing facilities
NOTE: The term "facility" included all forms of financing arrangements
avaliable to the entity
Add notes as necessary for an understanng of the sources of finance avaliable
to the entity.
Total facility amount
at quarter end
Amount drawn at
quarter end
$A’000 $A’000
7.1 Loan facilities
7.4 Total financing facilities
7.5 Unused financing facilites available at the quarter end
7.6
Include below a description of each facility above, including the lender, interest rate, maturity
date and whether it is secured or unsecured. If any additional facilities have been entered
into or are proposed to be entered into after quarter end, include details of those facilities as
well.
Note: if any amounts are shown in 6.1, 6.2 or 6.3 your quarterly report must a description and an
explanation for, such payments
Payments of salary to CEO/ Managing Director and Director Fees.
7.3
Payments to related parties of the entity and their associates
Other (please specify)
7.2 Credit standby arrangements
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas explortion entity quarterly cashflow report
8
Estimated cash available for future operating
activities
$A'000
8.1 Net cash from / (used in ) operating activities (Item 1.9) - 992
8.2
Payment s for exploration & evaluation classified as investing
activities) (item 2.1(d))
- 96
8.3 Total relevant outgoings (Item 8.1 + Item 8.2) - 1,088
8.4 Cash and equivelants at quarter end (item 4.6) 849
8.5 Unused finance facilites avaliable at quarter end (item 7.5) -
8.6 Total available funds (Item 8.4 + Item 8.5) 849
8.7
Estimated quarters of funding available (Item 8.6 divided by Item
8.3)
0.8
8.8
8.8.1 Does the entity expect that it will continue to have the current level of net operating cash flow for the
time being and if not why not ?
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its
operation and , if so, what are those steps and how likely does it believe that they will be successful?
8.8.3 Does the entity expect to be able to continue its operations and to meet its business objectives and , if so ,
on what basis?
Note: if the entity has reported positive net operating cashflows in item 8.3 answer item 8.7 as "N/A. Otherwise, a
figure for the estimated quarters of funding available must be included in item 8.7
If Item 8.7 is less than 2 quarters, please provide answers to the following questions:
Answer:
Yes. The Company's expenditure will continue to track its near term objectives that include the development of the
Lindfield Project and the establishment of the vanadium electrolyte business and manufactring facility and pursuing
opportunities for Vanadium Flow Battery installations.
Answer:
Yes. The Company has been able to raise capital as required to fund its business as most recently demonstrated
with the sucessful Placement in November 2025. The Company will continue to explore funding options to support
the Company's requirements.
Yes. Based on its history of successful capital raising and the ongoing support of major shareholders, and potential
investors and the continuted execution of its dvelopment objectives.
Note: where item 8.7 is less than 2 quarters, all questions 8.8.1, 8.8.2 and 8.8.3 above must be answered
Answer:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas explortion entity quarterly cashflow report
1
2
Date: 30-Apr-26
Authorised by: The Board
Notes
1
2
3
4
5
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has
been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of board
committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a disclosure committee, you
can insert here: “By the Disclosure Committee”.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives
a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk
management and internal control which is operating effectively.
This statement does give a true and fair view of the matters disclosed.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s
activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes
to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and
provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to
this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX
pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity
This statement has been prepared in accordance with accounting standards and policies which comply
with Listing Rule 19.11A.
Compliance statement
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX listing Rules for defined terms.
Page 5